You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Nondestructive Taper-Lok Fastener Hole Inspection Without Fastener Removal for Thick, Multi-Layer Structures
SBC: POSITRON SYSTEMS, INC. Topic: AF04134The ability to detect cracks within Taper-Lok fastener holes associated with thick, multi-layer wing structures without removing the fastener presents significant challenges to existing nondestructive inspection technologies. Critical fastener hole inspections for sections of the B-1B wing structures require removal of the Taper-Lok fasteners followed by eddy current inspection, at a cost project ...
SBIR Phase I 2004 Department of DefenseAir Force -
A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER
SBC: Ei International Inc. Topic: N/AIT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...
SBIR Phase I 1988 Department of Energy -
A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY
SBC: Ei International Inc. Topic: N/AN/A
SBIR Phase I 1988 Department of Energy