You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Evaluating the Feasibility of Cultivating Yaupon Holly for its Food Value
SBC: YAUPON Wellness Company, Inc Topic: 812Project Summary/AbstractWith over a trillion cups of caffeinated beverages consumed each year, caffeine is arguably the world's most frequently consumed stimulant. Caffeine is widely used to enhance athletic performance, body composition, pain relief, and mental acuity. Naturally caffeinated beverages include coffee, black and green tea, cola, cocoa, guarana, yerba maté, and Yaupon tea. Accor ...
SBIR Phase I 2018 Department of Agriculture -
Phytoremediation of perfluoroalkyl substances (PFAS) via phytoextraction
SBC: NUTTER & ASSOCIATES, INC. Topic: 17NCER3ANAI has a strategy to identify plant species best suited for proof-of-concept testing for phytoremediation of perfluoroalkyl substances (PFAS) via phytoextraction. Phytoextraction refers to the uptake and translocation of contaminants in the soil by plant roots into the aboveground portions of plants. Once the phytoextraction concepts are proven at the bench-scale (Phase I) and followed with succe ...
SBIR Phase I 2018 Environmental Protection Agency -
Novel Robust IR Scene Projector Technology
SBC: PHOSPHORTECH CORP Topic: A17AT018The objective of this effort is to continue the development of a dual-color MWIR display suitable for use in IR scene projection using a combination of quantum dot (QD) technology and commercial LCD displays. More efficient MWIR emitting core/shell QDs will be developed and fine-tuned during Phase II. The MWIR QDs will be deposited and patterned on a substrate to form 2-color subpixel arrays and t ...
STTR Phase II 2018 Department of DefenseArmy -
High Performance Rechargeable Thermal Battery
SBC: BINERGY SCIENTIFIC, INC. Topic: AF181018Thermal batteries are single discharge reserve batteries that provide very long shelf life, minimal self-discharge, wide storage temperature range, fast activation under sudden power demand, and also wide range of temperature operating conditions. Such unique properties among electrochemical power systems are provided with application of molten salt electrolyte, which is in solid form under normal ...
SBIR Phase I 2018 Department of DefenseAir Force -
Utilizing inter-rotor wake interaction to improve endurance and compactness of multi-rotor
SBC: ROTOYE LLC Topic: AF181043In Phase I, Rotoye will produce a multirotor design and prototype which will be optimized for indoor maneuverability with constraints on payload (> 5 lbs), size (window size), and endurance (> 25 minutes). The design will include a feasibility and performance analysis, including a sensitivity study regarding relaxation of the size constraint. An existing optimizer framework will be upgraded during ...
SBIR Phase I 2018 Department of DefenseAir Force -
FLAT Lens Antenna Technology for Compact UHF/VHF Antennas
SBC: COMPASS TECHNOLOGY GROUP, LLC Topic: AF181053CTG believes the way to advance the state-of-the-art in compact UHF/VHF antenna design is to approach it from a somewhat unconventional paradigm. Over the last few years, CTG has developed a line of near-field spot probe microwave antennas that have found effective use as Tier-1 sensors in a variety of applications. Integral to CTGs design is the incorporation of dielectric materials optimized as ...
SBIR Phase I 2018 Department of DefenseAir Force -
The Tunable and Reconfigurable Integrated Platform (TRIP) for OAM Generation, Multiplexing, Demultiplexing and Detection
SBC: R-DEX SYSTEMS, INC. Topic: AF181064R-DEX Systems proposes to team with the University of Southern California to develop the Tunable and Reconfigurable Integrated Platform (TRIP) for enabling tunable and efficient generation, multiplexing, demultiplexing, and detection of multiple orbital-angular-momentum (OAM) beams. The proposed TRIP device will build on a grating coupler structure on a silicon-on-insulator platform and will consi ...
SBIR Phase I 2018 Department of DefenseAir Force -
Big Data Cyber Analytics
SBC: Dynamite Analytics Inc Topic: AF171042Vlabs will develop a prototype of a big data analytics solution for cyber threat intelligence. The solution will be built on top of a big data platform with a goal to improve detection of complex adversarial behaviors. The system will analyze various data sources stored in a scalable data lake. Vlabs is well positioned to perform this work from the extensive experience in big data analytics and th ...
SBIR Phase II 2018 Department of DefenseAir Force -
Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions
SBC: INDUCTIVE VENTURES, INC. Topic: AF182005Normal aircraft braking is achieved through a process of reverse thrust and a system of hydraulically activated brakes located on the main wheels of the aircraft. These friction based systems offer limited performance benefits including reduced braking capabilities due to brake fade, thermal loading issues, and generally higher operational, maintenance, repair and overhaul costs over the life cycl ...
SBIR Phase I 2018 Department of DefenseAir Force -
Collaborative Virtual Combat Simulation Technology For System of Systems Research
SBC: 3D PIPELINE SIMULATION CORP. Topic: AF05210Our proposal is constructed around a mature, government-owned, distributed simulation architecture known as Joint Force Operational Readiness Combat Effectiveness Simulator (JFORCES) and a proven three-step computer-aided methodology known as Rapid Relational Modeling (RRM). The proposal includes definition, structuring and prioritizing of project goals and requirements using consensus of end-use ...
SBIR Phase I 2005 Department of DefenseAir Force