You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MULTIPLE LASER MEASUREMENT SYSTEM

    SBC: Apeiron Inc            Topic: N/A

    THE KEY PROBLEM TO BE ADDRESSED IN PHASE I OF THIS PROJECT WILL BE TO DETERMINE THE FEASIBILITY OF A NOVEL POSITION MEASURING SYSTEM FOR A FAMILY OF COMPUTER CONTROLLED MACHINE TOOLS. THE MULTIPLE LASER MEASUREMENT SYSTEM (MLMS), WHICH FORMS THE BASIS OF THIS PROPOSAL, WILL MEASURE THE (X, Y, Z) POSITION OF THE CUTTING HEAD DIRECTLY AT RATES AND ACCURACIES SUFFICIENT FOR CLOSED LOOP POSITION CONTR ...

    SBIR Phase I 1990 Department of DefenseAir Force
  2. ANTHROPOMORPHIC CUTANEOUS TACTILE SENSING ON DEXTEROUS MECHANICAL HANDS

    SBC: BONNEVILLE SCIENTIFIC, INC.            Topic: N/A

    ALTHOUGH SPECIALLY DESIGNED END-EFFECTORS HAVE PROVIDED PRESENT DAY ROBOTS AND TELEOPERATOR SYSTEMS WITH THE ABILITY TO DO MANY INTRICATE TASKS, TRUE MANIPULATOR DEXTERITY WILL ONLY COME THROUGH THE USE OF MULTI-FINGERED ANTHROPOMORPHIC MECHANICAL HANDS. STABLE GRASPING OF IRREGULAR OBJECTS, OBJECT RECOGNITION, PRECISION ASSEMBLY, AND PERFORMANCE OF MANY INTRICATE TASKS NOW CONFINED TO HUMANS WILL ...

    SBIR Phase II 1990 Department of DefenseAir Force
  3. FAIL-SAFE FAULT-TOLERANT ELECTRONICS

    SBC: Daina            Topic: N/A

    FUTURE MILITARY AVIONICS SYSTEMS WILL REQUIRE AT LEAST AN ORDER OF MAGNITUDE IMPROVEMENT IN MEAN TIME BETWEEN CRITICAL FAILURES. TO ACHIEVE THIS GOAL INNOVATIVE FAIL-SAFE FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN CONCEPTS WILL BE NEEDED. THE APPROACH PROPOSED BY DAINA WILL BE BASED ON THE USE OF EXTERNAL ENVIRONMENT DATA, BUILT-IN RELIABILITY MODEL, ADAPTIVE STATISTICAL SYSTEM STATE AND PARAMETER ES ...

    SBIR Phase II 1990 Department of DefenseAir Force
  4. SOLID LUBRICANTS FOR ADVANCED TURBINE ENGINE POWDER DELIVERY SYSTEM

    SBC: Desilube Technology, Inc.            Topic: N/A

    IN ORDER TO ACHIEVE THE TECHNOLOGY AND LIFE CYCLE GOALS TARGETS FOR THE ADVANCED TURBINE ENGINES OPERATING BETWEEN -60 DEG AND 1500 DEG F, SOLID LUBRICANTS OFFER A VIABLE APPROACH. DURABILITY LIMITATIONS FOR SUCH ENGINES RESULT FROM HIGH OPERATING TEMPERATURES AND THE ELIMINATION OF COOLING SYSTEMS. THESE FACTORS MINIMIZE THE EFFECTIVENESS OF CONVENTIONAL OIL OR GREASE LUBRICANT DUE TO THERMAL AND ...

    SBIR Phase II 1990 Department of DefenseAir Force
  5. SOLID LUBRICANTS AND THEIR DISTRIBUTION FOR ADVANCED AIRCRAFT GAS TURBINES

    SBC: Desilube Technology, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEMONSTRATE EXPERIMENTALLY A NOVEL APPROACH TO DELIVERING A SOLID POWDER AS AN AEROSOL OF IMPROVED STABILITY. THE PROPOSED SYSTEM WILL BE DESIGNED SPECIFICALLY FOR THE DELIVERY OF MOLYBDENUM DISULFIDE TO THE BEARINGS OF THE DEVELOPMENTAL ADVANCED AIRCRAFT GAS TURBINE, WHICH MAY OPERATE BETWEEN THE EXTREMES OF -60 DEG F AND 1500 DEG F. THE AVAILABLE LIQUID LUBRIC ...

