You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Just In Time (JIT) Aircraft Maintenance System
SBC: CYBERNET SYSTEMS CORPORATION Topic: AF121225ABSTRACT:The High Velocity Maintenance (HVM) initiative strives to reduce aircraft downtime while maintaining the most capable air fleet that achieves Air Force mission requirements.Unscheduled maintenance, due to issues uncovered midway into the maintenance work, introduces the most delays that negatively impact HVM turnaround time.To increase the predictability of the actual maintenance required ...
SBIR Phase II 2015 Department of DefenseAir Force -
High Capability Off-Road Active Suspension System
SBC: FLUID RIDE LTD Topic: A14061In this Phase I SBIR project, Fluid Ride will model, simulate, and virtually demonstrate their patented TRL5 Compressible Fluid Active Suspension Technology CFAST ability to improve soft soil mobility and mitigate road breakaway rollovers on 10-37 ton wheeled vehicles. Soft soil and road breakaway rollover are two of the largest mobility issues for military wheeled vehicles. Fluid Ride's CFAST has ...
SBIR Phase I 2015 Department of DefenseArmy -
Using Indigenous Materials for Construction
SBC: METNA CO Topic: A14088A versatile building system will be developed for effective use of indigenous materials towards expedient and economical construction of safe, serviceable, weather-resistant, sustainable and energy-efficiency buildings and other infrastructure systems. The indigenous materials of interest include: (i) reactive minerals such as biomass ash, natural pozzolans and lime for production of inorganic bin ...
SBIR Phase I 2015 Department of DefenseArmy -
Friction Material (brake pads) for Metal Matrix Drums
SBC: Century, Inc. Topic: A13069Century has designed and manufactured aluminum metal matrix composite (MMC) brake drums for multiple applications both military and commerical with great success. Applications include axle loads ranging from 8,000 to 23,000 lbs. As applications vary the torque requirements of the brake system also vary. To work with multiple brake systems, multiple friction materials may be required to couple the ...
SBIR Phase II 2015 Department of DefenseArmy -
Mission Command of Autonomous Systems
SBC: SOAR TECHNOLOGY INC Topic: A15032Army infantry Commanders rely on autonomous systems to gain situational awareness about what is around the next building or over the next hill. However, in smaller Army units, the Commander has limited personnel to help plan out and manage these autonomous systems. Tasking autonomous systems requires that the Commander first task the system operators, who then have to translate that intent into lo ...
SBIR Phase I 2015 Department of DefenseArmy -
Full-Scale Near-Field Acoustic Holography for Reduction of Annoyance and Disturbance
SBC: SOUND ANSWERS, INC. Topic: AF151021ABSTRACT:Noise levels of military jet aircraft have significantly increased as the power of the engines has increased creating a community noise issue around military airfields. Current noise monitoring requirements only measure sound pressure levels which do not correlate to human annoyance / disturbance. Sound Answers plans to apply their extensive Sound Quality background to establish new acous ...
SBIR Phase I 2015 Department of DefenseAir Force -
Broadband, Real-Time Non-Intrusive High-Power-Microwave Near-Felds Mapping System
SBC: ADVANCED FIBER SENSORS INC Topic: AF151025ABSTRACT:The feasibility of developing a photonics-based real-time high-power-microwave (HPM) near-field mapping system is to be investigated. The system is intended to contain multiple non-intrusive near-field sensors so that it can simultaneously detect undistorted versions of broadband HPM electric- and magnetic-field transients over a desired field-mapping area. The system will be able to take ...
SBIR Phase I 2015 Department of DefenseAir Force -
Compact High Channel Count, High Frequency, Rotating Data Acquisition and Transmission
SBC: INFRARED TELEMETRICS, INC Topic: AF151071ABSTRACT:IR Telemetrics will leverage its existing data acquisition technology to design, build, and demonstrate a Compact, High Channel Count, High Frequency, Rotating Data Acquisition and Transmission System. The modular, scale-able system will digitize with over 18-bit resolution and a minimum 300 kSPS sample rate and be able to spin at over 25,000 rpm. Data transmission will be accomplished wi ...
SBIR Phase I 2015 Department of DefenseAir Force -
Infrared Target Collection System (ITCS)
SBC: SIGNATURE RESEARCH, INC. Topic: AF151178ABSTRACT:In response to Air Force SBIR topic # AF151-178, Signature Research, Inc. proposes to develop a highly innovative solution that provides a leap forward in the collection of calibrated infrared (IR) ground mobile target signature data. The specific goals of our Phase I proposal are to conduct a trade study to evaluate multiple alternatives, and produce a preliminary design of the most desi ...
SBIR Phase I 2015 Department of DefenseAir Force -
Reduced-Order Fluid-Thermal-Structural Interactions Model for Control System Design and Assessment
SBC: APPLIED DYNAMICS INTERNATIONAL, INC. Topic: AF151189ABSTRACT:The proposed research will examine innovative approaches for real time simulation of the coupled fluid-thermal-structural response of hypersonic muntions operating on terminal trajectories for the purpose of high-fidelity closed-loop guidance and control. This will be accomplished by combining state-of-the-art model reduction approaches for CFD aerothermodynamics and FEM thermo-structural ...
SBIR Phase I 2015 Department of DefenseAir Force