You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Accelerated Learning for Cyber Insider Threat Reduction (XL-CITR)

    SBC: TIER 1 PERFORMANCE SOLUTIONS LLC            Topic: OSD08CR8

    Future U.S. Information Systems will be subject to increased attacks. These attacks will come from both internal and external threats. As reflected by the budgets for combating these threats, external cyber threats are assumed to be more likely. By comparison, internal threats to cyber networks from U.S. personnel receive little attention; yet, the consequences can be even more devastating. Al ...

    SBIR Phase II 2010 Department of DefenseAir Force
  2. Accelerated Learning through Serious Game Technology

    SBC: TIER 1 PERFORMANCE SOLUTIONS LLC            Topic: OSD08CR8

    Military network environments will be subject to both internal and external threats for the foreseeable future. Internal threats to cyber networks from U.S. personnel receive little attention in comparison to external threats; yet, the consequences can be even more devastating. The lack of tools for understanding insider threat, analyzing risk mitigation alternatives, and communicating results e ...

    SBIR Phase I 2009 Department of DefenseAir Force
  3. Accelerated Reconnaissance Window Development

    SBC: Third Wave Systems, Inc.            Topic: AF093129

    Grinding is used to satisfy figure and finish requirements for optics, removing successive layers of material to ensure alleviation of any damage created from the prior operation. Consequently, fabrication times are slow and expensive. The optics manufacturing industry currently lacks physics-based models needed to understand the impact of process and material variables on final part quality and ...

    SBIR Phase I 2010 Department of DefenseAir Force
  4. Accelerating mission readiness with hybrid reinforcement of SiC-C heat shields for hypersonics and atmospheric reentry

    SBC: ENDEAVOR COMPOSITES, INC.            Topic: AFX235CSO1

    The U.S. is behind in developing an operational hypersonic capability. With Endeavor Composites, the U.S. will have a cost and weight edge by using materials that can be made 5x faster and at half the cost. ​​​​​​​ Endeavor Composites, Inc, has adapted co

    SBIR Phase I 2023 Department of DefenseAir Force
  5. Acclimate- Active Thermoregulation for Military Personnel

    SBC: THE SCIENCE AND ENGINEERING CORPS, LLC            Topic: X224ODCSO1

    This Direct-to-Phase II proposal encompasses the refinement, demonstration, and commercialization of the TRL 7 Acclimate technology suite in relevant environments through final requirements identification, engineering refinement, integrated testing and ev

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Accurate Persistent Perimeter Surveillance (APPS)

    SBC: PHELPS2020, INC            Topic: J201CSO1

    Phelps2020 will customize a real-time solution (APPS) that performs accurate EO/IR persistent and automatic detection of threats (people and cars) in the perimeter of secure facilities, from distances beyond $150m. Phelps2020’s solution performs automatic and concurrent mitigation of several environmental degradations, including low light, fog, haze, blur, high dynamic range, backlighting, and l ...

    SBIR Phase I 2020 Department of DefenseAir Force
  7. A COMPREHENSIVE PNS UPGRADE FOR THREE-DIMENSIONAL REENTRY FLOW PREDICTION

    SBC: Computational Mechan            Topic: N/A

    THE MISSION OF THIS PHASE I PROJECT IS COMPLETION OF A TRULY INNOVATIVE STUDY TO UPGRADE EXISTING PNS CODES FOR COMPUTING HIGHSPEED, THREE-DIMENSIONAL RE-ENTRY FLOWFIELDS. THE PLAN OF ACTION ENCOMPASSES A THOROUGH EXAMINATION OF THE RANGE OF ADMISSABLE CFD THEORIES, TO UNEQUIVACALLY COMPARE STRONG AND WEAK POINTS FOR APPLICATION TO THE REYNOLDS-AVERAGED NAVIER-STOKES EQUATIONS WITH DIFFERENTIAL EQ ...

    SBIR Phase II 1989 Department of DefenseAir Force
  8. A COMPREHENSIVE PNS UPGRADE FOR THREE-DIMENSIONAL REENTRY FLOW PREDICTION

    SBC: Computational Mechan            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  9. Adaptive and Integrated Multicast for the Airborne Networks (AIM-AN)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF112035

    ABSTRACT: Secure and efficient IP multicast improves efficiency of bandwidth utilization in tactical networks such as the Airborne Networks and facilitates effective and timely dissemination of mission critical information among tactical edge users. In this SBIR effort, Architecture Technology Corporation (ATC) proposes an innovative Adaptive and Integrated Multicast for the Airborne Networks (AI ...

    SBIR Phase I 2012 Department of DefenseAir Force
  10. Adaptive and Integrated Multicast for the Airborne Networks (AIM-AN)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF112035

    ABSTRACT: The Air Force has identified the need for a technological capability to provide secure, dynamic and efficient multicast services over crypto-partitioned heterogeneous tactical networks, to ensure efficient use of bandwidth-constrained airborne networks. During Phase I of this SBIR, Architecture Technology Corporation (ATC) defined an innovative technology called Adaptive and Integrated ...

    SBIR Phase II 2013 Department of DefenseAir Force
US Flag An Official Website of the United States Government