You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT ACCELERATOR-BASED NEUTRON SOURCE FOR BAGGAGE INTERROGATION

    SBC: Accsys Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  2. DEVELOPMENT OF A MODEL FOR THE SYSTEM EFFECTIVENESS EVALUATION OF ADVANCED BASING CONCEPTS

    SBC: ACTA, LLC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  3. SYMBOLIC RF SIGNATURE PREDICTION

    SBC: Advanced Decision Systems            Topic: N/A

    THIS EFFORT WILL ASSESS THE TECHNICAL STATE OF THE ART FOR MODELBASED VISION APPROACHES TO ANALYZING RADAR AND OTHER ACTIVE SENSOR IMAGERY. MODEL-BASED APPROACHES RELY HEAVILY ON USING SEMANTIC MODELS TO PREDICT IMAGE OBJECTS AND FEATURES IN A MANNER THAT FACILITATES RECOGNITION OF THE OBJECT IN THE IMAGE. TO DATE, RESEARCH IN THIS AREA HAS FOCUSED PREDOMINATELY ON OPTICAL IMAGERY. THE STUDY WILL ...

    SBIR Phase II 1987 Department of DefenseAir Force
  4. AN AUTOMATED INJURY CODING PROGRAM

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  5. SMART COMMUNICATIONS

    SBC: ADVANCED DIGITAL SYSTEMS, INC.            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO EXPLORE THE POTENTIAL OF FINITE INDUCTIVE SEQUENCE PROCESSING (FISP) (A PROPRIETARY PROCESSING TECHNIQUE OWNED JOINTLY BY ADS AND CIS) TO PROVIDE AUTOMATED DECISIONS AND CONTROL REQUIRED TO EFFECT OPTIMUM EMPLOYMENT OF AIRCRAFT ONBOARD COMMUNICATIONS IN THE YEAR 2000 AND BEYOND. FISP IS AN ALGORITHMIC APPROACH TO A KNOWLEDGE BASED ARTIFICIAL INTELLIGENCE (AI) SYS ...

    SBIR Phase I 1987 Department of DefenseAir Force
  6. SUPERVOLTAGE NDE TECHNIQUES FOR LARGE AEROSPACE STRUCTURES

    SBC: Aracor            Topic: N/A

    INNOVATIVE TECHNICAL APPROACHES FOR DETECTING AND CHARACTERIZING BULK DEFECTS IN LARGE AEROSPACE STRUCTURES ARE URGENTLY NEEDED. THE INTEGRITY OF BONDED SURFACES IN THE Y-JOINT AND RESTRICTER REGIONS OF LARGE SOLID BOOSTERS, SUCH AS TITAN 34D MOTORS, IS A GOOD EXAMPLE OF A CRITICAL APPLICATION WITHOUT A DEPENDABLE INSPECTION METHOD. IN FULLY ASSEMBLED T34D MOTORS, THESE ZONES, WHICH ARE THE MOST C ...

    SBIR Phase I 1987 Department of DefenseAir Force
  7. NDE FOR COMPOSITE STRUCTURES

    SBC: Aracor            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  8. AUTOMATED AIR TRAFFIC CONTROL SYSTEM CONCEPTS

    SBC: Airspace Technology Corp            Topic: N/A

    FUTURE MILITARY AIR TRAFFIC CONTROL (ATC) SYSTEMS WILL USE TECHNOLOGIES SIGNIFICANTLY ADVANCED OVER TODAY'S EQUIPMENTS. THE SYSTEM WILL BE PASSIVE IN THAT THEY WILL USE AIRCRAFT DERIVED POSITION DATA IN LIEU OF PRIMARY AND SECONDARY RADAR DATA. IT WILL BE HEAVILY RELIANT ON AUTOMATED AND SEMI-AUTOMATED PROCESSING TECHNIQUES FOR TRACKING, ROUTING AND THE OTHER BASIC CONTROL FUNCTIONS. THE CONTROLLE ...

    SBIR Phase I 1987 Department of DefenseAir Force
  9. TRAFFIC MANAGEMENT CONCEPT EVALUATION

    SBC: Akm Associates, Inc.            Topic: N/A

    AN AIR-TRAFFIC FLOW MANAGEMENT (ATFM) TOOL BASED EITHER ON STRICT MATHEMATICAL FORMULATION AND OPTIMIZATION, AND/OR ONEBASED ON HEURISTIC KNOWLEDGE ABOUT DISTRIBUTING THE FLOW OVER THE NETWORK MAY PROVIDE A SOLUTION TO THE PROBLEM, PERHAPS MUCH BETTER AND OBJECTIVE THAN THE ONE MADE PRESENTLY BY A CADRE OF EXPERTS UNDER STRESSFUL CONDITIONS. THE SYSTEM SHOULD COMPLEMENT THE HUMAN DECISIONS MADE DA ...

    SBIR Phase I 1987 Department of Transportation
  10. ADVANCED MANNED AERIAL SCOUT

    SBC: Amas Consortium            Topic: N/A

    THE ADVANCED MANNED AERIAL SCOUT (AMAS) PROJECT ISA PHASE PROGRAM TO DEFINE AND DEVELOP A MODERN, LIGHT, FIXED-WING AIRCRAFT TO BE THE LINCHPIN OF COMBINED-ARMS OPERATIONS AND DOMINATE THE LOW-ALTITUDE BATTLEFIELD ARENA. IT IS INTENDED NOT ONLY TO REPLACE EXISTING OBSERVATION AIRCRAFT, BUT ALSO TO SUPPLANT THE CURTAILED OH-58D PROGRAM, COMPLIMENT THE LHX, ACAF, AND INTERIM CAS PROGRAM, AND MAKE PO ...

    SBIR Phase I 1987 Department of DefenseAir Force
US Flag An Official Website of the United States Government