You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Design Tools for Combustion Stability

    SBC: IN SPACE, L.L.C.            Topic: AF083112

    ABSTRACT:A joint experimental and computational project using a carefully designed, flexible test article is proposed to assess the velocity-coupled combustion response of a representative liquid rocket injector element to transverse acoustic disturbances. In the proposed Phase II, the response of an injector flowfield at supercritical pressure conditions will be simulated, measured, and reduced i ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Laser/Microwave Energy Deposition to Improve Control/Performance of High Speed Vehicles

    SBC: PHYSICS, MATERIALS, AND APPLIED MATHEMATICS RESEARCH L.L.C.            Topic: AF103009

    ABSTRACT:In this effort, we will couple the energy of focused microwave bursts into the air and onto surfaces by first forming a laser plasma. The presence of the laser plasma allows much lower microwave intensities to couple their energy to the laser-pre-ionized surface or air- volume, allowing more efficient energy-transfer and the use of lower-power microwave systems to achieve the desired effe ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. Wireless Power for Battlefield Airmen Operation

    SBC: Armorworks Enterprises, Inc.            Topic: AF121192

    ABSTRACT: A phase II program is proposed leading to integrate wireless inductive power transfer technology on two prototype tactical vests. The focus of the phase II program would be the development and evaluation of a full-scale inductive power transfer system on a PRC-152 radio by both modifying and interfacing its battery. Because a mating vest/pouch that contains inductive charging circuits so ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Holographic Video Display Using Novel Guided-wave Scanning System

    SBC: TIPD LLC            Topic: AF131023

    ABSTRACT:Todays analysts need improved 3D visualization tools to assist in critical situations such as deconfliction, line-of-sight analysis, air space and satellite control.Currently available 3D displays cannot provide the level of detail and comfort needed because the displays contain unacceptable visual artifacts, do not provide full parallax, require special headgear, and induce nausea in man ...

    SBIR Phase II 2015 Department of DefenseAir Force
  5. Surface Treatments for Stainless Steel Actuators

    SBC: IBC Materials & Technologies, LLC            Topic: AF131202

    ABSTRACT: Stainless steel ballscrew components, such as those found in landing gear and flap actuators on the C-130 aircraft, experience wear and subsequent failure due to corrosion, contamination and foreign object damage (FOD). High"dither"conditions, where the actuator undergoes a constant short-travel, high-frequency movement to maintain level flight, can also induce wear on actuator ballscr ...

    SBIR Phase I 2015 Department of DefenseAir Force
  6. Heterojunction GeSn based Photonic Devices

    SBC: Quanttera LLC            Topic: AF141002

    ABSTRACT: Si photonic devices based on GeSn materials will be very important for the MWIR. The Air Force recognizes the need for next-generation high-performance photonic materials in the SWIR to MWIR infrared spectrum, due in part to the atmospheric high transmissive windows in this wavelength ranges. Due to materials limitations, silicon based photonic devices have not been utilized in this wa ...

    SBIR Phase I 2015 Department of DefenseAir Force
  7. Method for Evaluating Candidates for Additive Manufacturing (AM) Processes

    SBC: IMAGINESTICS, LLC            Topic: AF141213

    ABSTRACT: A challenge which continues to present a barrier to the utilization of AM and wide spread adoption is knowing when to use the technology. This is particularly problematic in aerospace and in MRO operations because the technology is still emerging, and knowledgeable, experienced practitioners remain in short supply and will likely remain so until the next generation of technicians and en ...

    SBIR Phase I 2015 Department of DefenseAir Force
  8. Advanced Propulsion and Power Concepts for Large Size Class Unmanned Aerial Systems (UAS)

    SBC: ENGINE RESEARCH ASSOCIATES INC            Topic: AF131160

    ABSTRACT: Desired tactical requirements for unmanned aerial systems (UASs) exceed current capabilities for performance, reliability, maintainability, cost and supportability. Mission requirements such as extended endurance, increased power for auxiliary/sensor systems, and low altitude, low speed maneuverability are becoming paramount, specifically, in the 10,000 lb class of vehicles. These desir ...

    SBIR Phase II 2015 Department of DefenseAir Force
  9. A Universal Device for Performing Cricothyrotomies

    SBC: WOLF TECHNICAL SERVICES INC            Topic: DHP13015

    The purpose of this Phase II program is to develop an innovative, low cost, all-in-one surgical instrument for performing cricothyrotomies and managing airway trauma on the battlefield, with improvements aimed at ultimately reducing mortality rates associ

    SBIR Phase II 2015 Department of DefenseDefense Health Agency
  10. Micro Electro-mechanical Systems (MEMS) Safe & Arm for Rocket Motor Ignition

    SBC: Black Hills Nanosystems            Topic: MDA14022

    Ignition of rocket motors can be performed using low-volt firing components, but MIL-STD-1901A requires mechanical isolation for safety. While traditional safe & arm devices are available, they are relatively large and heavy. Recent progress in MEMS has developed miniature safe & arm devices for low-cost munitions such as 40MM grenade and airburst munitions. The Black Hills Nanosystems team has ...

    SBIR Phase I 2015 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government