List
The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.
-
THE OBJECTIVE IS TO ASSESS THE FEASIBILITY OF INTEGRATING DECISION ANALYSIS, ARTIFICIAL INTELLIGENCE AND OPERATIONS RESEARCH PLANNING AIDS INTO AN INTEGRATED SET OF AIDS FOR PERFORMING FUNCTIONS IN OCA MISSION PLANNING, FROM THE TARGET NOMINATION LEVEL
SBC: Advanced Decision Systems Topic: N/ATHE OBJECTIVE IS TO ASSESS THE FEASIBILITY OF INTEGRATING DECISION ANALYSIS, ARTIFICIAL INTELLIGENCE AND OPERATIONS RESEARCH PLANNING AIDS INTO AN INTEGRATED SET OF AIDS FOR PERFORMING FUNCTIONS IN OCA MISSION PLANNING, FROM THE TARGET NOMINATION LEVEL DOWN THORUGH THE SPECIFIC ROUTE PLANNING LEVEL. PHASE I EFFORT WILL EMPHASIZE TECHNOLOGY ISSUES RATHER THAN ENGINEERING DESIGN AND BUILD ISSUES. TH ...
SBIR Phase I 1983 Department of DefenseAir Force -
A NEW NDE CAPABILITYFOR THIN-SHELLED STRUCTURES
SBC: Aracor Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
A HIGH TEMPERATURE CERAMIC COMPOSITE
SBC: Amercom Inc Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
PROJECTILE PULSE GENERATOR
SBC: ANCO ENGINEERS, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
FIFFTY GIGAWATT PULSED PLASMA MHD POWER SUPPLY
SBC: Artec Associates Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
THERE WILL BE A CONTINUING NATIONAL DEFENSE NEED FOR LOW-COST SOLID OR LIQUID FUEL VEHICLES TO BE COMPLEMENTARY TO THE REUSABLE SPACE SHUTTLE.
SBC: Astrotech Inc Topic: N/ATHERE WILL BE A CONTINUING NATIONAL DEFENSE NEED FOR LOW-COST SOLID OR LIQUID FUEL VEHICLES TO BE COMPLEMENTARY TO THE REUSABLE SPACE SHUTTLE. SUCH EXPENDABLE VEHICLES, MUST BE CREATED FROM THE EXISTING FAMILY OF ROCKET MOTORS AVAILABLE TO THE ARMED FORCES IF DEVELOPMENT TESTS ARE TO REMAIN LOW. ASTROSPACE, INC. HAS DEVELOPED A ROCKET VEHICLE CONCEPT THAT COMBINES THE TRADITIONAL BENEFITS OF BUNDL ...
SBIR Phase I 1983 Department of DefenseAir Force -
KNOWLEDGE-BASED SYSTEMS
SBC: Computer Cognition Topic: N/ATHE NEED FOR MUCH HIGHER PERFORMANCE FOR VERY LARGE DATA IS CRITICAL FOR MANY COMMERCIAL AND MILITARY APPLICATIONS. THE RESEARCH EFFORT WILL TEST THE FEASIBILITY OF DEVELOPING A COMPUTER ARCHITECTURE WHICH TAKES ADVANTAGED OF NEAR TERM 30 MB\SEC, 1-TERABYTE CAPACITY TECHNOLOGY IN OPTICAL DISK MEMORIES. THE EFFORT INCLUDES DEVELOPMENT OF SYNTACTICAL AND SEMANTIC CODES SUITABLE FOR HIGH SPEED PARSIN ...
SBIR Phase I 1983 Department of DefenseAir Force -
STATE (BUBBLE MEMORY) RECORDER
SBC: Seakr Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force -
AND TRANSFER SYSTEM FOR IMPODING PLASMA EXPERIMENTS
SBC: Energy Compression Research Topic: N/AIMPLODING PLASMA EXPEIMENTS SUCH AS SHIVA ARE TYPICALLY ENERGIZED WITH LARGE AND EXPENSIVE CAPACITOR BANKS. INDUCTIVE STORAGE WHILE SUBSTANTIALLY MORE COMPACT SUFFERS FROM SWITCH EFFICIENCY AND CURRENT MULTIPLICATION CIRCUITY PROBLEMS (SEE REF 1). THE MEAT GRINDER IS A GENERIC CIRCUIT INVENTED BY THE PRINCIPLE INVESTIGATOR THAT TRANSFERS CURRENT FROM ONE INDUCTOR TO ANOTHER REVERISBLY WITHOUT THE ...
SBIR Phase I 1983 Department of DefenseAir Force -
METAL/PHASE CHANGE MATERIAL COMPOSITE HEAT SINKS
SBC: Energy Science Laboratories, Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseAir Force