You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3265 results
  1. LOGICAL CLEANSING

    SBC: Electronic Design & Research            Topic: N/A

    A NEW TYPE NOISE REDUCTION TECHNIQUE (1) HAS OPENED THE OPPORTUNITY TO DETECT BOTH A SIGNAL WITH NEGATIVE SIGNAL TO NOISE RATIO AND RANDOM SIGNAL ON A LINE. THE IMPORTANT ADVANTAGE OF THIS TECHNIQUE OVER EXTERNAL ENVIRONMENT NOISE AS WELL AS AN INTERNAL BACKROUND NOISE. IT PROVIDES A REAL TIME DETECTION AT A WIDE FREQUENCY RANGE, THIS VERY EFFICENT AND INEXPENSIVE APPROACH TO IMPROVE THE SNR BY TH ...

    SBIR Phase I 1983 Department of DefenseArmy
  2. GROWTH OF GAAS USING ION CLUSTER BEAM TECHNOLOGY

    SBC: ETONNET, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  3. REDUCE THE VEE-LOCK JOINT TO ITS MOST COST EFFECTIVE MANUFACTURING METHODS

    SBC: Interlock Design And            Topic: N/A

    THE VALUE OF LIGHTWEIGHT\HIGH STRENGTH TRAIGLAR TRUSS STRUCTURAL MEMBERS ARE RECOGNIZED FOR THERE STRENGTH AND DESIGN EFFICIENCY.MULTIPLE SECTIONS MAY BE JOINED TOGETHER WITHOUT THE USE OF TOOLS USING A VEELOCK JOINT ATTACHED TO THE ENDS OF THE TRUSS. THE VEELOCK JOINT WILL CONNECT TO ITSELF INSTANTLY PROVIDING A LONG SPAN OF TRUSS. QUICK- CONNECT\DISCONNECT VEELOCK TRUSS STRUCTURES WOULD HAVE BRO ...

    SBIR Phase I 1983 Department of DefenseArmy
  4. CRASHWORTHNESS REQUIRE A CUSHION OF MINIMUM THICKNESS TO MINIMIZE DYNAMIC OVER-SHOOT OCCURRING DURING

    SBC: Simula, Inc.            Topic: N/A

    LOAD-ATTENUATING SEAT CUSHIONS DESIGNED FOR CRASHWORTHY SEATING SYSTEMS MUST SERVE A DUAL PURPOSE. SUFFICIENT CUSHIONING MUST BE USED TO EVENLY DISTRIBUTE CONTRACT LOADS TO AVOID CONTARACT LOADS TO AVOID PRESSURE POINTS THAT CAN CAUSE DISCOMFORT,BUT THE DEMANDS OF CRASH LOADING. ALSO, THE RIGORS OF FIELD USE CAN SERIOUSLY DEGRADE MATERIALS COMMONLY IN USE. THEREFORE, THE DESIGN OF CRASHWORTHY CUSH ...

    SBIR Phase I 1983 Department of DefenseArmy
  5. TWO DIFFERENT DETECTORS, BOTH USING THIN, CRACKED-ETHYLENE FOILS, WILL BE MADE.

    SBC: Arizona Carbon Foil Co Inc            Topic: N/A

    TWO DIFFERENT DETECTORS, BOTH USING THIN, CRACKED-ETHYLENE FOILS, WILL BE MADE. ONE DETECTOR CONSISTS OF A LOW-PRESSURE GAS CELL, SEALED AT EITHER END WITH ALUMINIZED ETHYLENE FOILS ABOUT 10 MICROGRAMS PER SQUARE CENTIMETER THICK. LIGHT GENERATED WHEN THE PROTON BEAM TRAVERSES THE GAS WILL BE VIEWED THROUGH A SIDE WINDOW; THE INTENSITY OF THE LIGHT, AS MEASURED WITH A PHOTOMULTIPLIER OR PHOTODIODE ...

    SBIR Phase I 1984 Department of DefenseAir Force
  6. DEVELOPMENT OF A SENSITIVE, RAPID CHEMICAL/BIOLOGICAL AGENT DETECTOR

    SBC: SURMODICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  7. PHASE I WOULD INVOLVE STUDY TO DETERMINE THE PARAMETERS OF THE REQUIRED SYSTEM AND TO ASCERTAIN THE FEASIBILITY AND BEST APPROACHES.

    SBC: Electronic Design & Research            Topic: N/A

    PHASE I WOULD INVOLVE STUDY TO DETERMINE THE PARAMETERS OF THE REQUIRED SYSTEM AND TO ASCERTAIN THE FEASIBILITY AND BEST APPROACHES. VISUAL STIMULI REQUIREMENTS OF PRESENT AND FUTURE VISUAL RESEARCH CONDUCTED BY THIS ARMY LABORATORY WOULD BE ASCERTAINED. THE CAPA BILITIES OF THE EXISTING HARDWARE WILL THEN BE EVALUATED. FINALLY, THE DESIRED TYPES OF USER INTERACTIONS WITH THE SYSTEM WILL BE EXPLOR ...

    SBIR Phase I 1984 Department of DefenseArmy
  8. GROWTH OF GAAS USING ION CLUSTER BEAM TECHNOLOGY

    SBC: ETONNET, INC.            Topic: N/A

    THIS PROGRAM WOULD INVESTIGATE THE GROWTH OF

    SBIR Phase II 1984 Department of DefenseAir Force
  9. MIL-STD-1553B DATA BUS

    SBC: Interlaken Technology Corporation            Topic: N/A

    THE INCREASINGLY WIDESPREAD APPLICATION OF MIL-STD-1553B TO MILITARY AND, POTNTIALLY COMMERCIAL AIRCRAFT HAS CREATED A NEED FOR DIGITAL OUTPUT FLOW ANGLE TRANSMITTERS. THE CURRENT MEANS OF GENERATING A DIGITAL OUTPUT FROM EXISITING TRANSDUCERS HAS AN UNFLAVORABLE IMPACT ON SIZE, WEIGHT, POWER, COST AND RELIABILITY. DIGITIAL ENCODING TECHNIQUES ARE BELIEVED TO HAVE BENEFICIAL APPLICATION TO EXISTIN ...

    SBIR Phase I 1984 Department of DefenseAir Force
  10. THE POSIDENT CONCEPT USES FINGER PRINT IDENTIFICATION SYSTEM TO COMPARE THE SUBJECTS LIVE FINGER PRINT WITH A STORED FINGER PRINT.

    SBC: Knightronix, Inc.            Topic: N/A

    THE POSIDENT CONCEPT USES FINGER PRINT IDENTIFICATION SYSTEM TO COMPARE THE SUBJECTS LIVE FINGER PRINT WITH A STORED FINGER PRINT. THE STORAGE MEDIUM CAN BE ONE OF SEVERAL TYPES. A PHOTOGRAPHIC IMAGEIIS ONE METHOD OF STORAGE. DIGITAL DATA IN PROM IS A SECOND METHOD. THE ID CARD IS PLACED FON THE ELECTRO-OPTICAL CORRELATION DEVICE. A VIDEO CAMERA (VIDICON OR SOLID STATE CCD CAMERA) IS USED TO SCAN ...

    SBIR Phase I 1984 Department of DefenseAir Force
US Flag An Official Website of the United States Government