You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MULTIPLE LASER MEASUREMENT SYSTEM

    SBC: Apeiron Inc            Topic: N/A

    THE KEY PROBLEM TO BE ADDRESSED IN PHASE I OF THIS PROJECT WILL BE TO DETERMINE THE FEASIBILITY OF A NOVEL POSITION MEASURING SYSTEM FOR A FAMILY OF COMPUTER CONTROLLED MACHINE TOOLS. THE MULTIPLE LASER MEASUREMENT SYSTEM (MLMS), WHICH FORMS THE BASIS OF THIS PROPOSAL, WILL MEASURE THE (X, Y, Z) POSITION OF THE CUTTING HEAD DIRECTLY AT RATES AND ACCURACIES SUFFICIENT FOR CLOSED LOOP POSITION CONTR ...

    SBIR Phase I 1990 Department of DefenseAir Force
  2. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    SBC: Daina            Topic: N/A

    FUTURE MILITARY AVIONICS SYSTEMS WILL REQUIRE AT LEAST AN ORDER OF MAGNITUDE IMPROVEMENT IN MEAN TIME BETWEEN CRITICAL FAILURES. TO ACHIEVE THIS GOAL INNOVATIVE FAIL-SAFE FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN CONCEPTS WILL BE NEEDED. THE APPROACH PROPOSED BY DAINA WILL BE BASED ON THE USE OF EXTERNAL ENVIRONMENT DATA, BUILT-IN RELIABILITY MODEL, ADAPTIVE STATISTICAL SYSTEM STATE AND PARAMETER ES ...

    SBIR Phase II 1990 Department of DefenseAir Force
  3. PULSE TO DIGITAL CONVERSION SYSTEM

    SBC: Moscow Electronics Co            Topic: N/A

    THE COMPLETE DESIGN IS PRESENTED WITHIN THIS PROPOSAL FOR A SYSTEM WHICH WILL PROVIDE A PRECISE, ONE-STEP CONVERSION DIRECTLY FROM A PULSE TRAIN INPUT TO A DIGITIZED PULSE RATE OUTPUT. IT IS A DISTRIBUTED PROCESSOR SYSTEM EMPLOYING A MASTER CONTROL PROCESSOR AND FROM 2 TO 30 IDENTICAL PULSE MODULES. THE PULSE MODULE IS A STANDALONE UNIT WHICH PERFORMS THE PULSE PERIOD MEASUREMENT. THE MICROPROCESS ...

    SBIR Phase II 1990 Department of DefenseAir Force
  4. PREDICTING 3-D WINDFLOWS AT VENDENBERG AFB USING A MESOSCALE NUMERICAL MODEL

    SBC: R*scan Corp            Topic: N/A

    THE PREDICTION OF MESOSCALE DISPERSION, FOR EMERGENCY RESPONSE PURPOSES, IS CRITICALLY DEPENDENT UPON ACCURATELY FORECASTING THE 3-D WIND FIELD WITHIN THE DOMAIN OF INTEREST SEVERAL HOURS IN ADVANCE. CURRENTLY AVAILABLE EMERGENCY RESPONSE SYSTEMS, WHICH TYPICALLY USE SOME FORM OF GAUSSIAN DIFFUSION MODEL COMBINED WITH WIND FIELDS INTERPOLATED FROM SCATTERED SURFACE LAYER WIND MEASUREMENTS, ARE, UN ...

    SBIR Phase II 1990 Department of DefenseAir Force
  5. SOLID STATE LASER SCANNER FOR LASER ORDNANCE INITIATOR

    SBC: Apa Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseAir Force
  6. IN-PLACE DATA RECORDER FOR AIRCRAFT TRANSPARENCY SYSTEMS

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseAir Force
  7. AUTOMATED MBE PROCESS WITH REAL TIME SENSOR CONTROL

    SBC: SVT ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseAir Force
  8. OPTIMIZATION OF RESONANT INTERBAND TUNNEL DEVICES

    SBC: Zytron Ltd            Topic: N/A

    RESONANT INTERBAND TUNNEL DIODES (RITD'S) ARE A NEW NEGATIVE RESISTANCE DEVICE, WITH POTENTIAL FOR VERY HIGH SPEED, LARGE PEAK TO VALLEY RATIOS, AND THE POTENTIAL FOR CUSTOMIZED I/V CURVES. THESE DEVICES ARE BELIEVED TO BE CAPABLE OF SWITCHING IN \2PS., OR OF OFFERING GAIN IN THE TERAHZ RANGE. POTENTIAL APPLICATIONS INCLUDE THE GENERATION, AMPLIFICATION, AND DETECTION OF TEREHZ RANGE SIGNALS, AND ...

    SBIR Phase I 1991 Department of DefenseAir Force
  9. Robust, Lightweight Wiring for Space Applications

    SBC: MINNESOTA WIRE & CABLE CO            Topic: AF112093

    ABSTRACT: An ability to reduce the weight of cables has the potential to provide significant cost savings, reduce maintenance and improve reliability of satellites. The costs of developing and producing satellites are linearly proportional with the satellite"s weight, with each kilogram costing around $1 million when delivery-to-space costs are included. With global satellite launches expected to ...

    SBIR Phase II 2014 Department of DefenseAir Force
  10. Selective Availability Anti-Spoofing Module (SAASM) Compliant GPS Receiver for GEO

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: AF141113

    The objective of this proposal is to develop Selective Availability Anti-Spoofing Module (SAASM) compliant GPS receiver for Geosynchronous Earth Orbit (GEO) applications. In this proposal, we explore an approach to design the GEO GPS SAASM receiver based on improved techniques for signal acquisition (or detection) and then signal tracking (and demodulation) of weak GPS signals. GPS signals availa ...

    SBIR Phase I 2014 Department of DefenseAir Force
US Flag An Official Website of the United States Government