You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Intelligent Hybrid Power Management Device
SBC: ADAPTIVE MATERIALS, INC. Topic: AF05197Adaptive Materials Inc. is proposing to further the development of a Phase I SBIR Power Manager. The Power Manager Phase I device has demonstrated the ability to efficiently manage and provide power to multiple sources. The Phase I device also demonstrates a user interface that is intuitive and easy to use. This proposed effort will expand on the Phase I effort and create an improved device th ...
SBIR Phase II 2006 Department of DefenseAir Force -
Novel Routes of Drug Administration to Enhance Compliance in Soldiers
SBC: ADVANCED SENSOR TECHNOLOGIES, INC. Topic: A04201WHO estimates that between 300 and 500 million new cases of malaria occur each year and annual deaths from the disease number between 2 and 3 million. Although there are several compounds known to be effective for treating malaria, including quinine, doxycycline, primaquine, azithromycin, and erythromycin, side effects associated with the oral administration of these drugs results in incomplete m ...
SBIR Phase II 2006 Department of DefenseArmy -
Development of an Innovative Practical UAV with no Moving Aerodynamic Control Surfaces
SBC: Aerotonomy, Incorporated Topic: AF05246Prior to this project, zero net mass flux Synthetic Jet Actuators (SJAs) were used primarily as a mechanism to keep flow attached that would otherwise be separated. Thus, SJAs located near a wing’s leading edge have been shown in experimental projects such as the NASA/GTRI Stingray UAV to be effective for producing forces and moments suitable for flight control only at high angles of attack. I ...
SBIR Phase II 2006 Department of DefenseAir Force -
Multifunctional Design of Load Bearing Antenna Structures for Small UAVs
SBC: Aerotonomy, Incorporated Topic: AF05T019Aerotonomy, Incorporated, and our research institution partner Georgia Tech Research Institute (GTRI) will continue development of our unique two-stage Multi-Disciplinary Optimization (MDO) system for the design of highly integrated miniature broadband antennae for small UAVs. The concept of structurally-integrated multifunction antennae embedded into airframes is central to the DoD’s "smart sk ...
STTR Phase II 2006 Department of DefenseAir Force -
Models to Address Diplomatic, Information, Military, Economic (DIME) Factors for the Propagation/Evolution of Ideas Through Defined Populations
SBC: Veloxiti, Inc. Topic: A06094We propose to evaluate and recommend a set of candidate models of the flow and evolution of population beliefs and intentions as the starting point for developing a deployable DIME Effects Model (DEM) for tactical commanders. DIME (Diplomatic, Information, Military and Economic) seeks to avoid counter-productive and conflicting activities during tactical operations by considering these factors in ...
SBIR Phase I 2006 Department of DefenseArmy -
Transchromosomic Hens Producing Biotherapeutic Drugs
SBC: AviGenics Inc. Topic: N/ABasic science discoveries have led to the development of a series of human biotherapeutic drugs for the treatment of cancer and HIV as well as many other diseases. Currently there are over 400 drugs in clinical trials just for the first two diseases. The current biotherapeutics' manufacturing platforms have not kept pace resulting in a dramatic rise in treatment cost and more importantly unmet the ...
SBIR Phase I 2006 Department of Agriculture -
Advanced Antenna Pattern Prediction Software
SBC: CEM TECHNOLOGIES, INC. Topic: AF05T018Accurate numerical predictions of antenna performance on aircraft are important in many problems of avionics design and integration. In particular, such predictions are needed to determine optimal antenna placement on aircraft in order to achieve required coverage. The focus of this project is an investigation and development of new high-frequency computational methods and codes for accurate and e ...
STTR Phase II 2006 Department of DefenseAir Force -
UV TO IR LIGHT EMITTER
SBC: CERMET, INC. Topic: AF06T034Cermet, Inc in collaboration with Georgia Institute of Technology proposes to develop ZnO based light emitter with light emission wavelengths ranging from UV to IT. On successful completion of the proposed effort, the market place will have a unified device structure based ZnO that emits light from UV to IR. The proposed work will be accomplished by the researchers from Cermet and Georgia Institut ...
STTR Phase I 2006 Department of DefenseAir Force -
Enterprise Portal Software for Improved Situation Awareness
SBC: CYBERNET SYSTEMS CORPORATION Topic: AF05055We propose to develop an enterprise portal architecture for integrating Air Force data sources, making this information accessible through standard web appliances. Our proposed solution is a two-fold approach. First, we will develop an enterprise portal server technology that makes use of and extends Cybernet Systems OpenSkiesä networking and simulation technologies. Second, we will design and i ...
SBIR Phase II 2006 Department of DefenseAir Force -
Modular Agent-Based Component Architecture
SBC: CYBERNET SYSTEMS CORPORATION Topic: A04011The goal of this Phase II project is to develop a decision aid tool that provides for the management and arbitration of data flow between fielded assets. Our solution will act as a decision aid to support situational awareness on the battlefield. Assets can be coordinated efficiently since decision-makers and dismounted units alike will have access to the full situational picture. Our solution wil ...
SBIR Phase II 2006 Department of DefenseArmy