You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PRIMARY COOLANT RADIONUCLIDE CHARACTERIZATION, MODELLING AND REDUCTION
SBC: Atlan-tech Inc Topic: N/AN/A
SBIR Phase I 1983 Department of Energy -
LURGI AND IN SITU-GENERATED RAW COAL GAS CONTAIN TARS, PHENOLS AND LIGHT HYDROCARBONS.
SBC: Carbotek Inc Topic: N/ALURGI AND IN SITU-GENERATED RAW COAL GAS CONTAIN TARS, PHENOLS AND LIGHT HYDROCARBONS. THESE BY-PRODUCTS ARE OFTEN UNMARKETABLE AND FORCE THE USE OF EXPENSIVE AND CUMBERSOME GAS CLEANUP SCHEMES TO REMOVE AND DISPOSE OF THEM. THIS PROJECT AIMS TO DEVELOP A CATALYTIC GAS CLEANUP STEP FOR CONVERSION OF BY-PRODUCTS IN THE RAW GAS TO ADDITIONAL H(2), CO, CO(2), AND CH(4). SUCH A CLEANUP STEP WOULD ELIM ...
SBIR Phase I 1983 Department of Energy -
COMBAT VEHICLES
SBC: Dynacom Company Topic: N/AA VARIETY OF ELECTRICAL/HYDRAULIC MOTORS, PUMPS, FANS, AND BLOWERS EMPLOYED WITHIN COMBAT VEHICLES IMPOSE UNACCEPTABLE NOISE LEVELS ON CREW MEMBERS. THIS INVESTIGATION ADDRESSES DEVELOPMENT AND EVALUATION OF A PROTOTYPE NOISE REDUCTION PROCESSOR SUITABLE FOR LATER IMPLEMENTATION WITHIN A SELF- CONTAINED HEADSET. COMMUNICATIONS BETWEEN CREW MEMBERS WOULDBE ACOUSTICALLY COUPLED WITH NOISE REDUCTION ...
SBIR Phase I 1983 Department of DefenseArmy -
NEAR-MILLIMETER WAVE FERRITE MATERIALS AND COMPONENTS RESEARCH
SBC: Electromagnetic Sciences Inc Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
THE OBJECTIVE OF THE PHASE I RESEARCH IS TO STUDY THE DEVELOPMENT OF VARIOUS TYPES OF LOW NOISE 44GHZ RECEIVER FRONT ENDS, AND TO IDENTIFY DEVELOPMENTAL DIFFICULTIES AND TECHNICAL RISKS ASSOCIATED WITH EACH DESIGN.
SBC: Millimeter Wave Technology, Topic: N/ATHE OBJECTIVE OF THE PHASE I RESEARCH IS TO STUDY THE DEVELOPMENT OF VARIOUS TYPES OF LOW NOISE 44GHZ RECEIVER FRONT ENDS, AND TO IDENTIFY DEVELOPMENTAL DIFFICULTIES AND TECHNICAL RISKS ASSOCIATED WITH EACH DESIGN. A HIGHLY RELIABLE, SPACE QUANTIFIABLE, LOW NOISE 44GHZ IS RECEIVER NEEDED. THE STUDY WILL ESTABLISH THE OPTIMUM COURSE TOWARD THE DEVELOPMENT OF THE DESIRED RECEIVER. ONE PRINCIPAL OUTP ...
SBIR Phase I 1983 Department of DefenseAir Force -
IMPROVED RADAR TRACKING AGAINST CHAFF COUNTERMEASURES
SBC: Pinson Associates Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
NONDESTRUCTIVE TESTING IN THE PRODUCTION OF URANIUM FUEL RODS COULD BE IMPROVED BY THE USE OF COMPUTERIZED TOMOGRAPHY.
SBC: Scientific Measurement Systems Topic: N/ANONDESTRUCTIVE TESTING IN THE PRODUCTION OF URANIUM FUEL RODS COULD BE IMPROVED BY THE USE OF COMPUTERIZED TOMOGRAPHY. THE SPATIAL RESOLUTION OF CURRENT TOMOGRAPHIC APPARATUS IS NOT QUITE ADEQUATE TO ACHIEVE THE REQUIRED PRECISION FOR CLADDING THICKNESS MEASUREMENT. THE APPLICATION OF TOMOGRAPHIC RECONSTRUCTION TECHNIQUES TO CONVENTIONAL DIGITAL FLUOROSCOPY DATA COULD PRODUCE THE NEEDED IMPROVEMEN ...
SBIR Phase I 1983 Department of Energy -
THIS PROPOSAL SHALL BE FOR A STUDY TO PROVIDE A COMPREHENSIVE EXAMINATION OF THE EXTENDED USE, FEASIBILITY AND ADVATAGES THAT COULD BE REALIZED BY THE USE OF A REMOTE CONTROL\MEDICAL SUPPORT VEHICLE.
SBC: Standard Manufacturing Co. Topic: N/ATHIS PROPOSAL SHALL BE FOR A STUDY TO PROVIDE A COMPREHENSIVE EXAMINATION OF THE EXTENDED USE, FEASIBILITY AND ADVATAGES THAT COULD BE REALIZED BY THE USE OF A REMOTE CONTROL\MEDICAL SUPPORT VEHICLE.THE STUDY SHALL RELATE KNOWN AND EXPECTED CONDITIONS AND PARAMETERS WHICH SHOULD LOGICALLY GUIDE A DESIGN\TRADE-OFF PHASE TO PLAUSIBLE CONCLUSIONS OF WHAT SUCH A VEHICLE COULD ACTUALLY PERFORM. THE SUB ...
SBIR Phase I 1983 Department of DefenseArmy -
PROTECTION
SBC: Sumx Research Inc Topic: N/ASUMX CORPORATION HAS DEVELOPED AND DEMONSTRATED CONCEPTUALLY NEW COATINGS FOR CORROSION PROTECTION. THE CORROSION RESISTANCE AFFORDED BY THIS METHOD IS BASED PM ELECTRON TRANSFER BETWEEN THE METAL AND IMMOBILIZED REDOX CENTERS IN THE COATING SO AS TO MAINTAIN THE METAL IN A PASSIVE CONDITION. THIS "PINNING" OF THE SUBSTRATE POTENTIAL MAY PROVIDE PROTECTION AGAINST LOCALIZED, AS WELL AS UNIFORM COR ...
SBIR Phase I 1983 Department of DefenseArmy -
PRIMARY COOLANT RADIONUCLIDE CHARACTERIZATION, MODELLING AND REDUCTION
SBC: Atlan-tech Inc Topic: N/AA MAJOR BARRIER TO EXTENDING THE BURNUP OF LIGHT WATER REACTOR FUEL IS THE BUILDUP OF FISSION PRODUCTS IN THE REACTOR COOLANT, WHICH MAY APPROACH PLANT CHEMISTRY OR EFFLUENTS TECHNICAL SPECIFICATIONS NEAR THE END OF CORE LIFE. IT IS PROPOSED TO USE CURRENTLY INSTALLED AUTOMATED ISOTOPIC REACTOR COOLANT ASSAY SYSTEMS AT UP TO FOUR OPERATING NUCLEAR POWER REACTORS TO EXPLORE THE RELATIONSHIPBETWEEN ...
SBIR Phase II 1984 Department of Energy