You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SIGMA: Speedy Imagery Geo-registration and Motion Analysis

    SBC: VISION SYSTEMS INC            Topic: AF131151

    ABSTRACT: VSI proposes the development of the SIGMA (Speedy Imagery Geo-registration and Motion Analysis) system, which will address three key requirements by the end of Phase II: (i) adapt to different type of sensors, sensor-configurations and sensor operating conditions, (ii) handle large amount of data in real-time or close to real-time using limited resources, and (iii) operate under conditi ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Prediction and Measurement of the Carbon Build-Up in Film-Cooled Rocket Engines

    SBC: SIERRA ENGINEERING, INC.            Topic: AF15AT21

    ABSTRACT: Sierra Engineering Inc. (Sierra) believes that existing chemical kinetic models can be efficiently incorporated into commercial CFD codes to predict the mixing, pyrolysis, soot formation and carbon deposition within film cooled rocket engines. During this Phase I STTR effort we will demonstrate that this analysis capability is practical and that we can generate appropriate model validati ...

    STTR Phase I 2015 Department of DefenseAir Force
  3. Lateral Flow Immunoassay for Rapid Detection of Borrelia burgdorferi from Ticks

    SBC: DXDISCOVERY INC            Topic: DHP15006

    Lyme disease is a vector-borne illness caused by infection with B. burgdorferi. Hard ticks (Ixodes spp.) acquire the spirochete from a natural reservoir of small mammals; transmission to humans occurs via the bite of an infected tick. By any measure, Lyme disease is one of the most serious emerging infectious diseases that threaten public health in the United States. New estimates from the CDC ind ...

    SBIR Phase I 2015 Department of DefenseDefense Health Agency
  4. Tool to Assess State of Digital System after Electromagnetic Disruption

    SBC: Embedezyne LLC            Topic: AF151010

    ABSTRACT: Commercial off the shelf (COTS) electronic components have long been used by many companies in a wide range of industries to assist in their day to day operations. Most companies today use COTS computer workstations, servers, and networking devices in one form or fashion. While cost effective, COTS components are not required to adhere to strict Electromagnetic Compatibility (EMC) standa ...

    SBIR Phase I 2015 Department of DefenseAir Force
  5. Modular, Low Cost Fixture for Evaluating OML Treatments for Stress-Strain Loading During Environmental Conditioning

    SBC: Material and Process Solutions, LLC            Topic: AF141167

    ABSTRACT:Material and Process Solutions LLC will build a modular, outer mold line (OML) gap fatigue test fixture that can be used to predict the overall lifetime of a complete OML stack-ups (gap filler and coatings) used on aircraft.We will evaluate two complete OML stack-ups at three conditions: no exposure, and both sequential and concurrent environmental conditioning and fatigue testing.The mod ...

    SBIR Phase II 2015 Department of DefenseAir Force
  6. Electrically Responsive Energetics for Variable Yield Weapons

    SBC: Digital Solid State Propulsion, Inc            Topic: AF141145

    ABSTRACT:This Phase II SBIR is the continuation of DSSPs Phase I work into the development of their novel solid state energetic material into an extremely insensitive, non-toxic, and electrically controllable explosive as a replacement for current Mk 82/83/84 bomb fills. This additional insensitivity does not sacrifice performance, as chemical performance modeling shows that an aluminized version ...

    SBIR Phase II 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government