You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CPS: Creative Problem Solver

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: N16AT002

    Military systems operate in complex, adversarial environments where their initial planned operations are often overcome by events, but soldiers use those systems in creative ways to achieve their mission objectives. For example, complex ground robotic systems that were initially deployed for surveillance and explosive ordinance disposal have instead been used as decoys, ammunition carriers, and ot ...

    STTR Phase II 2018 Department of DefenseDefense Advanced Research Projects Agency
  2. Wafer-Level Electronic-Photonic Co-Packaging

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF16AT01

    In phase II work, we will collaborate with Prof. Stefan Preble in RIT and continue to develop large scale hybrid integration and packaging techniques for key active photonic components such as lithium niobate on insulator (LNOI) modulators and modified uni-traveling (MUTC) photodiodes. We will demonstrate a low V, broadband, small footprint LNOI modulator with hybrid Si/LN or SiN/LN waveguide usin ...

    STTR Phase II 2018 Department of DefenseAir Force
  3. Instant k-Space Tomography for Spatial-Spectral Monitoring

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF17AT013

    The Army is frequently forced to operate in hostile climates. Heavy fog, rain, snow, and dust storms can inhibit the performance of tracking technologies such as mid-wave infrared cameras. In such conditions, Army early warning systems are blinded and put personnel and assets at risk.There is a specific need for a degraded visual environment (DVE) penetrative target tracking solution.Radio frequen ...

    STTR Phase II 2018 Department of DefenseAir Force
  4. AFFF Disposal

    SBC: Liquid Carbonic L.L.C.            Topic: AF17BT001

    The Air Force and other government and private entities must safely dispose of Aqueous Film-Forming Foam Waste (AFFF).The waste is problematic due to a high fluorine content.The thermal decomposition of AFFF by supercritical water oxidation (SCWO) was accomplished in a continuous flow reactor during Phase I demonstrating >99% AFFF conversion efficiency.Phase II will build on the bench-scale work b ...

    STTR Phase II 2018 Department of DefenseAir Force
  5. NEUTRON: Network Enforcement Using TRansctiONs

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: AF17BT004

    SIFT proposes Network Enforcement Using TRansactONs (NEUTRON) a dynamic fine-grained network enforcement policy design that captures network dependencies. NEUTRON closes the knowledge gap between mission needs and observed network traffic to increase mission network awareness. Then using that knowledge develops a revolutionary security enforcement policy based on network transactions. It reduces t ...

    STTR Phase II 2019 Department of DefenseAir Force
  6. Next Generation Infrared Scene Projector for Testing MWIR Systems

    SBC: Chip Design Systems Inc.            Topic: AF18AT017

    Based on the results of Phase I, we aim to develop a prototype of the high speed dynamic IRSP instrument. This prototype will incorporate the next generation 1Kx1K IRLED array that is compatible with the highly successful and user-tested NSLEDS IRSP. If Phase II of the proposed project is successful, the result will be an upgrade of NSLEDS IRSP system to higher performance and operability. The rea ...

    STTR Phase II 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government