You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Bearing Compartment Sealing for Gas Turbine Engines
SBC: ADVANCED COMPONENTS & MATERIALS, INC. Topic: AF071172Carbon seals generlly used for bearing compartments will incrasingly become unsuitable for future gas turbine engines with higher buffer air temperatures, higher pressur and rotor surface speeds.Phase I effort will focus on a synergistic approach including advanced materials and design.Three materials including a (Ti,Mo)(C,N) cermet, B-C composite and a current high temperature grade carbon MAT-12 ...
SBIR Phase I 2007 Department of DefenseAir Force -
Physics-Based Identification, Modeling and Management Infrastructure of Aeroelastic Limit-Cycle Oscillations
SBC: Advanced Dynamics, Inc. Topic: AF07T006The proposed research program aims to develop a physics-based identification, modeling and management infrastructure for aeroelastic limit-cycle oscillations. This infrastructure will be built upon high fidelity state-of-the-art theoretical/computational methods as validated and verified by available experimental data bases, and will include (1) rapid flutter boundary determination for a wide ran ...
STTR Phase I 2007 Department of DefenseAir Force -
Cyber Craft System Scaling
SBC: ADVENTIUM ENTERPRISES, LLC Topic: OSD06IA5Many technical challenges will need to be surmounted to create practical cybercraft: assurance, control, rules of engagement, representation and discovery of the target environment, among others. However a serious challenge lurks behind all of these: scaling solutions to fleets of up to a million craft. New approaches are needed to deploy and control the craft at this scale. Failure to come to gr ...
SBIR Phase I 2007 Department of DefenseAir Force -
Wax Substitutes for Melt Castable Explosive Fills
SBC: Applied Colloids Topic: AF06151Due to the phasing out of TNT usage in explosives due to safety and environmental concerns, insensitive explosives utilizing wax binders instead of TNT have gradually replaced TNT in bombs and other explosive shells. The wax material that has been the most utilized in this application has been carnauba wax, but due to its non-domestic production and its dependence on natural growth and harvest me ...
SBIR Phase II 2007 Department of DefenseAir Force -
Dynamic Kernel Monitoring for Attack Detection and Mitigation
SBC: Computer Measurement Laboratory, LLC Topic: OSD07I05The activity of an OS kernel may be monitored dynamically in real time. As the kernel executes, the transition among the constituent components of the kernel will follow a predictable pattern representing the normal operation of the kernel. An attack on the operating system will induce a significant and immediately recognizable disturbance in this pattern of normal activity. The Attack Recognit ...
SBIR Phase I 2007 Department of DefenseAir Force -
Real Time Cockpit Resource Management (CRM) Training
SBC: CREW TRAINING INTERNATIONAL, INC. Topic: AF071027Identification of the key human factor skill set involved in Situational Awareness, Task Management and Decision Making for focused alternative training. Alternative training that focuses on the practice and improvement those key human factor skills. CTI has received the commitment of three groups to conduct this investigation. The UAV squadron located at Creech AFB, the A-10 squadron located a ...
SBIR Phase I 2007 Department of DefenseAir Force -
High Specific Power, Rapid Start-up 95 GHz Source Technology
SBC: CRYOMAGNETICS INC Topic: OSD05D02Military applications of high power millimeter-wave directed energy weapons technologies require high field superconducting magnets that are incorporated in gyrotron devices. The magnets must be cooled to cryogenic temperatures to operate, giving rise to several technical challenges. Gyrotron magnets have traditionally required a relatively long time to cool-down (typically at least 24 hours) an ...
SBIR Phase II 2007 Department of DefenseAir Force -
Timely Decision-Making for Logistics Support
SBC: DPRA INCORPORATED Topic: AF071070The objective of this proposal is to conduct research to address problems of inadequate logistics support planning during the contingency or crisis action planning process. The current deployment planning process primarily focuses on the flow of forces into theater and sustainment planning is regulated to a secondary effort, or worse, as an afterthought. The Global Channel Analysis for Logistic ...
SBIR Phase I 2007 Department of DefenseAir Force -
Enhanced, All-Weather Unmanned Air Vehicle (UAV) Sense and Avoid (SAA)
SBC: FLIGHT SAFETY TECHNOLOGIES, INC. Topic: AF071257This SBIR Phase I proposal requests $99739 for Flight Safety Technologies, Inc. to investigate the feasibility and all-weather capability of a novel radar concept as an active, non-cooperative SAA sensor for UAVs. The concept radar, which we call Unicorn, is a narrow-band pulsed radar operating around a center frequency of 5.145 GHz in the aviation C-band, which has been approved for this develop ...
SBIR Phase I 2007 Department of DefenseAir Force -
Computational Modeling of Two-Phase Cooling Systems for Future Generation Electronics
SBC: INNOVATIVE RESEARCH, INC. Topic: AF071262The overall objective of the proposed research is to develop a comprehensive, efficient, and well-validated computational method for the prediction of thermodynamic and hydrodynamic performance of various types of two-phase cooling systems for next generation electronics. In order to address the unique features of two-phase systems, the computational method will use a novel two-level approach that ...
SBIR Phase I 2007 Department of DefenseAir Force