You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Software for the Design and Certification of Unitized Airframe Components

    SBC: VEXTEC Corporation            Topic: AF05T015

    This SBIR Phase II will demonstrate the feasibility for a unitized component structural design tool that allows for holistic risk assessment. The analysis will transform the FEA predicted stress (or strain) state into fully probabilistic assessment of uncertainty in geometry and loading throughout the component. Thereafter the design tool will conduct probabilistic microstructural damage accumulat ...

    STTR Phase II 2007 Department of DefenseAir Force
US Flag An Official Website of the United States Government