You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LEARNING SYSTEMS FOR ELECTRONIC COMBAT APPLICATIONS (LSECA)

    SBC: ABTECH CORPORATION            Topic: N/A

    ADVANCES IN ELECTRONIC COMBAT APPLICATIONS WILL SIGNIFICANTLY INCREASE THE ABILITY OF PILOTS TO OUTPERFORM A LARGE NUMBER OF ADVERSARIES IN ENVIRONMENTS WHERE THERE IS AN EXTREME INFORMATION PROCESSING BURDEN. THE NUMBER OF FACTORS PILOTS MUST CONSIDER IN MAKING ELECTRONIC COMBAT RELATED DECISIONS IS VERY HIGH AND OFTEN INVOLVE UNKNOWN RELATIONSHIPS THAT MUST BE LEARNED FROM EXPERIENCE. IN ADDITIO ...

    SBIR Phase I 1988 Department of DefenseAir Force
  2. IN-SITU RESPONSE TIME TESTING OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THE DEVELOPMENT OF NOISE ANALYSIS FOR IN-SITU RESPONSE TIME TESTING OF SAFETY SYSTEM PRESSURE SENSORS IN NUCLEAR POWERPLANTS IS UNDER WAY. THE TECHNIQUE IS BASED ON RECORDING THE NATURALLY OCCURRING FLUCTUATIONS THAT EXIST AT THE OUTPUT OF PRESSURE SENSORS AS THE PLANT IS OPERATING. THESE FLUCTUATIONS CAN BE ANALYZED TO GIVE THE SENSOR TRANSFER FUNCTION FROM WHICH THE SENSOR RESPONSE CAN BE DETERM ...

    SBIR Phase I 1988 Department of Energy
  3. BROADBAND HF/VHF ANTENNA SYSTEM

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    TO ACHIEVE THE PROGRAM GOALS OF ULTIMATELY FABRICATING AND DEMONSTRATING MINIATURIZED BROADBAND, HR/VHF ANTENNAS FOR USE ON AIR FORCE VEHICLES, THE TWO CRITICAL TECHNICAL ASPECTS OF THE PROBLEM, FORESHORTENING AND BROADBANDING, HAVE BEEN STUDIED, PROTOTYPE CONCEPTS DEVELOPED, AND ENGINEERIN FEASIBILITY ASSESSED IN AN EXTENSIVE PHASE I PROGRAM UNDERTAKEN BY ASTRON. REALIZATION OF THESE CONCEPTSREQU ...

    SBIR Phase II 1988 Department of DefenseAir Force
  4. COMMUNICATIONS THROUGH INTERVENING MEDIA

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    THE ASTRON PROPOSED UNDERGROUND COMMUNICATIONS SYSTEM UTILIZES AN INNOVATIVEPHASE MODULATED RF TRANSMISSION WHOSE MODULATION RATE IS ADJUSTED TO PROVIDE DECREASED TRANSMISSION LOSSES THROUGH SOIL/ROCK ENVIRONMENT AS COMPARED TO CONVENTIONAL RF COMMUNICATION SYSTEMS. ADDITIONAL MAJOR ADVANTAGES ARE: A. DECREASE TRANSMISSION LOSSES THROUGH OTHER MEDIA (IF DESIRED); B. INCREASED DATA RATE ABOVE THE U ...

    SBIR Phase I 1988 Department of DefenseAir Force
  5. AIRCRAFT ANTENNA SYSTEM--ADVANCED TECHNOLOGY- LIFE CYCLE COST CONSIDERATIONS

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  6. CONFORMAL AIRCRAFT HF TRANSMITTING ANTENNA

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  7. ABDUCTIVE AND INDUCTIVE REASONING IN MAINTENANCE DIAGNOSTIC SYSTEMS

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    THE PROPOSED RESEARCH IS FOR DEVELOPMENT OF ABDUCTIVE AND INDUCTIVE REASONING ALGORITHMS THAT WILL AID IN THE DEVELOPMENT OF FLIGHT CONTROL SYSTEM (FCS) MAINTENANCE DIAGNOSTIC SYSTEMS AND THAT WILL OVERCOME MANY OF THE LIMITATIONS OF EXISTING DIAGNOSTIC TECHNOLOGY. A FOCUS OF THE EFFORT WILL BE THE DEVELOPMENT OF A CAPABILITY TO REASON ABOUT FSC FAULTS AT A SYSTEM LEVEL WITH UNCERTAIN INFORMATION. ...

    SBIR Phase II 1988 Department of DefenseAir Force
  8. A NEW LOW COST, COMPACT CYCLOTRON FOR POSITRON EMISSION TOMOGRAPHY USING A SUPERCONDUCTING MAGNET

    SBC: CTI SERVICES, INC.            Topic: N/A

    THIS PROJECT IS AIMED AT DESIGNING A LIGHT WEIGHT AND COMPACT NEGATIVE ION CYCLOTRON USING A SUPERCONDUCTING MAGNET. THE PROPOSED CYCLOTRON WILL COST 25% LESS THAN EXISTING RESISTIVE MAGNET CYCLOTRONS, WILL OCCUPY 50% LESS SPACE, AND WILL WEIGH APPROXIMATELY 4000 LBS COMPARED WITH 40,000 LBS FOR THE CONVENTIONAL CYCLOTRON. THE NEW CYCLOTRON OPERATING EXPENSE WILL BE SLIGHTLY LESS THAN THE OPERATIN ...

    SBIR Phase II 1988 Department of Energy
  9. CONTINUOUS CRYOSORPTION VACCUM PUMPING FOR FUSION APPLICA- TIONS

    SBC: Cryogenic Applications F, Inc.            Topic: N/A

    FUSION ENERGY POWER REACTORS WILL REQUIRE HIGH SPEED VACUUM PUMPS TO EXHAUST REACTION PRODUCTS FROM THE PLASMA. CRYOGENIC PUMPS, WHICH FREEZE GASES ON A LOW TEMPERATURE SURFACE, ARE POTENTIALLY VERY ATTRACTIVE FOR THIS TASK. HOWEVER, THEY MUST BE REMOVED PERIODICALLY FROM SERVICE TO BE REGENERATED (DEFROSTED), OTHERWISE THEY EITHER SATURATE OR ACQUIRE AN UNACCEPTABLY HIGH INVENTORY OF RADIOACTIVE ...

    SBIR Phase I 1988 Department of Energy
  10. A SYNTHETIC BEAM SONAR SYSTEM FOR MOBILE ROBOTS AND TELEOPERATORS

    SBC: Cybermation Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
US Flag An Official Website of the United States Government