List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    THERE HAS RECENTLY BEEN HEIGHTENED CONCERN FOR THE POSSIBILITY THAT NUCLEAR POWER-PLANT ACCIDENTS DURING SHUTDOWNS COULD BE IMPORTANT CONTRIBUTORS TO THE OVERALL RISK PROFILE OF THESE PLANTS. THE 1986 SOVIET ACCIDENT AT CHERNOBYL WAS THE PRINCIPAL EVENT THAT LED TO THIS HEIGHTENED CONCERN, BUT A FEW RECENT EVENTS AT U.S. PLANTS HAVE ALSO CONTRIBUTED. TODAY, IT IS WIDELY UNDERSTOOD THAT THE RISK OF ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  6. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    THE PROPOSED RESEARCH WILL PROVIDE PROOF OF PRINCIPLE OF NEWRADIATION DETECTION TECHNOLOGY THAT WHEN FULLY DEVELOPED WILL PREVENT INADVERTENT DISPOSAL OF RADIOACTIVE MATERIAL INLANDFILLS AND SEWAGES. THE TECHNOLOGY WILL PROVIDE ORDER OFMAGNITUDE IMPROVEMENT IN DETECTION OVER CONVENTIONAL SYSTEMS. THE TECHNOLOGY WILL PROVIDE FIELD RUGGED AND COST COMPETITIVE DEVICES. THE PROPOSED RESEARCH WILL PROV ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  7. DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. X-BAND, AIR-TO-AIR RADAR SIDELOBE CLUTTER MITIGATION THROUGH ADAPTIVE PROCESSING X-BAND, AIR-TO-AIR RADAR SIDELOBE CLUTTER MITIGATION THROUGH ADAPTIVE PROCESSING

    SBC: Adaptive Sensors Inc.            Topic: N/A

    AN ADAPTIVE ARRAY SIGNAL PROCESSOR CAPABLE OF ADAPTIVELY NULLING MULTIPE SIDELOBE JAMMERS AND SIDELOBE DISTRIBUTED AND DISCRETE GROUND CLUTTER RETURNES COMPETING WITH THE TARGET RETURN, IN AI-LOW OBSERVABLE TARGET DETECTING MEDIUM-PRF RADARS IS THE SUBJECT OF A DESIGN STUDY. THE ASI-DEVELOPED AIRBORNE RADAR ADAPTIVE ARRAY SIMULATION TEST BED (IMPLEMENTED IN A PC-286 COMPUTER) IS PROPOSED TO BE USE ...

    SBIR Phase II 1992 Department of DefenseAir Force
  9. SPACE-TIME ADAPTIVE PROCESSING IN BISTATIC AIRBORNE RADARS

    SBC: Adaptive Sensors Inc.            Topic: N/A

    MONOSTATIC RADAR SYSTEMS USING SPACE-TIME ADAPTIVE PROCESING (STAP) HAVE BEEN SIMULATED IN DETAIL AND SHOWN TO PROVIDE LARGE IMPROVEMENTS IN MOVING TARGET DETECTION. AND TRACKING CAPABILITY. THE PROPOSED STUDY WILL APPLY STAP TECHNOLOGY TO BISTATIC RADARS WITH AIRBORNE RECEIVERS AND AIRBORNE OR STATIONARY TRANSMITTERS. CANCELLATION OF CLUTTER IN A BISTATIC RADAR IS COMPLICATED BY THE RAPIDLY VARYI ...

    SBIR Phase I 1992 Department of DefenseAir Force
  10. A REAL-TIME MONITORING SYSTEM FOR NON-INTRUSIVE SOOT DIAGNOSTICS

    SBC: Aerometrics Inc.            Topic: N/A

    THE PRESENT WORK DEALS WITH THE DESIGN, DEVELOPMENT, TESTING AND IMPLE MENTATION OF A REAL-TIME MONITORING SYSTEM TO DETERMINE THE PARTICLE S IZE DISTRIBUTION OF SOOT. THE NOVEL TECHNIQUE SHALL MAKE USE OF MULTI WAVELENGTH ANALYSIS OF THE LIGHT SCATTERING PROPERTIES OF THE PARTICLE S TO INFER THE PARTICLE INDEX OF REFRACTION, THE SOOT NUMBER DENSITY A ND THE PARTICLE SIZE DISTRIBUTION. THE PHASE I ...

    SBIR Phase I 1992 Department of DefenseAir Force

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government