You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Tomographic Coherent Ladar Based Atmospheric Turbulence Profile Characterization System
SBC: Bridger Photonics, Inc. Topic: AF141195ABSTRACT:Under this Phase II SBIR contract, Bridger Photonics and Montana State University-Spectrum Lab will design, build and deliver both a statistical scintillation tomographic system and a coherent tomographic wavefront sensor (CTWS). Both proposed systems meet the long term Air Force needs with respect to the full characterization of atmospheric turbulence along horizontal or slant paths. The ...
SBIR Phase II 2015 Department of DefenseAir Force -
N/A
SBC: Concepts NREC, LLC Topic: N/AN/A
SBIR Phase II 1999 Department of DefenseAir Force -
N/A
SBC: S&K Electronics, Inc. Topic: N/AN/A
SBIR Phase II 1999 Department of DefenseAir Force -
IMPROVED DGPS DATA RELIABILITY THROUGH THE USE OF ADVANCED SIGNAL PROCESSING TECHNIQUES
SBC: CAMBRIDGE ENGINEERING, Inc Topic: N/ATHE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP AND TEST TECHNIQUES WHICH COMBAT ATMOSPHERIC NOISE AND CONSEQUENTLY INCREASE THE RELIABLE RANGE OF THE DGPS/RADIOBEACON LINK. THE FOLLOWING IDEAS WILL BE EXPLORED AND TESTED: 1) WIDEBAND NOIS CLIPPING, LIMITING OR BLANKING OF NOISE IMPLUSES TO IMPROVE THE SIGNAL TO NOISE RATIO. 2) THE USE OF SIDE INFORMATION TO INFORM A FORWARD ERROR CORRECTING DECODER ...
SBIR Phase II 1991 Department of Transportation