You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A RECUPERATOR FOR CRYOCOOLERS

    SBC: Almatech            Topic: N/A

    THIS PROJECT INVOLVES DEVELOPMENT AND VERIFICATION OF THE PERFORMANCE OF A NOVEL HEAT EXCHANGER OPERATING IN THE 98 TO 99 PERCENT THERMAL EFFECTIVENESS RANGE. HEAT EXCHANGERS FOR CRYOCOOLER APPLICATIONS USED IN HIGH ENERGY PHYSICS, REMOTE SENSING, ETC., FREQUENTLY REQUIRE THERMAL EFFECTIVENESS OF OVER 98%. THIS IS DIFFICULT TO ACCOMPLISH,PRIMARILY BECAUSE OF THE EFFECT OF THE LONGITUDINAL THERMAL ...

    SBIR Phase I 1988 Department of Energy
  2. DESIGN OF A STAR HYPERVELOCITY EML SYSTEM FOR AIR FORCE REQUIREMENTS

    SBC: American Advanced Technologies            Topic: N/A

    THE WORK PROPOSED WILL RESULT IN A COMPLETE, PRELIMINARY SYSTEM DESIGN OF AN ELECTROMAGNETIC PROJECTILE LAUNCHER, BASED ON THE STAR EML CONCEPT DEVELOPED BY AMERICAN ADVANCED TECHNOLOGIES. THE COMPLETED DESIGN WILL PERMIT THE AIR FORCE TO COMPARE THE PERFORMANCE, WEIGHT AND SIZE OF THE STAR EML WITH OTHER CONCEPTS BEING INVESTIGATED. THE STAR EML SYSTEM IS OF INTEREST TO THE AIR FORCE BECAUSE THE ...

    SBIR Phase I 1988 Department of DefenseAir Force
  3. REACTIVE PROTECTION FOR HARDENED FACILITIES

    SBC: BAKER ENGINEERING AND RISK CONSULTANTS, INC.            Topic: N/A

    THREE CONCEPTS ARE PROPOSED FOR REACTIVE PROTECTIVE SYSTEMS FOR ABOVE-GROUND HARDENED STRUCTURES. THESE AND OTHER CONCEPTS WOULD BE EVALUATED FOR THEIR EFFECTIVENESS IN DEFEATING OR SERIOUSLY DEGRADING THE TERMINAL BALLISTIC PERFORMANCE OF A VARIETY OF CONVENTIONAL MUNITIONS WHICH COULD BE USED TO ATTACK AND DIRECTLY IMPACT HARDENED STRUCTURES. APPROXIMATE COST COMPARISONS WOULD BE MADE BETWEEN CO ...

    SBIR Phase I 1988 Department of DefenseAir Force
  4. SURFACTANTS FOR EMULSIFICATION OF INTERMOLECULAR EXPLOSIVES

    SBC: Burnette Research Assocs Inc            Topic: N/A

    BURNETT RESEARCH ASSOCIATES, INC. PROPOSES TO IDENTIFY AND DEVELOP NEW SURFACTANTS CAPABLE OF EMULSIFYING MOLTEN INTERMOLECULAR EXPLOSIVES (IME'S). TO ACCOMPLISH THIS, WE HAVE FORMED A TEAM OF EXPERTS SKILLED IN THE ART AND SCIENCE OF COLLOIDS AND SURFACE CHEMISTRY. MEMBERS OF THIS TEAM ARE RECOGNIZED EXPERTS IN THE PETROLEUM INDUSTRY. CONTROLLING SOLID/LIQUID DISPERSIONS AND LIQUID/LIQUID EMULSIO ...

    SBIR Phase I 1988 Department of DefenseAir Force
  5. A NOVEL, INSULATED, DOUBLE-WALLED TUBE DESIGN FOR THERMALLY-ENHANCED OIL RECOVERY

    SBC: Carbotek Inc            Topic: N/A

    A NOVEL, DOUBLE-WALLED, VACUUM-INSULATED TUBE IS PLANNED FOREFFICIENT TRANSMISSION OF HOT WATER OR STEAM FOR ENHANCED THERMAL RECOVERY OF HEAVY OIL FROM DEEP OIL RESERVOIRS. THIS DESIGN IMPROVES THE STRUCTURAL RELIABILITY WHILE P PROVIDING IMPROVED THERMAL INSULATION HAVING A LOW MANUFACTURING COST. PHASE I OF THIS PROGRAM INVOLVES THE DETAILED ANALYSIS, DESIGN, AND OPTIMIZATION OF THE TUBING. A P ...

    SBIR Phase II 1988 Department of Energy
  6. COMMON DATA SEMANTICS MODELING PROCESSOR AND RESOLVER TOOL

    SBC: Case Consulting Inc            Topic: N/A

    THIS DOCUMENT PROPOSES TO ENRICH THE SEMANTICS OF THE IDEF MODELING TECHNIQUES WHILE REDUCING THE COMPLEXITIES INHERENT WITH CURRENT MODELING PROCEDURES. THE IDEF TECHNIQUES WOULD BE MADE MORE ROBUST WITH ADDITIONAL RIGOR AND LEVELS OF ABSTRACTION. GENERIC MANUFACTURING AND ENGINEERING MODELS (TEMPLATES) WOULD BE CONSTRUCTED TO SUPPORT NEEDED DEMONSTRATIONS. THIS PROPOSAL, IF ACCEPTED, WOULD ALSO ...

    SBIR Phase I 1988 Department of DefenseAir Force
  7. DESIGN PRODUCIBILITY ASSESSMENT SYSTEM

    SBC: Cim Systems, Inc.            Topic: N/A

    CURRENT DESIGN PRODUCIBILITY ENGINEERING RELIES ON THE USE OF CHECKLISTS AND THE EXPERIENCE OF THE DESIGNER AND THE MANUFACTURING ENGINEER TO INTEGRATE MANUFACTURING REQUIREMENTS INTO THE OVERALL DESIGN OF AN ITEM. APART FROM THE USE OF VERY GENERALIZED CHECKLISTS, THERE EXISTS NO ESTABLISHED SET OF CRITERIA OR DESIGN STANDARDS ACROSS THE DEFENSE INDUSTRY WHICH THE DESIGNER CAN FOLLOW TO ENSURE TH ...

    SBIR Phase I 1988 Department of DefenseAir Force
  8. DESIGN FOR PRODUCIBILITY TOOLS FOR ELECTRONIC SYSTEMS

    SBC: Cim Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  9. MISSION RELIABILITY MODEL (MIREM) ENGINEERING WORKSTATION

    SBC: Daina            Topic: N/A

    THE COMPLEXITY OF THE NEXT-GENERATION FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN TASKS WILL REQUIRE INTERACTIVE ACCESS TO THE RELIABILITYPREDICTION TOOLS IN ORDER TO ACHIEVE THE DESIRED RELIABILITY GOALS. THIS PROPOSAL ADDRESSES THE INTEGRATION OF THE AFHRL DEVELOPED MISSION RELIABILITY MODEL (MIREM) AND THE AVAILABLE CIRCUIT DESIGN PROGRAMS IN AN ENGINEERING WORKSTATION ENVIRONMENT. THE PROPOSED EFF ...

    SBIR Phase I 1988 Department of DefenseAir Force
  10. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    SBC: Daina            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
US Flag An Official Website of the United States Government