You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Vacuum Arc Nano Thrusters for Nanosatellite Spacecraft Constellations

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    "AASC, in collaboration with team member General Dynamics, Space Propulsion Systems, proposes to advance the Vacuum Arc Thruster (VAT) one step closer to flight qualification status. Phase I successfully demonstrated the low system mass and performancecharacteristics necessary to support "precision propulsion" requirements for constellation based, nano satellite missions. Phase II will benchmark t ...

    SBIR Phase II 2002 Department of DefenseAir Force
  2. High Power, High Voltage, Ultra-Fast UV Triggered Diamond Switch

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    "The successful Phase I high power, high voltage UV triggered diamond switch effort has set the stage for this Phase II program, in response to commercial drivers found in the directed energy weapon, military radar, high speed rail transportation, and powerutility industrial sectors. The 1 MW power switching laboratory demonstrations for periods up to 10's of nanoseconds will be extended to protot ...

    SBIR Phase II 2002 Department of DefenseAir Force
  3. ATO Link: A Link Analysis and Information Dominance Tool for ATO Planning

    SBC: DEUMBRA, INC.            Topic: N/A

    "The objective of this Phase I effort is to produce "ATO Link", an operational link analysis prototype, that can predict and identify planning and re-planning conflicts during the ATO (Air Tasking Order) planning process. The analyst will have thecapability to perform many "what if" scenarios and ATO Link will determine if there would be any future potential plan conflicts.ATO Link extends our cu ...

    SBIR Phase I 2002 Department of DefenseAir Force
  4. Link Analysis for Dynamic Planning and Execution

    SBC: DEUMBRA, INC.            Topic: N/A

    "The objective of this Phase II effort is the development and operationaltest insertion of ATO Link, an effects-based dynamic planning andscheduling tool that exploits link analysis and optimizationtechnologies. This capability can be inserted into TAP, the Theatre AirPlanning System currently in operation at Air Force Air OperationCenters (AOCs). This technology directly adds value to the current ...

    SBIR Phase II 2002 Department of DefenseAir Force
  5. Ultra-Wide Band Surveillance Radar

    SBC: AKELA INC            Topic: N/A

    "This proposal seeks to investigate the feasibility of using a stepped frequency, wideband radar for the wide area surveillance of fixed and mobile assets. The proposed radar was developed with sponsorship from the National Institute of Justice forconcealed weapons detection, and is currently being used on an AFRL program to develop a wall penetrating, imaging sensor system.The proposed radar has ...

    SBIR Phase I 2002 Department of DefenseAir Force
  6. A Computational Model of Information Fusion for Situation Assessment

    SBC: QUIMBA SOFTWARE, INC.            Topic: N/A

    "The overall objectives of this proposal are: to develop computational techniques for the information fusion problem as it relates to Situation Monitoring and Assessment.We decompose the Situation Assessment problem into two parts. The first part is the mapping of the raw state of the world (the structural description of the world) to semantic situational features which are relevant to the target ...

    SBIR Phase I 2002 Department of DefenseAir Force
  7. WAVES RF Spectrum Utilization Monitoring System

    SBC: Advent Systems, Inc.            Topic: N/A

    "This Phase II SBIR program will design, develop, and demonstrate an automated RF spectrum monitoring system capable of detecting and locating RF emitters and interference sources operating in a military test range environment. The system will trackauthorized spectrum usage and report unauthorized utilization in near real time, using automated signal interception, interference analysis, and advan ...

    SBIR Phase II 2002 Department of DefenseAir Force
  8. Long-Stroke Isolation System for Large Flexible Space Structures

    SBC: AEC-Able Engineering Company, Inc.            Topic: N/A

    "The proposed SBIR Phase 1 program will conceptually develop a lightweight long stroke isolation system for large flexible space structures, and ready this technology for a follow-on SBIR Phase 2 hardware validation program. The isolation system technologyto be developed will provide mechanical/electrical connection and dynamic isolation between large steerable deployable appendage and spacecraft ...

    SBIR Phase I 2002 Department of DefenseAir Force
  9. Dynamic DC Source and Load System with Energy Recycle Capability

    SBC: AEROVIRONMENT, INC.            Topic: N/A

    "The development of batteries, fuel cells, flywheels, and other portable energy sources requires power electronics devices to test performance parameters. In most cases, the power electronics devices serve as a load, distributing energy to the grid. Forbatteries, the devices can also serve as a source of energy for charging. To date, these devices have only been available and cost-effective for ...

    SBIR Phase I 2002 Department of DefenseAir Force
  10. 72kw Hydrogen Fuel Genset

    SBC: AEROVIRONMENT, INC.            Topic: N/A

    "The Clean Air Act requires flight line Ground Support Equipment (GSE) to convert from highly polluting diesel engine technology to electric or hybrid-electric operation as a measure to mitigate overall airport emissions. The proposed Phase I effort willinvestigate the feasibility of replacing a conventional 72kW diesel engine generator set (genset) with a fuel cell/battery power plant in a hybri ...

    SBIR Phase I 2002 Department of DefenseAir Force
US Flag An Official Website of the United States Government