You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Automated Entity Classification in Video Using Soft Biometrics
SBC: PROGENY SYSTEMS, LLC Topic: N08077Military and intelligence operations are gathering imagery from a variety of sources including ground-based sensors, aerial platforms, and satellites at rates far exceeding our ability to analyze or even transmit and archive this data. This imagery comprises not only still images but increasingly full-motion video (FMV); high-definition (HD), wide-area imagery (WAMI), and other high-resolution for ...
SBIR Phase II 2015 Department of DefenseNavy -
Improved Satellite Ground C3
SBC: Braxton Technologies, LLC Topic: AF131069ABSTRACT:Braxtons primary goal is to integrate and test advanced space asset command, control, and communications (C3) assets so that the current low bandwidth, high cost USAF systems can use high bandwidth, high reliability, low cost, automated commercial communications assets and system resource planning methods.Braxton will leverage 20 years of tracking, telemetry and commanding (TT&C), mission ...
SBIR Phase II 2015 Department of DefenseAir Force -
Air Launch Testbed for Endoatmospheric Hypersonic Trajectories
SBC: GENERATION ORBIT LAUNCH SERVICES, INC. Topic: AF141081ABSTRACT:This SBIR proposal covers the preliminary design and initial hardware and software in-the-loop testing of the GOLauncher 1, a single stage liquid air launched rocket system, for utilization in future hypersonic flight testing efforts. Major objectives include completing prelimianry design of the system based on requirements defined during Phase I, further validation of cost and schedule e ...
SBIR Phase II 2015 Department of DefenseAir Force -
Thermal Control for Operationally Responsive Space (ORS) Satellites
SBC: LOADPATH, LLC Topic: AF103107ABSTRACT:This effort will provide both a rapid, satellite thermal modeling tool and deployable radiator system specific to Responsive Space needs. The thermal analysis tool will allow users to make rapid decisions and apply appropriate hardware from a specific RS thermal toolbox. The deployable radiators, being a key component of this toolbox, will provide near isothermal radiator surfaces and a h ...
SBIR Phase II 2015 Department of DefenseAir Force -
Advanced Breakwater and Causeway Ultramarine System (ABACUS) Development
SBC: Quantum Engineering Design, Inc. Topic: N092156Subsequent Phase II Proposal, extension of Phase II contract N00014-11-C-0332Expansion of the Advanced Breakwater and Causeway Ultramarine System (ABACUS) research and development work accomplished under the Phase II Basic and Options 1 & 2 programs to full scale prototype systems and large scale demonstration models for both Seabasing and ship-to-shore logistics support operations. The ABACUS fam ...
SBIR Phase II 2015 Department of DefenseNavy -
Advancing the Frontiers of Broad Band CEM for Target Modeling Applications
SBC: HYPERCOMP INC Topic: N/AHyPerComp, a premiere developer of innovative and highly scalable computational environments for time-domain electromagnetics, proposes to develop, demonstrate and deliver the next generation TEMPUS (Time-Domain EM Parallel Unstructured Simulator)environment to perform cost-effective and routine X-band to 20 GHz computations for full-scale targets with general materials to provide highly accurate ...
SBIR Phase II 2001 Department of DefenseAir Force -
GhostSwimmer: Tactically Relevant, Biomimetically Inspired, Silent, Highly Efficient and Maneuverable Autonomous Fish Robot
SBC: BOSTON ENGINEERING CORPORATION Topic: N08T030Boston Engineerings proposed project significantly increases the Navys capabilities by providing a technology that performs superbly in tactically critical littoral and VSW applications currently unaddressed. We propose to advance the existing technology readiness level (TRL) by combining our GhostSwimmer AUV with actuation, sensing, payload, and processing technology as applicable. Our proposed p ...
SBIR Phase II 2015 Department of DefenseNavy -
SBIR Phase II- Flightworthy Prototype (FWP) Low Profile Antenna for Multi-Band (Ka SATCOM, X Band option) including Ku band Tactical Common Data Link
SBC: Pacific Antenna Systems LLC Topic: N141015Todays helicopter and vertical take-off and landing tactical unmanned air vehicle (VTUAV) warfighters are faced with challenges of interfacing and sharing sensor data, targeting information in radio systems using Beyond Line of Sight (BLOS) SATCOM and Line of Sight (LOS) network concentric communication systems. The high bandwidth required for these radio transmissions is typically greater than 10 ...
SBIR Phase II 2015 Department of DefenseNavy -
Rapid Mission Planning for Desirable Viewing Conditions
SBC: TAU TECHNOLOGIES LLC Topic: AF141012ABSTRACT: Space Situational Awareness is concerned with the physical characteristics, capabilities, operations, health, and potential threats posed by space objects. This information is gathered largely via radar and optical data collection facilities. Due to the increasingly large number of space objects and relatively limited number of collection facilities, it's important that collection operat ...
SBIR Phase II 2015 Department of DefenseAir Force -
High Sea State Automated Deployment and Retrieval of Towed Bodies from a Small Surface Platform
SBC: PacMar Technologies LLC Topic: N141058This objective of this proposal is to demonstrate an automated towed-body Deployment-Retrieval (D-R) system on ACTUV. A control system monitors ship motions and the relative distance between the water surface and deck at the stern. Data from the sensors are processed and the optimal time to release or capture the payload is determine and executed. The D-R system is intended to prevent damage due t ...
SBIR Phase II 2015 Department of DefenseNavy