You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Pre-Award Systems Acquisition Processing System (PASAPS)
SBC: Frontline Solutions Inc Topic: N/AThis Small Business Innovations Research Phase I project will develop and demonstrate the feasibility of an electronic architecture that supports the processes associated with an RFP life cycle. An RFP life cycle begins with the development of an RFP, progresses through an analysis of resultant proposals, and continues beyond the contract award. The resulting new architecture, called ...
SBIR Phase II 1997 Department of DefenseAir Force -
High Density Shock Survivable Microelectronics
SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC. Topic: N/AA packaging system and process for minimizing the volume of shock hardened components will be designed and developed. Different multi-chip module (MCM) approaches will be investigated including laminate (MCM-L), ceramic (MCM-C), deposited thin film (MCM-D), and hybrids of the two (MCM-C/D). In addition, micro ball grid arrays on folded elastomeric substrates, 3-D High Density Interconnect (HDI) ...
SBIR Phase II 1997 Department of DefenseAir Force -
Secure Data Sharing
SBC: SECURE COMPUTING CORP. Topic: N/AThis proposal investigates the feasibility of a secure transaction manager (STM) for defining and implementing policies that govern when and how DBMS transactions can be executed. Database management systems and transaction processing systems use the concept of a transaction to organize and control the manner in which application programs can access network resources, including databa ...
SBIR Phase II 1997 Department of DefenseAir Force -
Low Cost, Dual Use Envirnmental Measurement Device (END)- Phase I
SBC: Event Tracking Service Topic: N/AEvent Tracking Service (ETS) proposes to study the feasibility of developing a low cost ($50), self-contained, dual use, miniature, credit card size Environmental Measurement Device (EMD) to sense and log shock, vibration, temperature, and humidity. The device would be readily expandable to monitor other parameters. Our low power architecture includes 3V off-the-shelf CMOS electronics, a low power ...
SBIR Phase II 1995 Department of DefenseAir Force -
Human Systems/Subsystems Research: Application of the Critical Incident Technique to Enhance CRM Training
SBC: Personnel Decisions Research Topic: N/AThe goal of the proposed research is to demonstrate the usefulness of the critical incident technique for enhancing the effectiveness of the Air Force's CRM training programs. This will be achieved by collecting a large number of critical incidents from Air Force aircrews reflecting effective, ineffective, and average levels of individual CRM performance. In addition, because it is the performance ...
SBIR Phase II 1995 Department of DefenseAir Force -
GaAs BASED ACCELEROMETERS FOR INTEGRATED GUIDANCE AND NAVIGATION SUBSYSTEMS
SBC: Top-Vu Technology, Inc. Topic: N/ATop-Vu's unique approach is to integrate micro-inertial elements and electronics on a gallium arsenide (GaAs) substrate. The advantages are high precision guidance and navigation, virtually no uncorrelated output errors, high reliability in accelerated environment, excellent electrical isolation with mechanical switch, extremely wide operating temperature range (both high and low), excellent radia ...
SBIR Phase II 1995 Department of DefenseAir Force