You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Tool-Condition-Monitoring System for Surface-Integrity-Adaptive Milling and Repair

    SBC: HILL ENGINEERING LLC            Topic: AF21ATCSO2

    Conventional “subtractive” machining is a huge industry with critical implications for USAF and DOD. The vast majority of safety-critical parts are manufactured using subtractive machining because it produces excellent dimensional tolerance and a high-qua

    STTR Phase II 2023 Department of DefenseAir Force
  2. An Adaptable, Cost-Effective, Real-Time 3D Vision System for Advanced Manufacturing

    SBC: KRTKL INC.            Topic: AF21ATCSO2

    Accurate, high-performance 3D vision frameworks will play a key role in the development of advanced manufacturing. These systems will employ the use of powerful data feature extractors such as deep neural networks (DNNs). However, in terms of size, latenc

    STTR Phase II 2023 Department of DefenseAir Force
  3. Effects-Driven Multi-Domain Planning

    SBC: KESTREL TECHNOLOGY LLC            Topic: AF21BT001

    Military missions often have a deep hierarchical structure due to the need for extensive support for the top-level goal.  A typical strike mission in an Air Tasking Order (ATO) has the top-level goal to degrade specific targets.  To achieve that goal, pla

    STTR Phase II 2023 Department of DefenseAir Force
  4. Precision Pointing for High Resolution Optical and RF Remote Sensing Satellites

    SBC: K2 SPACE CORPORATION            Topic: X22DOTCSO1

    K2 Space is developing the Giga Class satellite bus, an ultra-high-power spacecraft capable of delivering over 115kW of power and 15,000kg of payload mass to enable previously unattainable capabilities spanning ISR (Intelligence, Surveillance, and Reconna

    STTR Phase II 2023 Department of DefenseAir Force
  5. Application of Compaction, Artificial Intelligence and Video Compression Algorithms to SAR Images

    SBC: ATOMBEAM TECHNOLOGIES INC.            Topic: X22DOTCSO1

    The proposed solution integrates AtomBeam's Neural Compaction software technology into the (RDUCE) program and SOSA platform, enabling efficient connectivity and data transmission among platforms and systems. AtomBeam's unique Compaction technology utiliz

    STTR Phase II 2023 Department of DefenseAir Force
  6. Uncertainty Visualization in Virtual Reality for ISAM Human-in-the-Loop Mission Training using High Fidelity Simulations

    SBC: GRID RASTER INC            Topic: AF21STCSO1

    GridRaster leverages the advancements in cloud technologies, immersive interfaces, Artificial Intelligence (AI) and processing speeds, to build an open-architecture high-performance, high-precision and scalable XR platform. GridRaster’s breakthrough XR pl

    STTR Phase II 2023 Department of DefenseAir Force
  7. Safe Autonomy for Multi-Vehicle Rendezvous Proximity Operations of Under-Actuated Satellites

    SBC: TOYON RESEARCH CORPORATION            Topic: AF21STCSO1

    The rise of low-cost, private space launch services and the proliferation of low cost micro-satellites has created new opportunity and changes for the spaceflight community. While these developments have opened the door to new kinds of missions and applic

    STTR Phase II 2023 Department of DefenseAir Force
  8. Autonomously Generating White Cell Training Scenarios

    SBC: MICROSURGEONBOT INC            Topic: X22DOTCSO1

    The need for accelerating U.S. Space Force personnel training has been coined by the U.S. Space Command Gen James Dickinson. Setting up training scenarios using the latest and best simulation exhausts lots of valuable resources. In order to maintain Unite

    STTR Phase II 2023 Department of DefenseAir Force
  9. Elevated Autonomous Rescue Signal and Antenna (EARSA)

    SBC: Battle Sight Technologies LLC            Topic: X22DOTCSO1

    The rescue of isolated personnel is significantly hampered by the limitations of signaling devices in fauna defined landscapes. Beacons, smoke, and flares are unable to penetrate dense vegetation canopies effectively and heavy overgrowth limits line-of-si

    STTR Phase II 2023 Department of DefenseAir Force
  10. In-situ On-Orbit Monitoring and Inspection of Satellite Structures

    SBC: ACELLENT TECHNOLOGIES INC            Topic: AF21STCSO1

    Space-based assets form the backbone of today’s communication, navigation, and defense industries. Key assets, such as satellites, are highly vulnerable to unexpected damage during their lifetimes from impacts with other vehicles, micrometeoroids, and spa

    STTR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government