You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CHARACTERIZATIONOF SEMICONDUCTORS WITH RESOLUTION DOWN TO LUM

    SBC: Aracor            Topic: N/A

    NEAR-SURFACE DEFECTS IN SEMICONDUCTORS HAVE A PRIMARY INFLUENCE UPON DEVICE PROPERTIES, PARTICULARLY THE YIELD. IT WOULD BE VERY USEFUL TO BE ABLE TO MAP SPATIALLY THE DENSITY AND TYPE OF DEFECTS NEAR A SEMICONDUCTOR SURFACE EITHER AS A WAFER QUALITY CONTROL STEP OR TO SUPPORT DEVICE PHYSICAL EXPERIMENTS. CONVENTIONAL TECHNIQUES USED FOR THIS PURPOSE SUFFER FROM ONE OR MORE OF THE FOLLOWING LIMITA ...

    SBIR Phase I 1984 Department of DefenseAir Force
  2. A NEW RADIOGRAPHIC CORROSION INSPECTION CAPABILITY

    SBC: Aracor            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  3. A HIGH TEMPERATURE CERAMIC COMPOSITE

    SBC: Amercom Inc            Topic: N/A

    THERE IS A NEED FOR A GOOD STRUCTURAL CERAMIC MATERIAL THAT CAN BE USED AT HIGH TEMPERATURES IN THE OXIDIZING AND CORROSIVE ATMOSPHERE OF TURBINE ENGINES AND THAT CAN BE FORMED ECONOMICALLY TO COMPLEX SHAPE WITH LOW WEIGHT. THE OBJECTIVE OF THIS RESEARCH PROJECT IS TO INVESTIGATE A NEW FAMILY OF CERAMIC COMPSITE MATERIALS THAT MAY MEET THOSE REQUIREMENTS. IT IS BASED ON CHEMICALLY VAPOR DEPOSITED ...

    SBIR Phase II 1984 Department of DefenseAir Force
  4. PROJECTILE PULSE GENERATOR

    SBC: ANCO ENGINEERS, INC.            Topic: N/A

    PROJECTILE PULSE GENERATOR (PPG) HAS BEEN CONCEIVED TO SATISFY ANTICIPLATED AIR FORCE REQUIREMENTS. THE PPG IS EXPLOSIVELY DRIVEN AND IS INTENDED TO MEET THE REQUIRMENTS STIPULATED IN THE SBIR

    SBIR Phase II 1984 Department of DefenseAir Force
  5. CARBON THERMOPHYSICAL PROPERTY MEASUREMENTS AT THE TRIPLE POINT

    SBC: Astron Research & Engineering            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  6. IN THIS PROGRAM, THE EFFORT WILL CONCENTRACTE ON ATTAINING A COMPLETE UNDERSTANDING OF THE PHYSICS INVOLVED IN INFERRING THE SHAPE OF THE FORWARD SURFACE OF A CARBON/CARBON NOSETIP FORM THE ECHO WAVESHAPE GENERATED BY A NULTRASONIC TRANSMITTER/RECEIVER

    SBC: Babcock Electro-mechanical            Topic: N/A

    IN THIS PROGRAM, THE EFFORT WILL CONCENTRACTE ON ATTAINING A COMPLETE UNDERSTANDING OF THE PHYSICS INVOLVED IN INFERRING THE SHAPE OF THE FORWARD SURFACE OF A CARBON/CARBON NOSETIP FORM THE ECHO WAVESHAPE GENERATED BY A NULTRASONIC TRANSMITTER/RECEIVER MOUNTED ON THE BACK FACE. THE HIGHEST PRIORITY WILL BE FOCUSSED ON THE ABILITY TO IMPROVE THE INTERPRETATION OF PREVIOUS AND FUTURE FLIGHT DATA USI ...

    SBIR Phase I 1984 Department of DefenseAir Force
  7. INVESTIGATE THE FEASIBILITY OF DESIGNING CIRCUITS TO ENABLE BETTER SECURE TRANSMISSION OF DATA.

    SBC: Computer Sciences Applications            Topic: N/A

    INVESTIGATE THE FEASIBILITY OF DESIGNING CIRCUITS TO ENABLE BETTER SECURE TRANSMISSION OF DATA. DEVELOP SPECIFIC APPROACHES FOR ACHIEVING SUCH DESIGN AND DETERMINE CORRESPONDING CHARACTERISTICS IN TERMS OF ADDITIONAL CIRCUITRY, RELIABILITY OF OPERATION, POSSIBILITY OF DETECTION, POSSIBILITY OF DISABLING OR COUNTERACTING, ACCIDENTAL SWITCHING, AND EASE OF INCORPORATION INTO EXISTING DESIGNS.

    SBIR Phase I 1984 Department of DefenseAir Force
  8. STATE (BUBBLE MEMORY) RECORDER

    SBC: SEAKR ENGINEERING, LLC            Topic: N/A

    TAPE RECORDERS PRESENTLY USED AS SPACEBORNE MASS STORAGE DEVICES HAVE A HISTORY OF BEING UNRELIABLE AND REQUIRE EXTENSIVE AND COSTLY GROUND TESTING TO PROVIDE THE CONFIDENCE NECESSARY TO PASS LAUNCH READINESS. EVEN THEN THEY DO NOT ALWAYS ADEQUATELY PERFORM THEIR FUNCTION ON ORBIT. THE OBJECTIE OF THIS PHASE I PROGRAM IS TO DEVELOP A BUBBLE MEMORY MODULE WHICH CAN BE USED AS A BUILDING BLOCKFOR TH ...

    SBIR Phase II 1984 Department of DefenseAir Force
  9. HIGH-TEMPERATURE METAL-MATRIX STRUCTURE

    SBC: DWA ALUMINUM COMPOSITES            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  10. PROPOSAL TO CONVERT FASTGEN MODELS TO NASTRAN MODELS

    SBC: GCAS, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
US Flag An Official Website of the United States Government