    SBIR Phase I 1990 Department of DefenseAir Force
  6. A DIAMOND TRANSMIT/RECEIVE SWITCH FOR RADAR

    SBC: DIAMOND MATERIALS INC            Topic: N/A

    THE PURPOSE OF THIS PROPOSED PROGRAM IS TO DEVELOP A DIAMOND TRANSMIT/RECEIVE (T/R) SWITCH FOR HIGH POWER, HIGH FREQUENCY RADAR SYSTEMS. THE DIAMOND ELECTRONIC DEVICE MOST LIKELY TO ACHIEVE THE DESIRED T/R SWITCH SPECIFICATIONS IS AN INSULATED GATE FIELD EFFECT TRANSISTOR (IGFET) OPERATED AS A SWITCHING POWER TRANSISTOR. DIAMOND MATERIALS, INC. (DMI), PLANS TO DEVELOP A DIAMOND IGFET T/R SWITCH IN ...

    SBIR Phase I 1990 Department of DefenseAir Force
  7. DEVELOPMENT OF MULTI-FORMATION MODE SFF WARHEAD FOR ENHANCED ARMOR LETHALITY

    SBC: Dyna East Corp.            Topic: N/A

    CURRENT TOP-ATTACK ANTI-ARMOR MUNITIONS CONTAINING SELF-FORGINGFRAGMENT (SFF) WARHEADS ARE DEDICATED DESIGNS THAT ARE INTENDED TO DEFEAT A SPECIFIC TYPE OF TARGET AND ARE GENERALLY LESS EFFECTIVE AGAINST OTHER TARGETS. THUS ONE TYPE OF WARHEAD DESIGN IS PRESENTLY USED AGAINST HARD TARGETS, SUCH AS TANKS, AND A DIFFERENT TYPE IS USED AGAINST SOFT TARGETS, SUCH AS ARMORED PERSONNEL CARRIERS OR TRUCK ...

    SBIR Phase II 1990 Department of DefenseAir Force
  8. TARGET NEUTRALIZATION MECHANISMS

    SBC: GENERAL SCIENCES INC            Topic: N/A

    GENERAL SCIENCES, INCORPORATED PROPOSES THE USE OF HIGHLY ENERGETIC PARTICLE FORMATION TECHNIQUES FOR THE PRODUCTION OF HIGH INTENSITY CLOUDS FOR COMBINED IR OPTICS INCAPACITATION AND ENGINE PARTICLE INGESTION. UTILIZING THE SGI PROPRIETARY HI-THERM SYNTHESIS TECHNOLOGY, THIS APPROACH WILL PRODUCE VERY-FINE REFRACTORY CERAMIC PARTICLES THROUGH A RAPID, HIGH TEMPERATURE REACTION. CALCULATIONS WILL ...

    SBIR Phase I 1990 Department of DefenseAir Force
  9. ADAPTIVE ARRAY NEAR FIELD MEASUREMENTS USING THE FRESNEL TRANSFORM APPROXIMATION

    SBC: Graham Research Corp.            Topic: N/A

    THIS PROPOSAL IS ADDRESSED TO THE TECHNICAL PROBLEM OF DETERMINING THE FAR-FIELD PERFORMANCE OF ADAPTIVE ARRAY ANTENNAS USING NEAR-FIELD MEASUREMENTS. THE INNOVATIVE CONCEPT PROPOSED IS TO FOCUS THE ARRAY IN THE NEAR FIELD BY THE FRESNEL TRANSFORM APPROXIMATION TO, IN EFFECT, MAKE PLANAR THE SPHERICAL WAVEFRONTS FROM NEAR-FIELD JAMMERS, SO THAT THEY APPEAR TO BE LOCATED IN THE FAR-FIELD WHEN THE A ...

    SBIR Phase I 1990 Department of DefenseAir Force
  10. INTEGRATED DESIGN OF SMART PHASED ARRAY SYSTEMS

    SBC: Interspec Inc            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEFINE THE DESIGN PRINCIPLES OF A SMART PHASED ARRAY RADAR SYSTEM WHICH INTEGRATES THE FOLLOWING FUNCTIONS (I) DIGITAL BEAMFORMING, (II) SELF-MONITORING OF ARRAY PERFORMANCE, (III) AUTOMATIC DETECTION AND CORRECTION OF COMMON AND CORRECTABLE ELEMENT FAILURES, AND (IV) RAPID (MICROSECOND) JAMMER NULLING. SELF-MONITORING AND FAILURE COMPENSATION WILL BE PERFORMED ...

    SBIR Phase II 1990 Department of DefenseAir Force
US Flag An Official Website of the United States Government