You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
X-BAND, AIR-TO-AIR RADAR SIDELOBE CLUTTER MITIGATION THROUGH ADAPTIVE PROCESSING X-BAND, AIR-TO-AIR RADAR SIDELOBE CLUTTER MITIGATION THROUGH ADAPTIVE PROCESSING
SBC: Adaptive Sensors Inc. Topic: N/AAN ADAPTIVE ARRAY SIGNAL PROCESSOR CAPABLE OF ADAPTIVELY NULLING MULTIPE SIDELOBE JAMMERS AND SIDELOBE DISTRIBUTED AND DISCRETE GROUND CLUTTER RETURNES COMPETING WITH THE TARGET RETURN, IN AI-LOW OBSERVABLE TARGET DETECTING MEDIUM-PRF RADARS IS THE SUBJECT OF A DESIGN STUDY. THE ASI-DEVELOPED AIRBORNE RADAR ADAPTIVE ARRAY SIMULATION TEST BED (IMPLEMENTED IN A PC-286 COMPUTER) IS PROPOSED TO BE USE ...
SBIR Phase II 1992 Department of DefenseAir Force -
SPACE-TIME ADAPTIVE PROCESSING IN BISTATIC AIRBORNE RADARS
SBC: Adaptive Sensors Inc. Topic: N/AMONOSTATIC RADAR SYSTEMS USING SPACE-TIME ADAPTIVE PROCESING (STAP) HAVE BEEN SIMULATED IN DETAIL AND SHOWN TO PROVIDE LARGE IMPROVEMENTS IN MOVING TARGET DETECTION. AND TRACKING CAPABILITY. THE PROPOSED STUDY WILL APPLY STAP TECHNOLOGY TO BISTATIC RADARS WITH AIRBORNE RECEIVERS AND AIRBORNE OR STATIONARY TRANSMITTERS. CANCELLATION OF CLUTTER IN A BISTATIC RADAR IS COMPLICATED BY THE RAPIDLY VARYI ...
SBIR Phase I 1992 Department of DefenseAir Force -
LASER-BASED DETECTION OF CONTAMINATION ON ADHESIVE BONDING SURFACES
SBC: Advanced Technologies/Laboratories Intl Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
AEROACOUSTIC DIFFRACTION AND DISSIPATION BY A SHORT PROPELLER COWL IN SUBSONIC FLIGHT
SBC: Advanced Projects Research, Incorporated Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
ADVANCED AREA DETECTOR FOR REAL-TIME RADIOGRAPHY OF AEROPROPULSION MATERIALS ADVANCED AREA DETECTOR FOR REAL-TIME RADIOGRAPHY OF AEROPROPULSION MATERIALS
SBC: Aracor Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
COMPACT RUGGED LASER DOPPLER VELOCIMETER PROBE FOR IN-FLIGHTGAS TURBINE INLET FLOW MEASUREMENT
SBC: Aerometrics Inc. Topic: N/AMEASUREMENTS OF THE INLET FLOW FIELDS OF AIRCRAFT PROPULSIONSYSTEMS ARE IMPORTANT IN DEFINING THE THRUST AND EFFICIENCY OF THESE ENGINES AS WELL AS IN FLIGHT SAFETY WHEN EXECUTING AVOIDANCE MANEUVERS. THIS PROJECT WILL DEVELOP A NON-INTRUSIVE LASER-DOPPLER VELOCIMETER (LDV) PROBE THAT IS COMPACT AND RUGGED ENOUGH TO PERFORM THESE MEASUREMENTS IN FLIGHT. THIS LDV PROBE WILL REPLACE THE MORE INTRUSI ...
SBIR Phase II 1992 National Aeronautics and Space Administration -
A REAL-TIME MONITORING SYSTEM FOR NON-INTRUSIVE SOOT DIAGNOSTICS
SBC: Aerometrics Inc. Topic: N/ATHE PRESENT WORK DEALS WITH THE DESIGN, DEVELOPMENT, TESTING AND IMPLE MENTATION OF A REAL-TIME MONITORING SYSTEM TO DETERMINE THE PARTICLE S IZE DISTRIBUTION OF SOOT. THE NOVEL TECHNIQUE SHALL MAKE USE OF MULTI WAVELENGTH ANALYSIS OF THE LIGHT SCATTERING PROPERTIES OF THE PARTICLE S TO INFER THE PARTICLE INDEX OF REFRACTION, THE SOOT NUMBER DENSITY A ND THE PARTICLE SIZE DISTRIBUTION. THE PHASE I ...
SBIR Phase I 1992 Department of DefenseAir Force -
A NOVEL SPRAY COMBUSTION STUDY: STOCHASTIC MODELING COUPLEDWITH LASER DIAGNOSTICS
SBC: Aerometrics Inc. Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
A COMPREHENSIVE AUTOMATED AERODYNAMIC DATA REDUCTION SYSTEM FOR AEROBALLISTIC RANGES
SBC: Aerospacecomputing, Inc. Topic: N/AAEROBALLISTIC RANGES PROVIDE INVALUABLE DATA FOR DESIGNING AIR DELIVERABLE MUNITIONS AND ARMAMENT. PRESENT METHODS FOR OBTAINING AERODYNAMIC COEFFICIENTS FOR THESE MUNITIONS ARE CUMBERSOME AND TIME CONSUMING. DATA REDUCTION INVOLVES A LONG SEQUENCE OF INDIVIDUAL STEPS WHICH CAN TAKE FROM SEVERAL DAYS TO WEEKS. BECAUSE OF THE SLOW TURN AROUND TIME, ERRORS ARE NOT CORRECTED DURING THE TEST. THE INEX ...
SBIR Phase I 1992 Department of DefenseAir Force -
INFLATABLE SMART MISSILE WING DESIGN EVALUATION
SBC: AEROTECH ENGINEERING & RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseAir Force