You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Radiation Hardened Graphene based Nonvolatile Memory for Space Applications
SBC: NANOSONIC INC. Topic: AF131082ABSTRACT: This Air Force Phase I SBIR program would develop and demonstrate radiation hardened graphene based nonvolatile memory(NVM) for space applications. Specifically, we would combine advances in resistive memory materials, including graphene and graphene oxides, with the careful manipulation of metal ion, oxygen vacancy or other charge transport in graphene based materials, to realize the r ...
SBIR Phase I 2014 Department of DefenseAir Force -
Aircraft Mission Planning Equipment (MPE) Obsolescence
SBC: Ludlum Measurements, Inc. Topic: AF132001ABSTRACT: A Universal Data Transfer Device (UDTD) is proposed which will standardize Data Transfer Devices used in various forms of aircraft. This proposal is for a Phase I effort that will investigate options for a new technology developing proposing new standard for digital, removable, ruggedized, plug compatible, upgradeable system with higher capacities than current systems and has the abilit ...
SBIR Phase I 2014 Department of DefenseAir Force -
Information Sharing between the Global Information Grid (GIG) and the System Wide Information Management (SWIM) system
SBC: TRIDENT SYSTEMS LLC Topic: AF081028ABSTRACT: Currently, there is no certified, Voice over Internet Protocol (VoIP)-based solution for cross-domain voice and video. More specifically, combatant commands and other agencies have requirements to enable users across different security networks to initiate and receive direct cross-domain audio and videophone calls, and to participate in audio conference calls. To address this need, Tr ...
SBIR Phase II 2014 Department of DefenseAir Force -
Robust, Lightweight Wiring for Space Applications
SBC: MINNESOTA WIRE & CABLE CO Topic: AF112093ABSTRACT: An ability to reduce the weight of cables has the potential to provide significant cost savings, reduce maintenance and improve reliability of satellites. The costs of developing and producing satellites are linearly proportional with the satellite"s weight, with each kilogram costing around $1 million when delivery-to-space costs are included. With global satellite launches expected to ...
SBIR Phase II 2014 Department of DefenseAir Force -
Joint Processing of Multi-band Signals with Information Assurance
SBC: Echo Ridge, LLC Topic: AF121063ABSTRACT: Echo Ridge proposes to prototype and evaluate GNSS processing algorithms designed to provide high accuracy and spoofing robustness (information assurance (IA)) by exploiting diversity in radio navigation signals (frequency, location, bandwidth, format) using new signal processing techniques. We will extend on-going work in the area of multi-satellite, multi-frequency GNSS signal proces ...
SBIR Phase II 2014 Department of DefenseAir Force -
Optimizing Coating Processes and Chemistries for Enhanced Hot Section, Low Cycle Fatigue (LCF) Life
SBC: Directed Vapor Technologies International, Inc. Topic: AF121171ABSTRACT: Environmental protection coatings are required to provide oxidation and hot corrosion protection to hot section turbine components. Unfortunately, the current generation of such coatings can degrade the fatigue resistance of the coated alloy. It is increasingly recognized that, due to the detrimental effect of the coating on low cycle fatigue (LCF) performance, the LCF life of a coated ...
SBIR Phase II 2014 Department of DefenseAir Force -
Corrosion Identification, Removal and Cleaning of Galvanic Couples in Difficult to Access Areas
SBC: LASER & PLASMA TECHNOLOGIES LLC Topic: AF131192Laser & Plasma Technologies (LPT) is proposing an optical fiber coupled corrosion treatment system, in which a unique thermographic imaging technique is used for early detection of corrosion. Combined with fiber laser removal and repair technologies, the system provides the capabilities of corrosion detection, removal, cleaning, and repair in difficult to access areas without damaging the underly ...
SBIR Phase I 2014 Department of DefenseAir Force -
Blast Booth Noise Reduction- An OSHA Compliance Issue
SBC: Figure Engineering, LLC Topic: AF131199ABSTRACT: The objective of this proposal is improve the safety of employees working in or around compressed air delivery blast cleaning rooms (BCR) and blast cabinets (BC) by decreasing the levels of noise exposure to below the OSHA 8-hour Time-Weighted Average (TWA) while maintaining or decreasing ergonomic stress burdened by the operators and maintaining or increasing productivity. This resear ...
SBIR Phase I 2014 Department of DefenseAir Force -
Smart Aircraft Conceptual Design in Multidisplinary Design Optimization
SBC: AVID LLC Topic: AF141083AVID will develop software to perform interactive conceptual design integration to enable improved estimates of performance, including weight and balance associated with early definition of subsystems layout and integration. The software will leverage AVID"s expertise in geometric modeling for conceptual design, along with the integration with multidisciplinary analyses. Three-dimensional visual ...
SBIR Phase I 2014 Department of DefenseAir Force -
Dual Mode Seeker/Sensor-LADAR/RF
SBC: FIBERTEK, INC. Topic: AF141136Phase I study to determine tradeoffs and feasibility of dual mode RF/LADAR seeker. Work to focus on packaging and design tradeoffs to realize a design for a cost-effective compact dual mode seeker head. Emphasis will be on the LADAR design portion of the seeker, as RF seeker design is very mature. Emphasis will also be on integration of the LADAR/RF subsystems and the handoff protocol between the ...
SBIR Phase I 2014 Department of DefenseAir Force