List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Community College- Technical School Intelligent Transportation Systems (ITS) Curricula

    SBC: Integrated Global Dimensions LLC            Topic: 151FH2

    The objective of this proposal is to design a detailed curricula framework for an ITS and Connected Vehicle industry-recognized credential program. Titled Transportation Tech, the framework will serve as a basis for developing 3 levels of online credential training in each industry. The education and professional development of technicians in the ITS field is pivotal to the future of our nation’ ...

    SBIR Phase I 2015 Department of Transportation
  2. Innovative Transit Technology Devices, Applications,or Solutions Focused on Safety, Mobility, or Energy and Sustainability

    SBC: Integrated Global Dimensions LLC            Topic: 151FT1

    The objective of this proposal is to demonstrate the feasibility of developing a “Customer Based Mobility” application, named Liberty, for enhancing transportation options for vulnerable populations and senior citizens in rural and small urban communities. Utilization of technology for route optimization and customer trip booking in rural and small urban transportation agencies is currently ve ...

    SBIR Phase I 2015 Department of Transportation
  3. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equipment specifications and architecture that wireless network equipment manufacturers can build towards. The effort will include an in-depth review of wireless technology as it applies to sensitive and ...

    SBIR Phase I 2015 Department of Transportation
  4. Next Generation Freight Truck for Autorack Cars

    SBC: Sharma & Associates, Inc.            Topic: 151FR3

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to high deck levels, freight trucks with improved track-to-vehicle dynamics as well as higher speed capabilities are desired in anticipation of higher speed passenger service and shared corridors. Unique ...

    SBIR Phase I 2015 Department of Transportation
  5. RAMSES

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: AF131204

    ABSTRACT: The floor of an ALC is like a well-orchestrated dance. However, when an unexpected failure occurs, it can introduce significant delays in not only the specific aircraft"s maintenance, but of the entire network of systems. 21st Century Systems, Inc. (21CSi) is in the position to answer this challenge with a concept called Reactive Aircraft Maintenance System via Evolutionary Scheduling ( ...

    SBIR Phase I 2015 Department of DefenseAir Force
  6. Multi-ITB-Turbo Fan for Advanced Propulsion and Power Concepts for Large Size Class Unmanned Aerial Systems (UAS), Equipped with Variable Turbine

    SBC: SPYTEK AEROSPACE CORPORATION            Topic: AF131160

    ABSTRACT: With the roll of UAVs becoming more complex, and their use more widespread, tactical requirements for performance, reliability, maintainability, supportability, and most recently low cost, have created the need for an advanced cycle propulsion system. Such an engine, must address the conflicting requirements, of large amounts of electrical power generation, while producing substantial i ...

    SBIR Phase II 2015 Department of DefenseAir Force
  7. Nonequilibrium Plasma-Assisted Combustion-Efficiency Control in Vitiated Air

    SBC: CU AEROSPACE L.L.C.            Topic: AF13AT04

    ABSTRACT: CU Aerospace (CUA) and team partner the University of Illinois at Urbana-Champaign (UIUC) propose to perform research, development and demonstration of experimental quenching free measurements of heat-release in a realistic highly turbulent plasma-assisted flame. Kinetics models will be correspondingly updated and detailed 3D multiphysics simulations will be validated by the measurements ...

    STTR Phase II 2015 Department of DefenseAir Force
  8. Advanced Detectors for Long Wave Infrared (LWIR) Communications

    SBC: NOUR, LLC            Topic: AF151050

    ABSTRACT:Using lasers as signal carriers, FSO laser communications (Laser-Com) can provide a line-of-sight, wireless, high-bandwidth, communication link between remote sites. Because of the reduced scattering, long-wavelength infrared (LWIR) 8 13 um radiation possesses significantly better all-weather transmission than the shorter wavelengths in use today. The superior transmission through common ...

    SBIR Phase I 2015 Department of DefenseAir Force
  9. Monopropellant Propulsion Unit for Cubesats (MPUC) Thruster System

    SBC: CU AEROSPACE L.L.C.            Topic: AF151066

    ABSTRACT:CU Aerospace (CUA) proposes the development of the Monopropellant Propulsion Unit for CubeSats (MPUC) thruster, a breakthrough complete propulsion system technology for CubeSats and other small satellites, because of its high performance, nontoxic chemical monopropellant and benign storage characteristics. MPUC pushes the envelope of existing propulsion technologies by significantly incre ...

    SBIR Phase I 2015 Department of DefenseAir Force
  10. High-Efficiency, Radiation-Hard Double Epitaxial Lift-Off Multi-Junction Solar Cell

    SBC: MicroLink Devices            Topic: AF151095

    ABSTRACT:MicroLink Devices, in collaboration with Dr. Scott Messenger at the University of Maryland Baltimore County (UMBC), proposes to develop an ultra-high efficiency, radiation-hard, six-junction solar cell for application to Air Force space missions. The proposed technology will comprise lattice-matched subcells grown on InP and GaAs substrates that are mechanically attached in a monolithic s ...

    SBIR Phase I 2015 Department of DefenseAir Force

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government