You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    SBC: Ei International Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  2. A NEW LOW COST, COMPACT CYCLOTRON FOR POSITRON EMISSION TOMOGRAPHY USING A SUPERCONDUCTING MAGNET

    SBC: CTI SERVICES, INC.            Topic: N/A

    THIS PROJECT IS AIMED AT DESIGNING A LIGHT WEIGHT AND COMPACT NEGATIVE ION CYCLOTRON USING A SUPERCONDUCTING MAGNET. THE PROPOSED CYCLOTRON WILL COST 25% LESS THAN EXISTING RESISTIVE MAGNET CYCLOTRONS, WILL OCCUPY 50% LESS SPACE, AND WILL WEIGH APPROXIMATELY 4000 LBS COMPARED WITH 40,000 LBS FOR THE CONVENTIONAL CYCLOTRON. THE NEW CYCLOTRON OPERATING EXPENSE WILL BE SLIGHTLY LESS THAN THE OPERATIN ...

    SBIR Phase II 1988 Department of Energy
  3. AN IN-VESSEL MANIPULATOR CONCEPT DEMONSTRATION FOR THE COMPACT IGNITION TOKAMAK

    SBC: Remotec Inc.            Topic: N/A

    THE SPECIALIZED CONFIGURATION OF THE CTT (COMPACT IGNITION TOKAMAK) PLASMA CHAMBER WITH ITS LIMITED ACCESS SPACE, HIGH RADIATION LEVELS, AND HIGH VACUUM CONDITIONS REQUIRES THE DEVELOPMENT OF SPECIAL PURPOSE REMOTE-HANDLING EQUIPMENT. INITIAL ASSEMBLY OF THE VACUUM VESSEL AND PORT PLUS IN-VESSEL INSPECTION/MAINTENANCE OF FIRST-WALL COMPONENTS, DIVERTOR, DIAGNOSTICS, AND RADIO FREQUENCY LAUNCHER AR ...

    SBIR Phase II 1988 Department of Energy
  4. A NOVEL CONCEPT FOR EFFICIENT PRODUCTION OF LIQUID FUELS FROM COAL USING FLASH PYROLYSIS IN VIBRATED FLUIDIZED BEDS

    SBC: Pai Corp            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  5. A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER

    SBC: Ei International Inc.            Topic: N/A

    IT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...

    SBIR Phase I 1988 Department of Energy
  6. A SEARCH FOR A RAPID OXYGEN SENSOR USING HIGH-TEMPERATURE COMPLEX EUTECTIC THIN FILMS

    SBC: Syncrys Inc            Topic: N/A

    THIS RESEARCH ADDRESSES THE NEED FOR OXYGEN SENSORS TO PROVIDE HIGHLY LOCALIZED, RAPID SENSING (ON THE MICRON SCALE) WHILE OPERATING IN A CORROSIVE ATMOSPHERE AT ELEVATED TEMPERATURE AND/OR PRESSURE. THE MATERIALS USED WILL BE IN THE FORM OF COMPLEX EUTECTIC THIN-FILMS. AN INTENSE LASER BEAM WILL BE USED TO SOLIDIFY DIRECTIONALLY EUTECTIC FILMS OF ZRO(2) WITH MO, ZRC, AND ZRN. TWO OF THESE THREE S ...

    SBIR Phase I 1988 Department of Energy
  7. CONTINUOUS CRYOSORPTION VACCUM PUMPING FOR FUSION APPLICA- TIONS

    SBC: Cryogenic Applications F, Inc.            Topic: N/A

    FUSION ENERGY POWER REACTORS WILL REQUIRE HIGH SPEED VACUUM PUMPS TO EXHAUST REACTION PRODUCTS FROM THE PLASMA. CRYOGENIC PUMPS, WHICH FREEZE GASES ON A LOW TEMPERATURE SURFACE, ARE POTENTIALLY VERY ATTRACTIVE FOR THIS TASK. HOWEVER, THEY MUST BE REMOVED PERIODICALLY FROM SERVICE TO BE REGENERATED (DEFROSTED), OTHERWISE THEY EITHER SATURATE OR ACQUIRE AN UNACCEPTABLY HIGH INVENTORY OF RADIOACTIVE ...

    SBIR Phase I 1988 Department of Energy
  8. DECREASEING THE COST AND INCREASING THE PERFORMANCE OF COMPUTER BASED TRAINING SIMULATIONS

    SBC: Digital Dispatch Inc            Topic: N/A

    CURRENTLY AVAILABLE AUTHORING SYSTEMS HAVE BEEN PROVEN EFFECTIVE IN PRODUCING COMPUTER-BASED TRAINING LESSONS CONTAINING SEQUENCES OF TEXT AND GRAPHICS SCREENS THROUGH WHICH THE STUDENT IS GUIDED UNTIL MASTERY IS ACHIEVED. IN A PERSONNEL TRAINING SIMULATION, FAR MORE ADVANCED CAPABILITIES ARE REQUIRED, INCLUDING MULTITASKING, COMMUNICATION WITH EXTERNAL DEVICES, HIGH SPEED DATA ANALYSIS AND GRAPHI ...

    SBIR Phase I 1988 Department of DefenseAir Force
  9. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    SBC: Daina            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  10. IN-SITU RESPONSE TIME TESTING OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THE DEVELOPMENT OF NOISE ANALYSIS FOR IN-SITU RESPONSE TIME TESTING OF SAFETY SYSTEM PRESSURE SENSORS IN NUCLEAR POWERPLANTS IS UNDER WAY. THE TECHNIQUE IS BASED ON RECORDING THE NATURALLY OCCURRING FLUCTUATIONS THAT EXIST AT THE OUTPUT OF PRESSURE SENSORS AS THE PLANT IS OPERATING. THESE FLUCTUATIONS CAN BE ANALYZED TO GIVE THE SENSOR TRANSFER FUNCTION FROM WHICH THE SENSOR RESPONSE CAN BE DETERM ...

    SBIR Phase I 1988 Department of Energy
US Flag An Official Website of the United States Government