You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Massively Parallel High Temperature Probe System for Wafer-level Reliability Testing
SBC: Celadon Systems Inc. Topic: 910021RHistorical methods of reliability assessment are less and less effective as device sizes shrink. Larger sample sizes and longer duration tests are increasingly needed. At the same time, efforts to continue scaling semiconductors to ever smaller geometries is leading to an explosion of new device structures, materials and processes. The cost of testing these innovations is becoming a major barrier ...
SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology -
EMERGING TECHNOLOGIES RESULTING IN LIGHTER AIRCRAFT WEIGHT INCREASED ENGINE PERFORMANCE (ISP) AND IMPROVED DESIGN TOOLS
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseAir Force -
DETERMINATION OF EFFECTS OF INTEROPERABILITY ISSUES ON INTRATHEATER AIRLIFT
SBC: AMERICAN METAL PROCESSING, INC. Topic: N/ABETTER METHODS TO DELIVER AND DISSEMINATE CARGO ARE NECESSARY TO FULLY EXPLOIT THE CAPABILITIES OF FUTURE INTRATHEATER AIRLIFTERS. THE ARMY'S AND AIR FORCE RENEWED EMPHASIS ON MOBILITY WILL REQUIRE GREATER PRODUCTIVITY BY TRANSPORTATION RESOURCES TO ACHIEVE NATIONAL OBJECTIVES. THE NECESSITATES A MORE THOROUGHLY-INTEGRATED TRANSPORTATION NETWORK. ADVANCED TECHNOLGIES, MATERIALS, AND INNOVATIVE ENG ...
SBIR Phase I 1990 Department of DefenseAir Force -
MULTIPLE LASER MEASUREMENT SYSTEM
SBC: Apeiron Inc Topic: N/ATHE KEY PROBLEM TO BE ADDRESSED IN PHASE I OF THIS PROJECT WILL BE TO DETERMINE THE FEASIBILITY OF A NOVEL POSITION MEASURING SYSTEM FOR A FAMILY OF COMPUTER CONTROLLED MACHINE TOOLS. THE MULTIPLE LASER MEASUREMENT SYSTEM (MLMS), WHICH FORMS THE BASIS OF THIS PROPOSAL, WILL MEASURE THE (X, Y, Z) POSITION OF THE CUTTING HEAD DIRECTLY AT RATES AND ACCURACIES SUFFICIENT FOR CLOSED LOOP POSITION CONTR ...
SBIR Phase I 1990 Department of DefenseAir Force -
INTERACTIVE DISTRIBUTED LOGISTICS MANAGEMENT
SBC: Caps Logistics, Inc. Topic: N/ATHIS PROJECT WILL DEMONSTRATE THE PRACTICALITY OF AN INTERACTIVE, HIERARCHICAL, DISTRIBUTED PLANNING SYSTEM FOR LOGISTICS MANAGEMENT. WE WILL DESIGN A SYSTEM THAT WILL SUPPORT PARALLEL, ASYNCHRONOUS, INTERACTIVE LOGISTICS PLANNING AT MULTIPLE LEVELS OF THE MANAGEMENT HIERARCHY AND AT MULTIPLE SITES SO THAT MANY PEOPLE COOPERATIVELY BUILD AND ADMINISTER A LOGISTICS PLAN. FOR EXAMPLE, A HIGHER-LEVEL ...
SBIR Phase I 1990 Department of DefenseAir Force -
FAIL-SAFE FAULT-TOLERANT ELECTRONICS
SBC: Daina Topic: N/AFUTURE MILITARY AVIONICS SYSTEMS WILL REQUIRE AT LEAST AN ORDER OF MAGNITUDE IMPROVEMENT IN MEAN TIME BETWEEN CRITICAL FAILURES. TO ACHIEVE THIS GOAL INNOVATIVE FAIL-SAFE FAULT-TOLERANT ELECTRONIC SYSTEM DESIGN CONCEPTS WILL BE NEEDED. THE APPROACH PROPOSED BY DAINA WILL BE BASED ON THE USE OF EXTERNAL ENVIRONMENT DATA, BUILT-IN RELIABILITY MODEL, ADAPTIVE STATISTICAL SYSTEM STATE AND PARAMETER ES ...
