You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Coatings for Helmet Mounted Display Visors using Filtered Cathodic Arc Plasma Deposition
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: N/AAlameda Applied Sciences Corporation (AASC) proposes to develop and commercialize stable, more durable and less expensive optical multi-layer coatings that can turn a visor into a display screen for helmet mounted display devices, with minimal impact onthe pilot's overall visual acuity. The innovation proposed is to use filtered cathodic arc plasmas to deposit high density optical coatings that a ...
SBIR Phase I 2001 Department of DefenseAir Force -
Vacuum Arc Nano Thrusters for Nanosatellite Spacecraft Constellations
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: N/AAlameda Applied Sciences Corporation proposes to develop a new type of nano-thruster electric engine for highly parallel, distributed constellations of nano-satellites and other space propulsion applications. A key feature of the proposed Phase-I is theuse of an Inductive Energy Store (IES) driver to power the vacuum arc nano-thruster, which has a mass of 90% PPU efficiency from 1-10 W. The provin ...
SBIR Phase I 2001 Department of DefenseAir Force -
High power, high voltage, ultra-fast, UV triggered diamond switch
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: N/AAlameda Applied Sciences Corporation (AASC) proposes to develop a new type of high voltage, high power diamond switch potentially capable of switching GW power levels at ~100 kV. The basic element of this switch is a thin disk of natural or CVD diamondthat supports up to 25 kV, is triggered into conduction by UV radiation, achieves rise/fall times
SBIR Phase I 2001 Department of DefenseAir Force -
DEVELOPMENT OF A MODEL FOR THE SYSTEM EFFECTIVENESS EVALUATION OF ADVANCED BASING CONCEPTS
SBC: ACTA, LLC Topic: N/AACTA INC., USING KARAGOZIAN AND CASE AS A SUBCONTRACTOR, PROPOSES TO DEVELOP SPECIFICATIONS AND A COMPUTER PROGRAM WHICH CAN BE USED IN THE EVALUATION OF THE SYSTEM EFFECTIVENESS OF VARIOUS CANDIDATE ADVANCED BASING CONCEPTS. ACTA WILL MAKE USE OF SOFTWARE (ASTEP) WHICH IT HAS ALREADY DEVELOPED AS A BASIS FOR A PROGRAM WHICH CAN BE DELIVERED AT THE END OF PHASE I. THE PROGRAM CONCEPT WILL BE MODUL ...
SBIR Phase II 1989 Department of DefenseAir Force -
Munition Effectiveness Modeling and Technology Integration Research
SBC: ACTA, LLC Topic: N/AA 24-month Phase II project is proposed to develop and implement models that capture the fidelity of high fidelity physics-based (HFPB) models in a fast-running format. It is anticipated that such models will be incorporated in certain modules of theModular Effectiveness/Vulnerability Assessment (MEVA) code developed for and currently used by the Air Force for assessing munitions effectiveness an ...
SBIR Phase I 2001 Department of DefenseAir Force -
Munition Effectiveness Modeling and Technology Integration Research
SBC: ACTA, LLC Topic: N/AA 24-month Phase II project is proposed to develop and implement models that capture the fidelity of high fidelity physics-based (HFPB) models in a fast-running format. It is anticipated that such models will be incorporated in certain modules of theModular Effectiveness/Vulnerability Assessment (MEVA) code developed for and currently used by the Air Force for assessing munitions effectiveness an ...
SBIR Phase II 2001 Department of DefenseAir Force -
ALGORITHM FOR DETECTING SLOWLY MOVING TARGETS WITH SBR
SBC: Adaptive Sensors Inc. Topic: N/ASPACE BASED RADARS WITH LENS OR REFLECTOR ANTENNAS CAN READILY PROVIDE MULTIPLE BEAM OUTPUTS. OTHER SBR DESIGNED TO DETECT AND TRACK AIRCRAFT, INCLUDING SYSTEMS WITH CORPORATE FED ARRAY ANTENNAS, MAY PROVIDE MONOPULSE SUM AND DIFFERENCE OUTPUTS FOR ANGLE MEASUREMENT. A METHOD IS DESCRIBED FOR EXPLOITING THESE MULTIPLE BEAM OR MONOPULSE ANTENNA OUTPUTS FOR THE DETECTION OF SLOW-MOVING TARGETS WITH ...
SBIR Phase II 1989 Department of DefenseAir Force -
X-BAND, AIR-TO-AIR RADAR SIDELOBE CLUTTER MITIGATION THROUGH ADAPTIVE PROCESSING X-BAND, AIR-TO-AIR RADAR SIDELOBE CLUTTER MITIGATION THROUGH ADAPTIVE PROCESSING
SBC: Adaptive Sensors Inc. Topic: N/AAN ADAPTIVE ARRAY SIGNAL PROCESSOR CAPABLE OF ADAPTIVELY NULLING MULTIPE SIDELOBE JAMMERS AND SIDELOBE DISTRIBUTED AND DISCRETE GROUND CLUTTER RETURNES COMPETING WITH THE TARGET RETURN, IN AI-LOW OBSERVABLE TARGET DETECTING MEDIUM-PRF RADARS IS THE SUBJECT OF A DESIGN STUDY. THE ASI-DEVELOPED AIRBORNE RADAR ADAPTIVE ARRAY SIMULATION TEST BED (IMPLEMENTED IN A PC-286 COMPUTER) IS PROPOSED TO BE USE ...
SBIR Phase II 1992 Department of DefenseAir Force -
SPACE-TIME ADAPTIVE PROCESSING IN BISTATIC AIRBORNE RADARS
SBC: Adaptive Sensors Inc. Topic: N/AMONOSTATIC RADAR SYSTEMS USING SPACE-TIME ADAPTIVE PROCESING (STAP) HAVE BEEN SIMULATED IN DETAIL AND SHOWN TO PROVIDE LARGE IMPROVEMENTS IN MOVING TARGET DETECTION. AND TRACKING CAPABILITY. THE PROPOSED STUDY WILL APPLY STAP TECHNOLOGY TO BISTATIC RADARS WITH AIRBORNE RECEIVERS AND AIRBORNE OR STATIONARY TRANSMITTERS. CANCELLATION OF CLUTTER IN A BISTATIC RADAR IS COMPLICATED BY THE RAPIDLY VARYI ...
SBIR Phase I 1992 Department of DefenseAir Force -
VERIFICATION AND VALIDATION OF AI SOFTWARE
SBC: Advanced Decision Systems Topic: N/ANEW VERIFICATION AND VALIDATION (V&V) TECHNIQUES ARE NEEDED FOR USE WITH AI SOFTWARE. FORTUNATELY, AI SYSTEMS HAVE SEVERAL FEATURES THAT CAN BE USED IN NEW WAYS TO SUPPORT VERIFICATION AND VALIDATION; IN PARTICULAR, AUTOMATIC REASONING ABOUT DECLARATIVE REPRESENTATION CAN CHECK FOR CONSISTENCY AND OTHER PROPERTIES OF RULES, REASONING ABOUT UNCERTAINTY CAN BE USED TO ACHIEVE ROBUTNESS IN THE FACE O ...
SBIR Phase II 1989 Department of DefenseAir Force