You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Team-based Aircraft Maintainer Support (TAMS)
SBC: 21ST CENTURY SYSTEMS, INC. Topic: AF04060Keeping the Air Force assets flying is difficult enough at depot level where there are extensive facilities and expert help. But in an austere environment, these advantages aren’t present. A recent innovation, the Portable Maintenance Aid (PMA), is a new type of tool to help the human through these situations. PMAs are mobile computing devices that can be used at the point of maintenance and ran ...
SBIR Phase II 2005 Department of DefenseAir Force -
ArmaNet: Integrated Development Environment (ArmaNet IDE)
SBC: 21ST CENTURY SYSTEMS, INC. Topic: AF04163The time and cost it takes to integrate new airborne weapons on platforms is still too great. The current F-15E Strike Eagle weapon integration timeline is 4 years, from requirements to fielding, and costs up to 20 million dollars. What is really needed for rapid aircraft-store integration is a development environment for a “plug-and-play” capability like that of today’s PC-based multi-media ...
SBIR Phase II 2005 Department of DefenseAir Force -
Grid-Group Cm-alpha, Profiling Cultural Factors for Decision Aiding
SBC: 21ST CENTURY SYSTEMS, INC. Topic: AF05069Culturally diverse people are now participating in military multinational coalition applications as well as in extreme environments - once the province of American males drawn from a relatively homogenous cultural pool. Human biases and routines, capabilities and limitations strongly influence overall system performance; whether during operations or in simulations using models of humans. Many mi ...
SBIR Phase I 2005 Department of DefenseAir Force -
Structural Health and Usage monitoring system for Unmanned Air Vehicle (UAV) structures
SBC: ACELLENT TECHNOLOGIES INC Topic: AF03237Acellent Technologies, Inc. proposes to develop a complete Structural Health Monitoring (SHM) system for application to unmanned air vehicle (UAV) platform. In partnership with The Boeing Company, the development will focus primarily on the monitoring of UAV used by the U.S. Air Force such as Sensor Craft and UCAV. The proposed development will provide the means to significantly reduce maintenance ...
SBIR Phase II 2005 Department of DefenseAir Force -
Refractory Coatings on Mechanically Resilient Insulators
SBC: ACREE TECHNOLOGIES INCORPORATED Topic: AF05005The purpose of this proposal is to demonstrate the effectiveness of using ceramic coatings on plastic high-voltage insulators to increase their surface breakdown voltage and improve their recovery after a breakdown event. The goal is to produce a coating that can be applied to high-power microwave tube, coaxial plasma gun and z-pinch insulators that will allow higher voltage operation, reduce flas ...
SBIR Phase I 2005 Department of DefenseAir Force -
Near Surface Flow Control Using Magnetohydrodynamics in High Mach Number Flight
SBC: ACREE TECHNOLOGIES INCORPORATED Topic: AF05T016The purpose of this project is to demonstrate the effectiveness of a Cathodic Arc Plasma Sources (CAPS) and Power Processing Unit (PPU) for producing dense, high current (> 1 amp) plasma flows for magnetohydrodynamic (MHD) control of hypersonic flight surfaces. The CAPS source and PPU were developed for aerospace applications and have been optimized for weight and efficiency. The main advantage of ...
STTR Phase I 2005 Department of DefenseAir Force -
Development of Multi-Hit Nonlinear Progressive Collapse Models for Fixed Targets
SBC: ACTA, LLC Topic: AF05151A Phase I Project is proposed to demonstrate the feasibility of developing Multi-hit Nonlinear Progressive Collapse Models for Fixed Targets. The stated objective is to develop High-Fidelity Physics-Based (HFPB) fast-running models (FRMs) for simulating the nonlinear progressive collapse of aboveground fixed target structures damaged by multiple air-delivered conventional weapons. Phase I will d ...
SBIR Phase I 2005 Department of DefenseAir Force -
Automated Learning Video Analysis (ALVA)
SBC: ACUITY TECHNOLOGIES, INC. Topic: AF05309We propose to develop a system that will automatically track targets based on characteristic velocity differentials between the target and the background. We leverage our existing system for feature detection and tracking and show that it can produce recognizable discrepancies in the kinematics between a moving background and a moving target. We will augment the discriminating power of this kinema ...
SBIR Phase I 2005 Department of DefenseAir Force -
Visible/UV Image Projector for Sensor Testing
SBC: ACUMEN CONSULTING Topic: AF04165Projecting high radiance, broadband scenes in the spectral range from 0.2-14 mm is desired to simulate operating environmental scenarios for testing ultraviolet , visible and infrared sensors in a hardware-in-the-loop environment. The ideal solution will provide high radiance levels over the entire spectral range along with the capability for both broad and narrowband emission, as is appropriate ...
SBIR Phase II 2005 Department of DefenseAir Force -
Actuator Design and Development for Optimized CIC Audio
SBC: Adaptive Technologies, Inc. Topic: AF05057Advancements in subminiature earphone drivers are sought to provide desired improvements in active noise reduction (ANR) earplug attenuation magnitudes and bandwidth. Prior investigations have illustrated a need for improvements in frequency response, sound power output, geometrical configurations, and ease of manufacturing for drivers that are optimized for military ANR earplug applications. Th ...
SBIR Phase I 2005 Department of DefenseAir Force