You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Electromagnetic Compatibility/Interoperability Research Tools For Aging Aircraft COTS Insertion
SBC: Aegis Technologies Group, LLC, The Topic: N/AThis Research and Development (R&D) effort will produce an architecture and prototype for performing quick-look analysis of Electromagnetic (EM) Compatibility (EMC) using Modeling and Simulation (M&S) technologies. The target domain will be aircraftsustainment and will focus on the insertion of commercial-off-the-shelf (COTS) technologies into existing aircraft. COTS technologies provide a cost- ...
SBIR Phase I 2003 Department of DefenseAir Force -
Automated Sanding of Aircraft Coatings
SBC: Aerobotix, Inc. Topic: AF071112Current survivability and engineering requirements for airframe platforms necessitate the automated application of numerous specialty coatings onto critical surfaces. One such critical surface is an airframes inlet duct OML surface. These specialty coatings have tight specification tolerances for the final thicknesses and surface finish. Sanding is required to meet the final thickness and surfa ...
SBIR Phase I 2007 Department of DefenseAir Force -
Graphical Indes for Aircraft Legacy Data
SBC: Anautics, Inc. Topic: N/AThis is the technical abstract. This is the anticipated benefits
SBIR Phase I 2003 Department of DefenseAir Force -
Advanced MRO Multi-Echelon Planning and Scheduling
SBC: Anautics, Inc. Topic: AF06330The objective of this proposal is to identify and integrate multi-echelon constraints in Manufacturing Repair Overhaul (MRO) process planning and scheduling. The OC-ALC depot operates in a multi-echelon MRO environment that is highly constrained regarding its capacities, resources, deadlines, and other physical limitations. The representation, capture, satisfaction and relaxation of these constra ...
SBIR Phase I 2007 Department of DefenseAir Force -
Dielectric Measuring Tool for Radome Checkout
SBC: Anautics, Inc. Topic: AF06327The main goal of this work is to develop a more reliable, robust, and accurate measurements of radome transmission properties. As a result, we propose a pilot study in order to design a two-horn testing system and provide several prototype radome testing measurements. The proposed two-horn testing system will be mainly focused on transmission efficiency mechanism. The proposed system features a ...
SBIR Phase I 2007 Department of DefenseAir Force -
Pattern Recognition for Aircraft Maintainer Troubleshooting
SBC: Anautics, Inc. Topic: AF05263Due to the significant decrease of aircraft parts across the U.S. military over past years, managing parts more efficiently has become a great necessity. The term managing suggests having the data resources available to predict, forecast events or determine an item’s use such as the mission capability of a part or weapon system. The decrease of parts can be attributed to many factors, some of w ...
SBIR Phase II 2007 Department of DefenseAir Force -
Head Alignment and Orientation (HALO) System
SBC: Archangel Systems, Inc. Topic: AF071020The objective of this proposal is to develop a low cost head tracking system to monitor the orientations of an individual’s head. This head tracker can be incorporated with a 3-D audio system that will provide cues to operators for increasing situational awareness. This proposed system will be based on Archangel’s Inertial Measurement Unit ‘IM3’. The Head Alignment and Orientation (HALO) ...
SBIR Phase I 2007 Department of DefenseAir Force -
Agent Defeat Short Term Neutralization Data Colloction and Modeling
SBC: AUBURN CHEMICAL CO., INC. Topic: N/AThis research will determine extent and nature of the neutralization of bacterial spores when they are exposed, for very short times to high temperatures, pressures, and chemicals important in Agent Defeat weapons.. An exposure system will be constructedcapable of providing the ultra-short exposure times (on the order of ms) that are characteristic of bomb explosions and will be capable of exposi ...
SBIR Phase II 2003 Department of DefenseAir Force -
Deployment Survivability for Mobile Ground Stations
SBC: BEVILACQUA RESEARCH CORPORATION Topic: N/AThe goal of this program will be to investigate the issues associated with the development of a cognitive nuclear, biological and chemical threat data correlation and munitions effects analysis support system that is capable of supporting both training andoperational deployments. BRC is a major support contractor for the Army Corps of Engineers Engineer Research & Development Center (ERDC). ...
SBIR Phase I 2003 Department of DefenseAir Force -
Configurable Dynamic Strain System
SBC: STREAMLINE AUTOMATION LLC Topic: AF071344The AEDC Engine Test Facility (ETF) has more than 20 test cells that can be used for testing prototype propulsion systems and components. The testing of propulsion systems requires significant data acquisition capabilities, with one test utilizing more than 4200 channels of instrumentation, including 200 dynamic strain gages. In response to the shear set-up challenge, AEDC has developed the conc ...
SBIR Phase I 2007 Department of DefenseAir Force