You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Superconducting Undulator Test Cryostat Development
SBC: CRYOMAGNETICS INC Topic: C5506aC55-06a-270224-AbstractDemand for increased brightness of synchrotron light sources has been driven by advances in novel experimental techniques studying nanomaterials, micro- and nanocrystals, and interactions of atomic and molecular structures. Strong demand has pushed technologies of low emittance electron sources, novel concepts in electron storage rings, free electron lasers (FELs) and undula ...
SBIR Phase I 2023 Department of Energy -
Superconducting Undulator Test Cryostat Development
SBC: CRYOMAGNETICS INC Topic: C5506aC55-06a-270224-AbstractDemand for increased brightness of synchrotron light sources has been driven by advances in novel experimental techniques studying nanomaterials, micro- and nanocrystals, and interactions of atomic and molecular structures. Strong demand has pushed technologies of low emittance electron sources, novel concepts in electron storage rings, free electron lasers (FELs) and undula ...
SBIR Phase I 2023 Department of Energy -
Robust cost-effective characterization of petrophysical properties in sedimentary geothermal applications leveraged by drilling data and cuttings
SBC: GREENPATH SYSTEMS LLC Topic: C5513aPetrophysical properties such as porosity and permeability are arguably the most important parameters in enhancing geothermal heat production through better completion design and stimulation plan. Collecting well logs are often passive and associated with additional costs. In addition, many logging packages cannot sustain high-temperature formations often observed in geothermal conditions. In thes ...
SBIR Phase I 2023 Department of Energy -
Multiphysics Motor Design Software Package Using MFEM
SBC: IERUS TECHNOLOGIES INC Topic: C5501bC55-01b-270447-AbstractAs device designs become more complex and incorporate new, advanced technologies and materials, accurate simulations of multi-physics phenomenology become critical to ensuring that such design and analysis efforts are successful. The diversity of problems of interest to the Department of Energy (DOE) and wider audiences includes examples such as electric motor/generator desi ...
SBIR Phase I 2023 Department of Energy -
Extended SWIR Single Photon Avalanche Photo Detector Technology for Bioimaging
SBC: AMETHYST RESEARCH INC Topic: C5519bThere are two principal technical limitations and challenges associated with bioimaging. First, depth imaging is limited by light scattering and diffraction in biological tissue. Second, classical high flux multiphoton optical imaging causes photo-damage to cellular viability and perturbations to molecular biological processes. This renders the sample unusable for repeated in situ imaging and proh ...
SBIR Phase I 2023 Department of Energy -
Agricultural Decarbonization Achieving Climate-Smart Food Production and Justice40 Goals
SBC: UNIVERSAL SCHEDULE & BOOKING LLC Topic: C5610aAgricultural practices are a major driver of climate change, contributing globally 19–29% of anthropogenic greenhouse gas (GHG) emissions. However, the costs to small and mid-size farms to engage in and produce climate-smart farming practices and consumer-branded products are out of reach, in terms of time and money. The adoption of circular smart agriculture provides a pathway to combat the uns ...
STTR Phase I 2023 Department of Energy -
High-Performance Small Wind Turbine Blade for Mass Production
SBC: BERGEY WINDPOWER COMPANY, LLC Topic: C5617aUnder new federal incentives, sales of small wind turbines for farms and rural homes are increasing exponentially, but the current methods of blade production do not scale well and are limiting manufacturing growth. The current manufacturing method involves hours of hand work and a total manufacturing cycle of several days. Faster and less expensive methods of producing small wind turbines blades ...
SBIR Phase I 2023 Department of Energy -
ThreatHelm: Enhanced Cyber Resiliency
SBC: SENTAR, INC. Topic: C5640hWith the expectation of global nuclear energy to continue growth for the next several decades, the threat of cyber attacks will follow due to the increasing importance of the energy sector, emerging technologies and the continuously evolving capabilities of potential adversaries. Current accepted approaches for managing cyber risks focus on preventing access to critical systems by using tools such ...
SBIR Phase I 2023 Department of Energy -
Process Engineering Technology for Manufacture of High-Performance Radiation Detection Semiconductor Materials
SBC: AMETHYST RESEARCH INC Topic: C5603aC56-03a-273587For national security and non-proliferation missions, there is a need for the development of radiation detectors that simultaneously exhibit good energy resolution, high efficiency, high sensitivity, and good uniformity over an area > 15 cm2 without a need for deep cooling. The development of new materials is seen as a leading option for fulfilling this need. In work by other groups, ...
SBIR Phase I 2023 Department of Energy -
High-resolution/high-precision PEM Quality Control
SBC: RESONON, INC. Topic: C5618hHigh-quality, defect free, and consistent thickness Proton Exchange Membrane (PEM) films are required to ensure maximum efficiency and longevity over the life of hydrogen fuel cells or electrolyzers utilizing this technology. The current technologies of PEM film Quality Assurance (QA) and defect detection rely on human inspection, which can be subjective and labor intensive, or measurement technol ...
SBIR Phase I 2023 Department of Energy