You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High-Performance, Low-Power, Acceleration-Compensated Oscillator Technology
SBC: EPACK, INC. Topic: A14031The objective of this proposal is to completer the development for a new miniaturized and very low power oscillator product which provides very low phase noise even under high vibration environments. This technology will be called the Low Power, G-Compensated, Oven Controlled Crystal Oscillator (LPG-OCXO). Current state of the art acceleration compensated oscillators are 100-350 cubic centimeters ...
SBIR Phase II 2015 Department of DefenseArmy -
Hands Free Automatic Coupling Restraint System
SBC: Pratt & Miller Engineering & Fabrication, LLC Topic: A13064Pratt & Miller Engineering (PME) proposes the Hands-free Automatic Coupling Restraint System (HACRS) for use in military vehicles. HACRS is a combination of systems that automatically restrains the seated soldier and engages additional restraints during an event (i.e. underbody blasts; frontal, side, or rear crashes; rollovers; and severe driving conditions) to secure the soldier into the seat. Cu ...
SBIR Phase II 2015 Department of DefenseArmy -
Develop Efficient/Leak Proof M1 Abrams Plenum Seal
SBC: GREAT LAKES SOUND & VIBRATION INC Topic: A13061A Phase II proposal has been written that extends the results from Phase I and outlines a path to produce an improved plenum seal for the M1 Abrams tank. Phase II will focus on developing a well-engineered set of performance requirements for the plenum s
SBIR Phase II 2015 Department of DefenseArmy -
AVANT (AVatar-Administered Neuropsychological Testing)
SBC: SOAR TECHNOLOGY INC Topic: A13090The Avatar-Administered Neuropsychological Testing (AVANT) system is an automated language-based assessment system that is primarily self-administering with clearly presented directions to a patient using both visual illustrations and avatar-based verbal
SBIR Phase II 2015 Department of DefenseArmy -
Friction Material (brake pads) for Metal Matrix Drums
SBC: Century, Inc. Topic: A13069Century has designed and manufactured aluminum metal matrix composite (MMC) brake drums for multiple applications both military and commerical with great success. Applications include axle loads ranging from 8,000 to 23,000 lbs. As applications vary the torque requirements of the brake system also vary. To work with multiple brake systems, multiple friction materials may be required to couple the ...
SBIR Phase II 2015 Department of DefenseArmy -
Advanced HRI for Human-Robot Teaming
SBC: SOAR TECHNOLOGY INC Topic: A13068A fundamental challenge facing the Army is that soldiers carry too much weight, dramatically reducing their effectiveness and safety. To alleviate this excessive burden, the DoD has begun investing in robotic mules that move with squads and carry their
SBIR Phase II 2015 Department of DefenseArmy -
Ultra-Low Power Health Monitoring Sensor System
SBC: EVIGIA SYSTEMS LLC Topic: A14006This SBIR Phase II project aims to develop an ultra-low power miniature light-weight high-functionality multi-sensor health monitoring system that meets the requirements for long term (10-20 years) health management and condition based maintenance of military ordnance and sensitive equipment, including advanced missiles and guided ordnance. This system integrates temperature, humidity, ambient pre ...
SBIR Phase II 2015 Department of DefenseArmy -
Just In Time (JIT) Aircraft Maintenance System
SBC: CYBERNET SYSTEMS CORPORATION Topic: AF121225ABSTRACT:The High Velocity Maintenance (HVM) initiative strives to reduce aircraft downtime while maintaining the most capable air fleet that achieves Air Force mission requirements.Unscheduled maintenance, due to issues uncovered midway into the maintenance work, introduces the most delays that negatively impact HVM turnaround time.To increase the predictability of the actual maintenance required ...
SBIR Phase II 2015 Department of DefenseAir Force -
Ultra-High-Performance Concrete
SBC: METNA CO Topic: AF12BT04Ultra-high-performance concrete (UHPC) offers superior properties for structural applications. Existing UHPC design and production methods employ special materials and mixers. This project is developing mix design and fabrication methods for reliable production of UHPC with local materials and facilities. The Phase I project devised material selection criteria, proportioning methods and mixing pro ...
STTR Phase II 2015 Department of DefenseAir Force -
Research and Development of a Game Based technology and Database to Train Pre-Drivers, Young Drivers, and Older Drivers to Detect Traffic Hazards
SBC: Quantum Signal LLC Topic: 132FH2Recent research suggests there are opportunities to enhance driver hazard anticipation and avoidance, which could in turn dramatically impact public safety. For example, the fatality rate per 100 million vehicle miles among 16 year old drivers is some ten times higher than it is among those between the ages of 45 and 55. However, hazard-related training has traditionally been difficult to accompli ...
SBIR Phase II 2015 Department of Transportation