You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MADEIRA: Multi-Agent Debloating Environment to Increase Robustness in Applications

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: N23AT009

    SIFT and the University of Southern California's Information Sciences Institute (USC/ISI) propose to develop the Multi-Agent Debloating Environment to Increase Robustness in Applications (MADEIRA). MADEIRA will apply AI/ML techniques to learn how to apply diverse debloating tools, automatically reducing the attack surfaces of full systems that may include firmware, OS, container, and application-l ...

    STTR Phase I 2023 Department of DefenseNavy
  2. AI/ML Leveraged Automated Weather Monitoring in Support of 90th Missile Security Forces Squadron Operations

    SBC: CURLEY ENTERPRISES LLC            Topic: AFX23DTCSO1

      Curley Enterprises’ FrostyFlake solution is an AI-powered, geographically dispersed weather monitoring algorithm that utilizes available camera networks and publicly available data streams from weather monitoring stations, satellites, radar, and forecas

    STTR Phase I 2023 Department of DefenseAir Force
  3. PROACTV- Projective Plan Recognition with Orbital Analysis of Conjunctive Threats and Vulnerabilities

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: SF22DT001

    Maintaining awareness of the space environment is a critical task for national security, one that currently relies primarily on radar and photometric data to track the thousands of active satellites and debris in Earth orbit. Despite the volumes of data a

    STTR Phase I 2023 Department of DefenseAir Force
  4. HIDEHO: HIerarchical DistributEd Heterogenous Optimization

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: AF21BT001

    Large-scale military and civilian planning problems are (1) distributed – decision-making is spread across multiple organizations, including organizations that must employ information that they are unable or unwilling to share; (2) heterogeneous – the domains of optimization and local criteria for optimality differ – and (3) hierarchical – higher levels of authority solve abstract versions ...

    STTR Phase II 2023 Department of DefenseAir Force
  5. Optical Fence for Tactical LEO Surveillance

    SBC: First Light Observatory Systems LLC            Topic: AF21STCSO1

    A proposal to develop an architectural concept for a low-cost, near real-time, passive optical fence for low Earth orbit (LEO) surveillance incorporating an innovative, computationally efficient, multi-hypothesis, search algorithm for detecting dim moving objects. This new search algorithm significantly reduces computing complexity, and thus associated hardware costs. Optical arrays could be imple ...

    STTR Phase I 2022 Department of DefenseAir Force
  6. Ruggedized, modular power generation system to enhance continuous and sustainable energy for Air Force operations in tactical and austere environments

    SBC: INERGY HOLDINGS, LLC            Topic: AF21BTCSO1

    Defense Need: The U.S. Air Force 2030 Science and Technology Strategy’s vision is “An Air Force that dominates time, space, and complexity in future conflict across all operating domains to project power and defend the homeland.” The document specifically calls for advanced technology solutions along the following five strategic capabilities: 1. Global Persistent Awareness, 2. Resilient Info ...

    STTR Phase II 2022 Department of DefenseAir Force
  7. Reducing Air Force rate of non-contact injury and rehabilitation time post injury through implementation of the NeuroPak Training System

    SBC: 1109 Bravo L.L.C.            Topic: AF21BTCSO1

    According to the Air Force Research Laboratory (AFRL), Human Performance is the greatest asset and continues to be for the people who serve our country. Through biological and cognitive research, we ensure the warfighter’s training and readiness. Every technology we develop is designed with human capabilities in mind. Musculoskeletal injuries cost the DoD over one billion dollars annually and ar ...

    STTR Phase II 2022 Department of DefenseAir Force
  8. OPTIMIZING Job Related Training and Performance, Decreasing the Risks of Musculoskeletal Injury, and Management of Chronic Pain through implementation of the NeuroPak Training System

    SBC: 1109 Bravo L.L.C.            Topic: AF21BTCSO1

    According to the Air Force Research Laboratory (AFRL), Human Performance is the greatest asset and continues to be for the people who serve our country. Through biological and cognitive research, we ensure the warfighter’s training and readiness. Every technology we develop is designed with human capabilities in mind. Musculoskeletal injuries cost the DoD over one billion dollars annually and ar ...

    STTR Phase II 2022 Department of DefenseAir Force
  9. Cognitive Behavioral Therapy for Combat Related PTSD

    SBC: NIGHTWARE, INC            Topic: AF21BTCSO1

    Approximately 4% of the population, and 7% of combat veterans have nightmare disorder. Chronic nightmares are found in approximately 18% of patients with insomnia, 15% with anxiety and depression, and 50-80% of patients with PTSD. Annually, eight (8) Million Americans and 20% of Airmen and Soldiers serving in wartime operations and US conflicts are diagnosed with Post Traumatic Stress Disorder (PT ...

    STTR Phase II 2022 Department of DefenseAir Force
  10. Secure Document Generation

    SBC: Inkit Inc.            Topic: AF21BTCSO1

    The issues in the Afghan evacuation highlight the Air Force is lacking in its capability to collect, compile, and disseminate data reports in a timely manner. The Air Force can only move as fast as its ability to disseminate information and make informed

    STTR Phase II 2022 Department of DefenseAir Force
US Flag An Official Website of the United States Government