You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Fracture Toughness Analysis of Metastable Beta Titanium Alloys

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  2. Neural Network Compensation Strategy for Preventing Pilot-Induced Oscillations

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  3. Analytical Techniques for Computing Aeroheating, Thermal Protection and Temperature Effects on Hypersonic Vehicles

    SBC: A & E Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  4. High Fidelity Low Noise Dense RF Radar Threat Environment Simulator

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    Current radar environment simulators do not have sufficient capability to stimulate the next generation EC and ESM receivers. These new receivers will have sensitivity levels that are significantly below the noise floor capabilities of current simulators. This proposal examines a variety of approaches to improve the performance of a radar environment simulator. It addresses the key performance a ...

    SBIR Phase I 1995 Department of DefenseAir Force
  5. Multispectral Fusion Techniques

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    This Small Business Innovation Research Phase I project will integrate a FLIR model (GT-Visit), a Synthetic Aperture Radar (SAR) model (XPatch), representative FLIR classification algorithms, and representative SAR classification algorithms along with the development of decision fusion algorithms to quantify performance benefits of additional sensor information. The performance will be measured f ...

    SBIR Phase I 1995 Department of DefenseAir Force
  6. Model Integration through Intelligent Data Parsing and Management

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    The proliferation of both real-time and non-real time legacy models has produced a genuine problem with integrating these models effectively. Automated integration is required to permit the analyst to focus on performance and cost effectiveness analysis instead of cumbersome data manipulation. The primary objective of this Phase I effort is to produce a prototype design of an Automated Model Int ...

    SBIR Phase I 1995 Department of DefenseAir Force
  7. Visual Attention for Foveal Machine Vision

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    An attention mechanism can influence system behavior and performance only to the extent in which system resources are allocatable. A key visual resource is acuity, which is fixed in conventional uniform acuity machine vision. Foveal vision features imagers with graded acuity coupled with context sensitive sensor gaze control, analogous to that prevalent throughout vertebrate vision. Foveal syst ...

    SBIR Phase I 1995 Department of DefenseAir Force
  8. Avionics Wind Tunnel Concept

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  9. Large-Area High-Throughput Patterning System with Submicron Resolution

    SBC: Anvik Corporation            Topic: N/A

    In the fabrication of many electronic and opto-electronic products, such as multichip modules (MCMs), flat-panel displays (FPDs) and printed circuit boards (PCBs), it is necessary to fabricate millions of microscopic structures on a single large substrate. Large format manufacturing equiptment, therefore,plays a critical role in determining the overall cost of these productis. Over the last two ...

    SBIR Phase II 1995 Department of DefenseAir Force
  10. Large-Area High-Throughput Patterning System with Submicron Resolution

    SBC: Anvik Corporation            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
US Flag An Official Website of the United States Government