You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Flight Test Planning for the Research Aircraft for eVTOL Enabling techNologies (RAVEN)
SBC: Wingborne Aeronautics Corporation Topic: T15In the past several years, a number of large-scale prototype electric Vertical Takeoff and Landing (eVTOL) aircraft have been flight tested by aircraft manufacturers to achieve their commercial product development goals for the Advanced Air Mobility (AAM) market. Owing to intellectual property and propriety information concerns, however, relatively few large-scale eVTOL aircraft have been flight t ...
STTR Phase I 2023 National Aeronautics and Space Administration -
Model-based Enterprise Architecture for Institutional Management Digital Twins
SBC: GLOBAL TECHNOLOGY CONNECTION, INC. Topic: T11NASA manages $40B in facility assets with an inventory of more than 5,000 facilities. Over 83% of this infrastructure is beyond its design life, and the agency faces a deferred maintenance backlog of $2.77B. An effective method to address this challenge and achieve digital transformation is through Enterprise Architecture (EA) and the use of Model-Based Systems Engineering (MBSE) methods.nbsp;Duri ...
STTR Phase II 2023 National Aeronautics and Space Administration -
Robust and Efficient WMLES Unstructured Grid Generation with HeldenMesh
SBC: Helden Aerospace Corporation Topic: A1Mesh generation for wall-modeled large eddy simulations (WMLES) based CFD simulations represents a critical area of research as there are significant challenges which must be overcome before this technology can be adopted for widespread use.nbsp; Two critical challenges associated with these scale-resolving simulations is mesh size and mesh quality.nbsp; Mesh size represents a critical challenge a ...
SBIR Phase II 2023 National Aeronautics and Space Administration -
A Lightweight Cryogenic Valve for Space Applications
SBC: Renaud Earl Topic: Z10Orbital Cryogenics is proposing to develop a new-type of integrated-pilot linear pneumatic valve, capable of providing long-life control of cryogenic liquids and associated gasses, while meeting the low-weight requirements of flight hardware. The valve will have a thermally isolated integrated pilot, with provisions for electrical pilot heat if required. The valve inlet/outlet can be any of severa ...
SBIR Phase I 2023 National Aeronautics and Space Administration -
Reserve, Remotely Activated Battery for Sage 1 Flight Control Unit for Minuteman III ICBM
SBC: BINERGY SCIENTIFIC, INC. Topic: AF231D009Thermal batteries are single discharge reserve batteries that provide very long shelf life, minimal self-discharge, wide storage temperature range, fast activation under sudden power demand, and also wide range of temperature operating conditions. Such un
SBIR Phase II 2023 Department of DefenseAir Force -
Virtual Repository for Rapid 3D Modeling of Aeronautical Technical Data for Model Based Definition Products in AF PLM-Teamcenter
SBC: GLOBAL PRECISION IMAGING, LLC Topic: AFX236DPCSO1Aircraft Availability (AA) is a chief concern for the Air Force Life Cycle Management Center (AFLCMC).This issue was stressed by Lt. Gen. Shaun Morris, Commander of AFLCMC, in his address at the Robins AFB Requirements Symposium in March 2023. He expresse
SBIR Phase II 2023 Department of DefenseAir Force -
Danti Semantic/NLP Search System for Earth Observation Data
SBC: Geodex Inc Topic: AFX236DPCSO1Air Force/Space Force users are unable to effectively search across databases using natural language search that a computer can understand, and as a result it can take years to train a new geospatial analyst. This puts multiple branches of the government
SBIR Phase II 2023 Department of DefenseAir Force -
Secure, BYOAD Enterprise Talk, Text, Video, and Data Transmission for Air Force Special Operations Command in Communications Denied/Degraded Environments
SBC: MOVIUS INTERACTIVE CORPORATION Topic: AFX236DPCSO1Current DAF communications capabilities are inadequate for supporting rapid deployment and sustained combat operations in austere, contested environments envisioned through Agile Combat Employment (ACE) concept requirements. Air Force Special Operations
SBIR Phase II 2023 Department of DefenseAir Force -
A Next-Generation(Class-6) Interactive Electronic Technical Manual and Weapons Management System for the F-16
SBC: AMERICAN DATA SOLUTIONS LLC Topic: X224OCSO1The Multipurpose Digital Data Viewer (MDDV) is the only integrative electronic technical manual of its kind on the market, uniquely built to enable condition based maintenance plus (CBM+), streamlining maintenance tasks and enabling predictive maintenance capabilities. While other IETMs rely on S1000D data, MDDV can ingest and display any data format, making it the most versatile IETM available. A ...
SBIR Phase I 2023 Department of DefenseAir Force -
Intuitive Interactive Electronic Technical Manuals (Class-6) for Next-Generation Ground Based Strategic Deterrent Systems
SBC: AMERICAN DATA SOLUTIONS LLC Topic: X224OCSO1The Multipurpose Digital Data Viewer (MDDV) is the only integrative electronic technical manual of its kind on the market, uniquely built to enable condition based maintenance plus (CBM+), streamlining maintenance tasks and enabling predictive maintenance capabilities. While other IETMs rely on S1000D data, MDDV can ingest and display any data format, making it the most versatile IETM available. A ...
SBIR Phase I 2023 Department of DefenseAir Force