You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advantages of Two-Phase Switched Reluctance Machines for More Electric Aircraft Power Generation

    SBC: ISOTHERMAL SYSTEMS RESEARCH            Topic: N/A

    The current development of an electric power generation system for the More Electric Aircraft (MEA) is based on a low-risk extension of existing three-phase, switched reluctance machine (SRM) technology. This research program proposes to study an alternate two-phase SRM and its associated power-conditioning converter. By the nature of the proposed machine, it has 50% of its stator coils active at ...

    SBIR Phase I 1994 Department of DefenseAir Force
  2. Metallic Ion Removal via Neutral Presipitation and Cross Flow MicroFiltration

    SBC: Environmental R & D, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  3. Novel System for the Decontamination of Firefighter Training Facility Wastes

    SBC: Innovative BioSystems, Inc.            Topic: N/A

    Treatment and disposal of surfactant-laden waste waters is a significant problem at firefighter training facilities, as well as in real world use. The extremely high foaming potential and chemical oxygen demand of these waters restricts their discharge into sewage treatment plants. Improved treatment processes must be developed for aqueous firefighting foams, hydrocarbons, and their degradation by ...

    SBIR Phase I 1994 Department of DefenseAir Force
  4. Machinability of AF 1410 and AerMet 100 High Strength Steel

    SBC: MACHINING RESEARCH INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
  5. Advanced Combat Rubber Raiding Craft (Small)

    SBC: Maravia Corp            Topic: N/A

    The Combat Rubber Raiding Craft (Small) (CRRC(S)) is used by Special Operations Forces (SOF). The current craft, underway, produces a highly discernible bow wave that enhances its probability of detection. A primary means of reducing the detect- ability of the CRRC(S) is to decrease the bow wave and wake of the craft that will enhance the survivability of the craft and crew in the combat arena. To ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  6. Fully Automated, High Performance SAW Microsensor Array for Mobile Air Sampling and Chemical Monitoring

    SBC: Microsensor Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  7. Miniature RF Receiving Antenna

    SBC: Scientech, Inc.            Topic: N/A

    SCIENTECH proposes to design, develop, and test an ultra-broadband active biconical antenna, fabricated from thin copper clad fiber glass or teflon (PCB). This active biconical antenna will be designed and be compatible with existing receivers, will be extremely low physical profile, and yet support effective reception in the HF, VHF, and UHF frequency ranges. The ultra-broadband active biconical ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  8. Rapid Synthetic Environment Tool for Virtual Battlespace 2 (VBS2)

    SBC: ENOMALIES, LLC            Topic: N132130

    This proposal is in response to rapid modeling need in our military force. We plan to develop and demonstrate a framework that will allow warfighters to rapidly acquire and edit geospecific terrain databases, including both building exterior and interiors. The output of our models will be in standard 3D format, which can be used in a variety of simulation and training software, including VBS2. We ...

    SBIR Phase I 2014 Department of DefenseNavy
  9. Electro-Optic and Infrared Situational Awareness Display

    SBC: HITRON TECHNOLOGIES INC            Topic: N132110

    To address a Navy need for a high resolution full color situational awareness displays to optimize human interface for Navy personnel, ships, and crafts, Hitron Technologies Inc. proposes to develop a see-through full color transparent flexible display with collaboration of Liquid Crystal Institute of Kent State University. The transparent flexible display is based on innovative integration of a f ...

    SBIR Phase I 2014 Department of DefenseNavy
  10. Selective Availability Anti-Spoofing Module (SAASM) Compliant GPS Receiver for GEO

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: AF141113

    The objective of this proposal is to develop Selective Availability Anti-Spoofing Module (SAASM) compliant GPS receiver for Geosynchronous Earth Orbit (GEO) applications. In this proposal, we explore an approach to design the GEO GPS SAASM receiver based on improved techniques for signal acquisition (or detection) and then signal tracking (and demodulation) of weak GPS signals. GPS signals availa ...

    SBIR Phase I 2014 Department of DefenseAir Force
US Flag An Official Website of the United States Government