You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Monitoring of Arcing Condition in GMAW and Its Variants

    SBC: ADAPTIVE INTELLIGENT SYSTEMS            Topic: N08178

    This SBIR Phase I project is to prove the feasibility of an innovative weld monitoring technology. This innovative technology is characterized by (1) an innovative non-transferred arc sensor which responds to both surface conductivity and sensor-to-joint distance and can be used to monitor the joint geometry and possible surface contamination such as paint, oil, sand, etc. and (2) an innovative me ...

    SBIR Phase I 2008 Department of DefenseNavy
  2. A Modified GMAW System for Distortion Reduction and Travel Speed Increase through Separate Heat Input and Deposition Rate Control

    SBC: ADAPTIVE INTELLIGENT SYSTEMS            Topic: N07211

    Gas Metal Arc Welding (GMAW) is the most widely used welding process. It is also the major process used in shipbuilding. In traditional GMAW and all its modifications, the current which melts the wire is the same as the current which heats the base metal. The base metal heat input is thus proportional to the heat which melts the wire. To maintain a minimally acceptable productivity as measured by ...

    SBIR Phase I 2008 Department of DefenseNavy
  3. Sensor Torch Based Adaptive Intelligent Control for Circumferential Welding of Pipes

    SBC: ADAPTIVE INTELLIGENT SYSTEMS            Topic: N05154

    Orbital pipe welding systems are not true emulation of skilled welders who adjust welding parameters based on observation on the weld pool. This SBIR Phase II project aims at the development of commercial prototype systems which can adaptively adjust welding parameters based on an observation on the weld pool surface like a skilled welder but does not require the torch to be moved smoothly/evenly. ...

    SBIR Phase II 2008 Department of DefenseNavy
  4. Digital Method for Improved Custom Hearing Protection Equipment

    SBC: ShapeStart Measurement Systems, Inc.            Topic: N08153

    The DoD spends over $1 Billion annually on disability payments attributed to hearing loss, yet this can be prevented. Research shows that with proper hearing protection a 19% reduction in hearing loss cases can be expected. Custom ear plugs force the user to wear the devices correctly and to retain hearing protection during activity, thus eliminating improper seating issues as the primary cause o ...

    SBIR Phase I 2008 Department of DefenseNavy
  5. Inspiratory Impedance as a Treatment for Traumatic Brain Injury

    SBC: ADVANCED CIRCULATORY SYSTEMS, INC.            Topic: A06150

    Traumatic head and neck injuries account for 16-33% of all war-related injuries and are a leading cause of mortality upon evacuation to a definitive care setting. Therapeutic advances are urgently needed for these soldiers. This application is focused on treating one of the most important determinants of outcome from severe head injury, the degree and duration of elevated intracranial pressure (I ...

    SBIR Phase II 2008 Department of DefenseArmy
  6. Physics-Based Rapid Aeroelastic Model Updating In Support Of Aircraft Flight Testing

    SBC: Advanced Dynamics, Inc.            Topic: AF073142

    The objective of the proposed research aims to develop Reduced Order Models (ROMs) (i.e. POD, HB, combined POD and HB) based upon flight data to better predict the aircraft aeroelastic response at next flight condition, e.g. higher Mach number. By incorporating flight test data and using the highest fidelity computational models in reduced order form we will obtain computational solutions that a ...

    SBIR Phase I 2008 Department of DefenseAir Force
  7. VABS Enabled Design Environment for Efficient High-Fidelity Composite Rotor Blade and Wing Section Design

    SBC: Advanced Dynamics, Inc.            Topic: A08022

    This SBIR aims at developing a high-fidelity, yet efficient and easy-to-use, composite rotor blade and wing section design environment to facilitate rapid and confident aeromechanics assessment during conceptual design stages. A well-known technical barrier for composite rotor blade and wing section design is the lack of an efficient, user friendly, high-fidelity design tool to realistically repre ...

    SBIR Phase I 2008 Department of DefenseArmy
  8. Next generation Combat System Development Approach

    SBC: ADVANCED SOLUTIONS FOR TOMORROW, INC.            Topic: N08183

    The design, development, testing, and maintenance of future complex combat systems will require new approaches and technologies. Present software technologies are limited by the fact that the computing system architectural layers and software components are not integrated. New software technologies are needed to adopt a more integrated view of the system architectural layers and software component ...

    SBIR Phase I 2008 Department of DefenseNavy
  9. Multi-Level Security Smart Proxy Agent for Bandwidth and Time Constrained Users

    SBC: ADVANCED SOLUTIONS FOR TOMORROW, INC.            Topic: N07065

    The objective of the project outlined in this proposal is to design, build, test, and integrate a Communications Prioritization Tool (CPT) that will prioritize and optimize information exchange. Information exchange requires communication across multiple internal and external network systems utilizing a submarine’s limited external communications capability, multiple internal networked subsystem ...

    SBIR Phase II 2008 Department of DefenseNavy
  10. Mixed Criticality, Assured, Real-Time (MiCART) VMM

    SBC: ADVENTIUM ENTERPRISES, LLC            Topic: OSD07I10

    Without strong temporal and spatial separation guarantees provided by the underlying system, integrated mixed critical applications require verification and validation of all their hosted applications at the highest level of criticality. Since the early 1990s, time and space partitioning in commercial avionics has drastically reduced the certification burden on the lower-criticality applications. ...

    SBIR Phase I 2008 Department of DefenseNavy
US Flag An Official Website of the United States Government