You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low Cost 3D Woven CC Composites
SBC: 3TEX, Inc. Topic: N/AN/A
SBIR Phase II 2000 Department of DefenseNavy -
N/A
SBC: 3TEX, Inc. Topic: N/AN/A
STTR Phase I 2000 Department of DefenseArmy -
N/A
SBC: 3TEX, Inc. Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseArmy -
N/A
SBC: 3TEX, Inc. Topic: N/AN/A
STTR Phase I 2000 Department of DefenseAir Force -
N/A
SBC: ADVANCED SEPARATION & ABSORPTION PRODUCT Topic: N/ANot Available This initiative designs and fabricates robust, solid state, ultra-high spectral resolution filters, for use at 1064 nm and 355 nm as a lidar receiver with doppler capability. The two systems are similar, except for pre-filtering and dispersive element co
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: ADVANCED SEPARATION & ABSORPTION PRODUCT Topic: N/AN/A
SBIR Phase II 2000 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: AGENTASE LLC Topic: N/AN/A
STTR Phase I 2000 Department of DefenseArmy -
Hand-Held, Battery-Operated Device for Rapid Gene Detection of Multiple Biological Agents
SBC: ALDERON BIOSCIENCES, INC. Topic: N/AN/A
SBIR Phase II 2000 Department of DefenseArmy -
Intelligent Access HUB Technology
SBC: OBERON, INC. Topic: N/AN/A
SBIR Phase II 2000 Department of DefenseArmy -
N/A
SBC: Bally Ribbon Mills Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseArmy