You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
COMPOSITE MATERIALS WITH LOW Z, SELF-REGENERATING COATINGS FOR FUSION FIRST WALLS AND LIMITERS
SBC: Corpium Industries Inc. Topic: N/ATHE CONDITIONS THAT PLASMA INTERACTIVE MATERIALS MUST FACE IN A MAGNETIC CONFINEMENT FUSION DEVICE ARE SUCH THAT THERE DOES NOT APPEAR TO BE ANY SINGLE MATERIAL THAT POSSESSES ALL THE NECESSARY PROPERTIES TO PREVENT EITHER CONTAMINATION OF THE PLASMA OR EARLY FAILURE OF THE PLASMA-SIDE COMPONENTS. CURRENTLY USED MATERIALS WILL NOT BE SATISFACTORY FOR LONG PULSE OR STEADY-STATE OPERATION. THE USE O ...
SBIR Phase II 1988 Department of Energy -
MISSION RELIABILITY MODEL (MIREM) ENGINEERING WORKSTATION
SBC: Daina Topic: N/ATHE COMPLEXITY OF THE NEXT-GENERATION FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN TASKS WILL REQUIRE INTERACTIVE ACCESS TO THE RELIABILITYPREDICTION TOOLS IN ORDER TO ACHIEVE THE DESIRED RELIABILITY GOALS. THIS PROPOSAL ADDRESSES THE INTEGRATION OF THE AFHRL DEVELOPED MISSION RELIABILITY MODEL (MIREM) AND THE AVAILABLE CIRCUIT DESIGN PROGRAMS IN AN ENGINEERING WORKSTATION ENVIRONMENT. THE PROPOSED EFF ...
SBIR Phase I 1988 Department of DefenseAir Force -
FAIL-SAFE FAULT-TOLERANT ELECTRONICS
SBC: Daina Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseAir Force -
DECREASEING THE COST AND INCREASING THE PERFORMANCE OF COMPUTER BASED TRAINING SIMULATIONS
SBC: Digital Dispatch Inc Topic: N/ACURRENTLY AVAILABLE AUTHORING SYSTEMS HAVE BEEN PROVEN EFFECTIVE IN PRODUCING COMPUTER-BASED TRAINING LESSONS CONTAINING SEQUENCES OF TEXT AND GRAPHICS SCREENS THROUGH WHICH THE STUDENT IS GUIDED UNTIL MASTERY IS ACHIEVED. IN A PERSONNEL TRAINING SIMULATION, FAR MORE ADVANCED CAPABILITIES ARE REQUIRED, INCLUDING MULTITASKING, COMMUNICATION WITH EXTERNAL DEVICES, HIGH SPEED DATA ANALYSIS AND GRAPHI ...
SBIR Phase I 1988 Department of DefenseAir Force -
A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER
SBC: Ei International Inc. Topic: N/AIT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...
SBIR Phase I 1988 Department of Energy -
A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY
SBC: Ei International Inc. Topic: N/AN/A
SBIR Phase I 1988 Department of Energy -
OPTICAL SIGNAL DISTRIBUTION IN LARGE PHASED ARRAY
SBC: Electro Systems International Topic: N/AAN EFFICIENT ARCHITECTURE WILL BE DESIGNED FOR THE PHASING, EXCITATION, CONTROL, AND CALIBRATION OF A LARGE SPACE BASED ARRAY. IT IS PROBABLE THAT SIGNAL DISTRIBUTION WILL BE BY CLOSED OR OPEN OPTICAL PATHS. PHASING MAY BE BY DIRECT DIGITAL AT LOW FREQUENCIES, ACOUSTICAL LENSES AT MIDDLE FREQUENCIES, AND CONVENTIONAL PHASESHIFTERS AT HIGH FREQUENCEIS. RF EXCITATION DISTRIBUTION WILL BE BY CLOSED O ...
SBIR Phase I 1988 Department of DefenseAir Force -
A SPONTANEOUS ELECTROCHEMICAL CLAUS PROCESS FOR SULFUR RECOVERY
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/ATHIS PROJECT IS DIRECTED TOWARD DEVELOPING THE SCIENTIFIC AND TECHNICAL INSIGHT NECESSARY FOR EVALUATING THE UTILITY OF A SOLID OXIDE FUEL CELL COMPATIBLE WITH THE DIRECT ELECTROCHEMICAL OXIDATION OF H(2)S. THIS APPROACH, WHICH FORMS THE BASIS OF AN ELECTROCHEMICAL CLAUS-TYPE PROCESS FORSULFUR REMOVAL, WILL STUDY CELLS POSSESSING THE GENERAL CONFIGURATIONS: H(2)S,AS(2)/ZRO(2)(8(W)%Y(2)O(3))/LA(0.8 ...
SBIR Phase I 1988 Department of Energy -
MICROSTRIP PHASED ARRAY MILLIMETER WAVE RADAR ANTENNA
SBC: Epsilon Lambda Electronics Corp. Topic: N/ATHE OBJECTIVE OF THE PROJECT IS TO DESIGN AND PRODUCE A LOW COST PLANAR ARRAY OPERATING AT 94 GHZ WHICH WOULD USE A COMBINATION OF Z-CUT QUARTZ MICROSTRIP FOR THE RADIATING ELEMENTS AND LOW LOSS INSULAR GUIDE LINES FOR THE FEED NETWORK. THE INITIAL PHASE I WORK WILL CONCENTRATE ON THE ANALYSIS OF THE PROXIMITY COUPLING BETWEEN THE INSULAR GUIDE FEED LINE AND THE MICROSTRIP PATCHES. THE FIRST PHASE ...
SBIR Phase II 1988 Department of DefenseAir Force -
AIRCRAFT V-BAND WIRELESS COMMAND/RESPONSE DATA LINK
SBC: Epsilon Lambda Electronics Corp. Topic: N/AA CONCEPT FOR A WIRELESS V-BAND COMMAND/RESPONSE DATA LINK IS DESCRIBED WHICH WOULD HAVE MAJOR IMPACT ON COMMUNICATIONS IN AIRCRAFT AND SUPPORT ELECTRONIC SUBSYSTEMS (INCLUDING MISSILES AND SUBMUNITIONS). THE WIRELESS LINK CAN BE USED TO REPLACE HARD-WIRED CABLES OR DATA BUS (TO SAVE WEIGHT AND IMPROVE RELIABILITY) AND/OR AS A REDUNDANT BACKUP TO IMPROVE WEAPON AIRCRAFT SURVIVABILITY IN EVENT OF B ...
SBIR Phase I 1988 Department of DefenseAir Force