You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Electrical Contacts and Packaging for Diamond and Diamondlike High-Power Devices
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: AF06189The purpose of this Phase-I SBIR is to demonstrate the feasibility of using filtered cathodic arc deposition (FCAD) to fabricate improved metal multilayer Ohmic and Schottky contacts to CVD diamond. Polycrystalline CVD diamond substrates will be acquired, on which eight Ohmic and two Schottky contact metal multilayer architectures will be fabricated using FCAD. Linear transmission line model (LTLM ...
SBIR Phase I 2006 Department of DefenseAir Force -
A SMART Lego system for Space Structures
SBC: ACELLENT TECHNOLOGIES INC Topic: AF06273Acellent Technologies proposes to develop a modular plug-and-play system for satellite panel pattern recognition and structural integrity determination. The SMART Lego system will be designed to meet the challenges of the plug-and-play structures program namely (1) Allow for efficient transfer of information between panels and components, (2) Manufacturing methods to efficiently embed additional f ...
SBIR Phase I 2006 Department of DefenseAir Force -
Refractory Coatings on Mechanically Resilient Insulators
SBC: ACREE TECHNOLOGIES INCORPORATED Topic: AF05005The purpose of this Phase-II project is to build upon the promising results achieved during Phase-I, where it was shown that ceramic coatings raised the breakdown voltage and reduced the amount of damage and improved the recovery after a breakdown event for plastic insulators. The main goals of the Phase-II are to (1) coat actual insulators for the Shiva and HPM devices for testing, (2) to optimiz ...
SBIR Phase II 2006 Department of DefenseAir Force -
Structure from Motion
SBC: ACUITY TECHNOLOGIES, INC. Topic: AF04170We propose to develop a superior 3D surface reconstruction algorithm that operates on monocular aerial video. High quality pose estimates from inertial data will be used to construct dense depth maps of the 3D environment. Each 3D pixel in the reconstruction will be extracted from multiple views in the redundant video stream to minimize the error in the reconstruction. We will refine and adapt the ...
SBIR Phase II 2006 Department of DefenseAir Force -
Non-Invasive Model Attitude and Deformation Measurement
SBC: ACUITY TECHNOLOGIES, INC. Topic: AF06298A shape capture system for field and industrial capture of surface contours and discontinuous shapes is proposed. The system will provide accuracy of 0.01 inch or better at over 1 million points distributed over a region 100 inches across from three or more images obtained with a high resolution handheld digital camera. A tripod or bench mounted projector projects a pattern onto the surface from ...
SBIR Phase I 2006 Department of DefenseAir Force -
Develop Flow-Field Seeding for Large Tunnels
SBC: Advanced Projects Research, Incorporated Topic: AF06297The Air Force seeks a large production wind tunnel seeding system with full field steering capability. Additionally, the system must offer control of the particle size and density along with minimal maintenance and flow disturbance characteristics. These features will increase tunnel productivity, and compliment nonintrusive flow visualization techniques, such as Particle Image Velocimetry (PIV) ...
SBIR Phase I 2006 Department of DefenseAir Force -
Optical Pre-Amplifier Pixel Arrays for Laser Radar Applications
SBC: Aerius Photonics, LLC. Topic: AF06142The next generation of autonomously guided munition seekers requires the development of imaging LADAR systems capable of detection through obscurants at greater ranges and with greater precision and speed while reducing system cost, weight, and power consumption. Aerius Photonics has developed an advanced optical pre-amplifier pixel technology to enhance the performance of LADAR receiver systems ...
SBIR Phase I 2006 Department of DefenseAir Force -
Long Endurance Fuel Cell System for Small Unmanned Aerial Vehicles
SBC: AEROVIRONMENT, INC. Topic: AF06180For operational and logistic reasons, the warfighter requires longer flight duration hand-launched, Small Unmanned Aerial Vehicles (SUAVs). PUMA, a 9-ft wingspan SUAV, designed and manufactured by AeroVironment (AV), has a flight duration of four hours on primary batteries, while Dragon Eye, another AV SUAV, with a 4-ft wingspan, has a flight duration of one hour on secondary batteries. Single use ...
SBIR Phase I 2006 Department of DefenseAir Force -
Automated Exploitation of High-Gain Acoustic Arrays Using Adaptive/Learning Techniques
SBC: AETC, INC. Topic: AF05219The current situation in Iraq is making it extremely clear that the urban environment is a chaotic and dangerous battle space. Currently available technology cannot provide the level of real-time situational awareness needed by each individual soldier. DARPA has determined that Sparse Conformal Acoustic Network (SCAN) technology, or soldier-worn acoustic-array “vests,” is a potential solution ...
SBIR Phase II 2006 Department of DefenseAir Force -
Miniature Wide Band Power Amplifiers for Miniature Munitions
SBC: AETHERCOMM, INC. Topic: AF06125Aethercomm will investigate feasibility of producing an amplifier covering a 225 to 2000 MHz frequency range with an output power of 50 watts. Potential wideband gap materials will be evaluated to suit this need. Additionally, a space study will be conducted to ensure the final product will conform to the desired 25 cubic inch form factor. A preliminary thermal analysis will also be coducted in ...
SBIR Phase I 2006 Department of DefenseAir Force