You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MISSION RELIABILITY MODEL (MIREM) ENGINEERING WORKSTATION

    SBC: Daina            Topic: N/A

    THE COMPLEXITY OF THE NEXT-GENERATION FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN TASKS WILL REQUIRE INTERACTIVE ACCESS TO THE RELIABILITYPREDICTION TOOLS IN ORDER TO ACHIEVE THE DESIRED RELIABILITY GOALS. THIS PROPOSAL ADDRESSES THE INTEGRATION OF THE AFHRL DEVELOPED MISSION RELIABILITY MODEL (MIREM) AND THE AVAILABLE CIRCUIT DESIGN PROGRAMS IN AN ENGINEERING WORKSTATION ENVIRONMENT. THE PROPOSED EFF ...

    SBIR Phase I 1988 Department of DefenseAir Force
  2. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    SBC: Daina            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  3. DECREASEING THE COST AND INCREASING THE PERFORMANCE OF COMPUTER BASED TRAINING SIMULATIONS

    SBC: Digital Dispatch Inc            Topic: N/A

    CURRENTLY AVAILABLE AUTHORING SYSTEMS HAVE BEEN PROVEN EFFECTIVE IN PRODUCING COMPUTER-BASED TRAINING LESSONS CONTAINING SEQUENCES OF TEXT AND GRAPHICS SCREENS THROUGH WHICH THE STUDENT IS GUIDED UNTIL MASTERY IS ACHIEVED. IN A PERSONNEL TRAINING SIMULATION, FAR MORE ADVANCED CAPABILITIES ARE REQUIRED, INCLUDING MULTITASKING, COMMUNICATION WITH EXTERNAL DEVICES, HIGH SPEED DATA ANALYSIS AND GRAPHI ...

    SBIR Phase I 1988 Department of DefenseAir Force
  4. A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER

    SBC: Ei International Inc.            Topic: N/A

    IT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...

    SBIR Phase I 1988 Department of Energy
  5. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    SBC: Ei International Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  6. REACTIVE PROTECTION FOR HARDENED FACILITIES

    SBC: Seb Engineering Inc (fscm63834            Topic: N/A

    THE PURPOSE OF THE PROPOSED RESEARCH IS TO EXPLORE THE WORTHINESS OF EMPLOYING REACTIVE PROTECTION FOR STRUCTURES SUBJECTED TO THE EFFECTS OF MODERN CONVENTIONAL WEAPONS. THE REACTIVE PROTECTION CONSISTS OF HIGH EXPLOSIVE (HE) CHARGES EMBEDDED IN PROTECTIVE LAYERS. THE SYSTEM IS INTENDED FOR DISTRUBING THE PENETRATION CAPABILITIES OF MODERN CONVENTIONAL WEAPONS, CONTROLLING THE MAGNITUDE OF LOADS ...

    SBIR Phase I 1988 Department of DefenseAir Force
  7. TRANSMISSION HOLOGRAPHIC RELAY LENS FOR AIRCRAFT HEAD UP DISPLAY

    SBC: Apa Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  8. DEEP-BASING EGRESS

    SBC: Itasca Consulting Group, Inc.            Topic: N/A

    THE DEEP-BASING CONCEPT REQUIRES THE CAPABILITY FOR FAST EGRESS FROM THE UNDERGROUND FACILITY. THIS EGRESS REQUIRES THE USE OF INCLINED RAISE BORERS, THE UTILITY OF WHICH DEPENDS, TO AN EXTENT, ON THE FLOW OF MUCK IN THE INCLINED RAISE. THREE METHODS FOR DETERMINING THE FLOW PROPERTIES OF MUCK ARE THE EMPIRICAL, THE ANALYTICAL, AND THE NUMERICAL. THE WORK PROPOSED HERE OFFERS A COMBINED EMPIRICALN ...

    SBIR Phase I 1986 Department of DefenseAir Force
  9. POWER-AUGMENTED EXOSKELETON DEMONSTRATION UNIT

    SBC: Prt Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  10. THE DEVELOPMENT OF HIGH ELECTRICAL GRADIENT, DC ACCELERATOR TUBES WITH ELECTRICAL BREAK- DOWN PROTECTION

    SBC: Sysmed Inc.            Topic: N/A

    THIS PROJECT IS TO PRODUCE A SHORT SECTION OF A DC PAR- TICLE ACCELERATOR TUBE INCORPORATING SEVERAL IMPROVEMENTS. THE ELECTRODES WILL HAVE A CONTINUOUS CURVATURE OF LARGE RADIUS, SO AS TO PROVIDE ELECTROSTATIC SHIELDING FOR THE SEPARATING INSULATOR WITHOUT PRODUCING THE LARGE, LOCAL ELECTRIC FIELD ENHANCEMENTS TYPICAL OF DISHED ELECTRODES. THE ACCELERATING APERTURE OF THESE ELECTRODES WILL BE CHO ...

    SBIR Phase II 1986 Department of Energy
US Flag An Official Website of the United States Government