You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reliability-Based Design Optimization Software Package for Broader Simulation-Based Design Applications

    SBC: RAMDO Solutions, LLC            Topic: A14075

    It is critical to the US Army to have reliable ground vehicles that can be relied on to demonstrate consistently high levels of performance for survivability, mobility, and durability under a wide range of operational conditions without being subject to unanticipated premature failure, and with substantially reduced maintenance requirements. In response to critical Army needs and dual use in comme ...

    SBIR Phase II 2015 Department of DefenseArmy
  2. Powder Injection Molding Processing Using Corn-based Biopolymers

    SBC: 8VA Corporation            Topic: N/A

    This program proposes to replace petroleum-based chemicals with formulations that are less expensive and safer to use in the environment. Critical to this goal is the incorporation of biopolymer additives require as binders for powder injection molding. Water soluble, cellulose-based polymers that have been processed from wood and cotton are also useful as binders in various ceramic manufacturin ...

    SBIR Phase II 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government