You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A GaN-A1GaN CCD for UV Imaging Applications

    SBC: Apa Optics, Inc.            Topic: N/A

    We propose a unique GaN-Al(sub x)Ga(sub 1-x)N heterojunction based CCD for imaging in the ultraviolet (wavelengths less than 365 nm). Our proposed device will be solid state, TTL compatible and in it's final configuration solar blind. The Phase I program is aimed at establishing the technical feasibility of our device concept. Our proposed CCD is in essence a GaN-AlGaN gated photoconductor with ...

    SBIR Phase II 1996 Department of DefenseAir Force
  2. Low Cost, High Energy Semiconductor Switches

    SBC: Aria Corp            Topic: N/A

    This proposal describes new low cost, low risk semiconductor-based approaches to fuze trigger circuit technology. These innovative approaches build on the promising new technology platform developed by ARIA as part of earlier SBIR research. ARIA's technology platform, initially developed for driving extremely high speed (400 picosecond rise time), high peak current pulses (400A) through laser di ...

    SBIR Phase I 1996 Department of DefenseAir Force
  3. Vortex Controllers and Dynamic Analysis

    SBC: Consulting Aviation Services            Topic: N/A

    The project objective are to develop a new software method for the dynamic analysis of aircraft and to prove the potential of unique high angle of attack Leading Edge Vortex Control (LEVC) devices. The software method will be an upgrade of a current computer code. The upgrade will include the effects of hysteresis during dynamic stall. New methods recently published employing state-spac ...

    SBIR Phase I 1996 Department of DefenseAir Force
  4. Pre-Award Systems Acquisition Processing System (PASAPS)

    SBC: Frontline Solutions Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  5. HEMT and HBT Process Design

    SBC: Gateway Modeling, Inc            Topic: N/A

    This effort will address five problems in the process design of heterojunction bipolar transistors (HBTs) and high electron mobility transistors (HEMTs): (1) HEMT thermal impedances will be measured using a novel method and will be compared with finite-element simulations to provide more accurate values for computer-aided design programs. (2) The role of the spacer layer in HEMT performance and ...

    SBIR Phase II 1996 Department of DefenseAir Force
  6. Fractal Object Database System for Simulation Environments

    SBC: Iterated Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  7. An ASTROS Compatible Computational Strategy for Evaluating the Aeroelastic Response, Buckling and Integrity of Comp. A/C

    SBC: Knowledge Systems Inc.            Topic: N/A

    An ASTROS compatible computational strategy for evaluating the aeroelastic response, buckling and integrity of aircraft structures made of advanced laminated composite materials is proposed. The proposed computational strategy will be global/local in nature and as such will include the capability to analyze the global stress, vibration, buckling and aeroelastic response of aircraft structures mad ...

    SBIR Phase II 1996 Department of DefenseAir Force
  8. A Novel Computational System for Real-Time Analysis and Prediction of Antenna-to-Aircraft and Antenna-to-Antenna Interactions

    SBC: Matis, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  9. High Density Shock Survivable Microelectronics

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  10. Enhancing the Accuracy and Utility of Performance Measurement in the AF

    SBC: Personnel Decisions Research            Topic: N/A

    Final course grades in military technical schools are frequently used as the criterion in assessing the validity of a variety of cognitive, perceptual, and psychomotor ability tests. PDRI proposes an innovative approach to criterion development for use by AF researchers. During the proposed Phase I SBIR effort, we plan to begin development of two sets of criterion measures. The first set will b ...

    SBIR Phase II 1996 Department of DefenseAir Force
US Flag An Official Website of the United States Government