You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 8535 results
  1. DLA222-007-0130 Conversion Coated Surfaces for Hypersonic Environments PHASE II Proposal

    SBC: Peregrine Falcon Corporation            Topic: DLA222007

    Near term fielding of Hypersonic vehicles will rely upon readily available and proven materials like refractory metals that are at an MRL of 9.  In some cases, these metals may require environmental protective coatings; these metal alloys could be based upon Tungsten (W), Niobium (Nb), or Hafnium (Hf).  Refractory materials typically survive high temperatures but oxidize under high temperatures ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. Assuring DLA’s Supply Chain for a Critical Circuit Card Assembly (NSN 7730-01-532-4524) with a New Source of Supply (NSOS) Phase II Proposal

    SBC: GDCA            Topic: DLA213001

    Following the research performed in Phase I, GDCA proposes to rebuild the supply chain and manufacturing capability to create a form-fit-functional New Source of Supply for NSN 7730-01-532-4524 to avoid CASREPs and provide a long-term manufacturing source. GDCA will accomplish this by using the original technical data to rebuild the manufacturing capability as the OEM did, and solve DMSMS componen ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. Precision Pointing for High Resolution Optical and RF Remote Sensing Satellites

    SBC: K2 SPACE CORPORATION            Topic: X22DOTCSO1

    K2 Space is developing the Giga Class satellite bus, an ultra-high-power spacecraft capable of delivering over 115kW of power and 15,000kg of payload mass to enable previously unattainable capabilities spanning ISR (Intelligence, Surveillance, and Reconna

    STTR Phase II 2023 Department of DefenseAir Force
  4. ADAPTATION EFFORTS AND A LIVE DEMONSTRATION TO PROVIDE OPERATIONAL FLEXIBILITY FOR LOW-COST TACTICAL LAUNCHES

    SBC: ABL SPACE SYSTEMS COMPANY            Topic: AF193CSO1

    ABL’s concept for the STRATFI subject solution is to enable operational flexibility for responsive launch. In other words, ABL seeks to give users of responsive launch the ability to task payloads, launch sites, and target orbits as needed. This is made e

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Digital AI Secure Twin (DAST) System

    SBC: METRONOME SOFTWARE, LLC            Topic: DLA232004

    Digital twins mirror a real-world system to let designers and engineers examine in realistic detail how different conditions will affect it. However with their deployments, digital twins literally open their own cyberattack surfaces. Without cyber means of protection, digital twins can provide cyber criminals with a new way to access and exploit sensitive information. Another concern is that digit ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  6. Precision Inventory for Distribution Center (PIDC) Using Battery-Free RFID Systems

    SBC: DIRAC SOLUTIONS, INC.            Topic: DLA232005

    To address the DLA need for an automated inventory system that integrates with DLA databases such as warehouse management system (WMS), and the warehouse execution system (WES), Dirac Solutions, Inc. proposes to develop a new Precision Inventory for Distribution Centers (PIDC). DSI’s proposed feasibility study for Precision Inventory for Distribution Centers (PIDC) leverages the experience gaine ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Applying the FLiCert Design and Certification Support Tool to OEM eVTOL Applications

    SBC: ADVANCED ROTORCRAFT TECHNOLOGY, INC.            Topic: AFX20DTCSO1

    Through a previous AFWERX STTR Phase II contract, Advanced Rotorcraft Technology, Inc. (ART) has developed a high-fidelity simulation-based FLight Certification tool (FLiCert) for design, test, and certification support for Vertical Takeoff and Landing (V

    STTR Phase II 2023 Department of DefenseAir Force
  8. Human-Machine Teaming Biomagnetic Sensor

    SBC: SONERA MAGNETICS INC            Topic: AF224D028

    The Air Force has a distinct focus on Agile Combat Employment where Human Machine Teaming can and will be the difference maker in developing multi-capable airmen and teams. Humans can most efficiently team up with machines when the machines can get input

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Catalytic Propellant Decomposition Chamber for Multi-Mode Propulsion

    SBC: PHASE FOUR, INC.            Topic: AF203CSO2

    Under this TACFI effort, Phase Four will develop a propellant decomposition chamber (PDC) designed to break down ASCENT (“Advanced Spacecraft Energetic Non-Toxic” or formerly AF-M315E) and High Purity Hydrazine (HPH) propellants into a gaseous decomposed

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Digital Multisensory Augmented Reality for Special Warfare (DMARS)

    SBC: IMAGIZE, LLC            Topic: AF2240008

    We are proposing to develop a novel wide field-of-view digital visual augmentation system with hybrid night vision capability and digitally fused thermal imaging.  Based on our team’s current capabilities as well as newly available materials and component

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government