You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Additively Manufactured GTNANO(R) RadHard Imaging CubeSat

    SBC: GOODMAN TECHNOLOGIES LLC            Topic: SF224D027

    Goodman Technologies (GT) patented and patent pending additively manufactured (AM) nanocomposite materials, registered trademark GTNANO®, are dual-use and include AM silicon carbide mirrors and telescopes, and  advanced radiation shielding that employs na

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Continuous Bi-Directional Spacecraft System Communications

    SBC: SOLSTAR SPACE COMPANY            Topic: AFX236DPCSO1

    Solstar’s Critical Data Relay Spacecraft Operational Status (CritDR-SOS), aka Deke, unit integrates with a spacecraft’s Telemetry, Tracking and Commanding (TT&C) system to provide first-ever bi-directional, continuous, internet-based monitoring of the spa

    SBIR Phase II 2023 Department of DefenseAir Force
  3. Energy Efficiency, Force Protection, and Resilient Basing through Custom, On-Demand Building Retrofits

    SBC: BRANCH TECHNOLOGY, INC.            Topic: AFX236DPCSO1

    Branch Technology is an architectural manufacturer specializing in construction 3D printing. Branch's process, called Cellular Fabrication (C-Fab®), combines industrial robotics, custom geometric sequencing algorithms, a novel "Freeform" extrusion technol

    SBIR Phase II 2023 Department of DefenseAir Force
  4. Containerized Artificial Intelligence for microservices-based Open-architecture Signals intelligence (CAIOS) Phase II

    SBC: STATHEROS LLC            Topic: X224OCSO1

    Microservices-Based (MB) Radio Frequency (RF) and Electromagnetic Spectrum Operations (EMSO) systems are the future for the US Department of Defense (DoD) as evidenced by the numerous MB-EMSO payload development and maturation initiatives across the Depar

    SBIR Phase II 2023 Department of DefenseAir Force
  5. MCT Custom Platform--Nuclear Response Trailer

    SBC: MCT INDUSTRIES, INC.            Topic: X224OCSO1

    MCT Industries, Inc. and our DAF User, the 509 Civil Engineering Squadron EOD Flight at Whiteman AFB, have cohesively performed the Phase I due diligence feasibility study of the innovative MCT Custom Platform Nuclear Response Trailer (NRT), a tailored, r

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force or Space Force Stakeholder Need

    SBC: VEXTEC Corporation            Topic: X224OCSO1

    Additive Manufacturing (AM) offers the potential for 30-60% cost savings on complex, high-value parts in the aerospace industry by reducing machining costs and part count in complex assemblies. However, despite the potential financial benefits, high testi

    SBIR Phase II 2023 Department of DefenseAir Force
  7. Document Generation Platform (DGP)

    SBC: Inkit Inc.            Topic: AF20CTCSO1

    Currently, defense-wide USG organizations can take weeks to compile critical reports, assembling information and data using the “cut and paste” method. These critical reports synthesize newly available information to assist in decision-making on both a po

    SBIR Phase II 2023 Department of DefenseAir Force
  8. Space Prognostic AI Custodian Ecosystem (SPAICE)- TACFI

    SBC: RESILIENT SOLUTIONS 21, LLC            Topic: AF211DCSO1

    The TACFI funding will allow the SPAICE tool to be a part of future iterations of the STP Operations center to include a forthcoming cloud deployment. In support of this cloud deployment RS21 will gather and document requirements and investigate additiona

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Foreign Object Retrieval System (FORS)

    SBC: ARCHITECTURE TECHNOLOGY INC            Topic: AF2310014

    Flightline workers currently perform foreign object debris (FOD) checks prior to every airfield entry, which may be adversely affected by various external factors. Any missed foreign object (FO) presents a significant hazard to aircraft operating on the a

    SBIR Phase I 2023 Department of DefenseAir Force
  10. Directed Energy Environmental Decision Systems (DEEDS)

    SBC: MZA ASSOCIATES CORPORATION            Topic: AF182033

    MZA proposes a Directed Energy Decision System (DEEDS) inspired by the considerable experience MZA has gained in system modeling and atmospheric characterization for effects modeling and our progress made under the initial Phase II contract.  The approach relies on numerical weather prediction or real-time meteorological and turbulence measurements data input to Laser Environmental Effects Defini ...

    SBIR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government