You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
The Design of Sub-Caliber Aero-Thermal-Chemical (ATC) Gun Projectiles for Aerodynamic Stability
SBC: Advanced Projects Research, Incorporated Topic: N/AThe following proposal details an effort required for understanding the in-bore aerodynamic stability of sub-caliber projectiles in aero-thermal- chemical (ATC) guns in order to design stable projectiles. The ATC gun is based on the concept of a projectile traveling through the propellant and deriving acceleration from the expansion of gases on the aft end of projectile. Since the projectile must ...
SBIR Phase I 1993 Department of DefenseAir Force -
Advanced Fiber Coupled Semiconductor Lasers: A Compact 10 Watt Demonstrator
SBC: APPLIED OPTRONICS CORP Topic: N/ABecause of the extreme compactness, very good portability, reliability, and ease-of-use of the diode lasers, high power systems that combine the light from several diode lasers offer significant ergonomic and economic advantages over solid state lasers in many applications. Applied Optronics Corp proposes to develop and demonstrate a compact, reliable, diode laser device that will produce 10 watts ...
SBIR Phase I 1993 Department of DefenseAir Force -
MOCVD Growth and Fabrication of High Power Mid-Infrared GaInAsSb/GaAs Diode Lasers for Operation at 2- 5 Microns
SBC: APPLIED OPTRONICS CORP Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
MICROCOMPUTER MODEL FOR ASSESSMENT OF FUEL DUMPING IMPACTS
SBC: CONTINUUM DYNAMICS INC Topic: N/AFUEL JETTISONED BY AIRCRAFT IN FLIGHT MAY POSE AN ENVIRONMENTAL HAZARD. RECENT DECISIONS TO CONVERT FROM JP-4 JET FUEL TO THE LESS VOLATILE JP-8 JET FUEL MEANS THAT THE LIKELIHOOD FOR GROUND ENCOUNTER BY THE JETTISONED FUEL IS SUBSTANTIALLY INCREASED. WHAT IS NEEDED, FOR NOT ONLY THE U.S. AIR FORCE BUT ALSO THE COMMERCIAL AIRLINE INDUSTRY, IS A FULLY OPERATIONAL AND USER-FRIENDLY PERSONAL COMPUTER ...
SBIR Phase II 1993 Department of DefenseAir Force -
"SYNTHESIS, CRYSTAL GROWTH AND CHARACTERIZATION OF CSTIOASO4 CRYSTALS FOR OPO APPLICATIONS TO 5 MICRONS"
SBC: Crystal Associates Inc Topic: N/ATHERE IS A NEED FOR OPTICAL CRYSTALS, HAVING LARGE NONLINEAR COEFFICIENTS FOR OPERATION AS OPTICAL PARAMETRIC OSCILLATERS (OPO) IN THE MID IR REGION (1.5 TO 5.0 MICRONS). SINGLE CRYSTALS OF KTIOASO4 (KTA) HAVE BEEN SHOWN TO HAVE SUPERIOR TRANSMISSION IN THIS OPTICAL REGION, HOWEVER, THE PRESENCE OF A DOMAIN STRUCTURE COMPLICATES THE UTILIZATION OF THIS MATERIAL. IN ADDITION THE NONLINEAR PROPERTIE ...
SBIR Phase II 1993 Department of DefenseAir Force -
Preparation and Characterization of KNbB2O6 for UV and IR Nonlinear Optical Applications
SBC: Crystal Associates Inc Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
MOCVD Growth and Characterization of Pseudomorphic HEHT's in a High Speed Rotating Disk Reactor
SBC: EMCORE CORP. Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
Development of a Large Area, High Throughput, Automated MOCVD System Elizabeth Aven
SBC: EMCORE CORP. Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
The Use of Gaming for Intelligent Technical Training
SBC: Galaxy Scientific Corp. Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseAir Force -
BROADBAND 60 GHz COAXIAL NOISE SOURCES
SBC: Noise Com, Inc. Topic: N/AThe Phase I objective is to develop a 10 MHz to 65 GHz (or minimum 2 GHz to 60 GHz) coaxial noise source with a low VSWR. The noise source will use a millimeter-wave noise diode developed in 1992 (as a result of contract DAALO1-89-C-O9I6) and utilize 1-85 mm connectors. It will consist of a broadband impedance-matching section, circuitry containing the diode and DC blocking capacitors, and a tempe ...
SBIR Phase I 1993 Department of DefenseAir Force