SBIR Phase II 1990 Department of DefenseAir Force -
NEURAL NETWORK BASED EXPERT SYSTEM FOR ASTF FAULT DIAGNOSIS
SBC: Engineering Research & Consult Topic: N/AENGINEERING RESEARCH AND CONSULTING, INC. (ERCI) PROPOSES TO DEVELOP A PROTOTYPE NEURAL NETWORK BASED EXPERT SYSTEM (CONNECTIONIST EXPERT SYSTEM) FOR ASTF FAULT DIAGNOSIS. NEURAL NETWORKS ARE EXCELLENT FOR PARAMETER ESTIMATION AND RECOGNIZING PATTERNS IN SIGNAL DATA. THE OBJECTIVE OF THIS RESEARCH IS TO DESIGN A NEURAL NETWORK ARCHITECTURE TO DETECT FAULT THUS SIGNIFYING AND RESPONDING TO AN ABNOR ...
SBIR Phase I 1990 Department of DefenseAir Force -
STANDARDIZED TASK BATTERY FOR ASSESSMENT OF HUMAN-CONTROLLED ROBOTIC SYSTEM PERFORMANCE
SBC: Human Machine Interfaces Inc Topic: N/ATHIS PROJECT WILL HAVE TWO PRODUCTS. IT WILL PROVIDE 1) AN INSTRUMENTED TASK BATTERY FOR ASSESSING THE PERFORMANCE OF HUMANCONTROLLED ROBOTIC SYSTEMS (HCRS) AND 2) A STANDARDIZED PERFORMANCE ASSESSMENT SYSTEM FOR HCRS'S. THE TASK BATTERY WILL BE USEFUL FOR INVESTIGATING ALL ASPECTS OF HCRS PERFORMANCE. THE RESULTS OF THE PERFORMANCE EVALUATION SYSTEM WILL BE INDEPENDENT OF USER SKILL, AND THE PROC ...
SBIR Phase I 1990 Department of DefenseAir Force -
NONCONVENTIONAL PRECISION TRAVERSE SYSTEM
SBC: Micro Craft Inc. Topic: N/AWITH THE TREND OF DATA ACQUISITION TECHNIQUES CHANGING TO LASER VELOCIMETER SYSTEMS, THE NEED TO ACCURATELY POSITION THE LASER BEAM INSIDE THE TEST SECTION IS OF CRITICAL IMPORTANCE. A SYSTEM WHICH ALLOWS THE BEAM TO BE POSITIONED IN THE THREE TRANSLATIONAL DEGREES OF FREEDOM WILL PERMIT DATA TO BE RECORDED AT ANY POINT INSIDE THE TEST SECTION. THE PROPOSED SYSTEM WILL ACCOMPLISH THE NECESSARY MOV ...
SBIR Phase I 1990 Department of DefenseAir Force -
PULSE TO DIGITAL CONVERSION SYSTEM
SBC: Moscow Electronics Co Topic: N/ATHE COMPLETE DESIGN IS PRESENTED WITHIN THIS PROPOSAL FOR A SYSTEM WHICH WILL PROVIDE A PRECISE, ONE-STEP CONVERSION DIRECTLY FROM A PULSE TRAIN INPUT TO A DIGITIZED PULSE RATE OUTPUT. IT IS A DISTRIBUTED PROCESSOR SYSTEM EMPLOYING A MASTER CONTROL PROCESSOR AND FROM 2 TO 30 IDENTICAL PULSE MODULES. THE PULSE MODULE IS A STANDALONE UNIT WHICH PERFORMS THE PULSE PERIOD MEASUREMENT. THE MICROPROCESS ...
SBIR Phase II 1990 Department of DefenseAir Force