You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Manufacturing Scale-Up of High-Purity Optical Ceramics

    SBC: ENGI-MAT CO            Topic: OSD04L01

    In this effort, nGimat will develop the capabilities to produce high-quality optical ceramic nanopowder for DoD applications such as laser and missile weapons and defense systems.Development of such capabilities will require improvements in current man...

    SBIR Phase II 2016 Department of DefenseAir Force
  2. Improved Energy Conservation for Data Centers

    SBC: Green Revolution Cooling, Inc.            Topic: AF112205

    ABSTRACT:Green Revolution Cooling, an Austin, Texas-based manufacturer of submersion cooling systems for high-efficiency, high-performance data centers, aims to produce a commercially viable, all-in-one containerized data center cooling solution for cost-effective and expedited data center build-out and expansion. Featuring total submersion of computer equipment in high performance dielectric cool ...

    SBIR Phase II 2016 Department of DefenseAir Force
  3. Holographic Video Display (HVD)

    SBC: Zebra Imaging, Inc.            Topic: AF131023

    ABSTRACT: Zebra Imagings proposed approach for the HVD Phase II will advance the state-of-the-art Urban Photonic Sandtable Display Program (UPSD) light-field display architecture and incorporate the successful results of the AF131-023 HVD Phase I research.The proof-of-concept HVD Phase II optical stack will consist of a 4K SLM under a planar array of hogel optics.A design for a 90 hogel optical sy ...

    SBIR Phase II 2016 Department of DefenseAir Force
  4. Development of an Integrated Multi-mode Propulsion system for UAS Leveraging Speed and Endurance (IMPULSE)

    SBC: Area I, Inc.            Topic: AF131159

    ABSTRACT: The goal of the Phase II work is to significantly advance the maturity of the IMPULSE system through the detail design, development, and comprehensive bench testing of its power and propulsion systems. The Phase I conceptual design showed that the system was able to meet the desired performance requirements for a Group 2 SUAS. This work will expand upon this Phase I design, while maintai ...

    SBIR Phase II 2016 Department of DefenseAir Force
  5. Holographic Lightfield 3D Display Metrology (HL3DM)

    SBC: FoVI 3D, Inc.            Topic: AF141021

    ABSTRACT:In recent years, a number of technology companies have produced auto-stereoscopic 3D volumetric and light-field displays.Qualifying their performance has been a subjective exercise as there is no common base for the determination of light-field display metrology.Rattan Softwares Phase II program will develop practical, affordable, and repeatable evaluation procedures; create a suite of li ...

    SBIR Phase II 2016 Department of DefenseAir Force
  6. Augmented Reality Training for Dismounted Soldiers

    SBC: RESEARCH NETWORK INC            Topic: OSD162004X

    RNIs is proposing a novel approach for the Dismounted Augmented Reality Environment (DARE) as a component of the STE that is intended to fully integrate and interoperate with other STE components including live, virtual, and constructive domains, existing and future dismountedtraining simulations and equipment, and support cloud-based development and content delivery.

    SBIR Phase II 2016 Department of DefenseOffice of the Secretary of Defense
  7. Fully Integrated On-Chip True Time Delay Phased Array Antenna Feed

    SBC: OMEGA OPTICS, INC.            Topic: AF151005

    ABSTRACT: Silicon photonics is booming in areas of system level integration involving electronics and photonics. It has exclusive advantages over other electronic or photonic subsystems when stands alone. On-chip true time delay antenna feed can be significantly advanced using the technologies garnered through silicon photonics. Electronic true time delay antenna feed intrinsically suffers from be ...

    SBIR Phase I 2016 Department of DefenseAir Force
  8. Reconfigurable Interface Test Adapter

    SBC: AIR LOGISTICS AND ENGINEERING CONSULTANTS, LLC            Topic: AF161014

    ALAE proposes to develop a reconfigurable test adapter (RTA) that adapts differences between existing automated test systems (ATS) / Automated Test Equipment (ATE) to ensure efficient, cost-effective test program sets (TPS) transportability. Wiring from core versatile depot automated test station (VDATS) instrumentation (oscilloscopes, signal generators, counters, power supplies, etc.) will be rou ...

    SBIR Phase I 2016 Department of DefenseAir Force
  9. Automatic Test Equipment (ATE) Data Access and Management (ADAM)

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: AF161015

    The objective of this effort is to devise a risk management strategy and technology solution to automatically collect and centrally store data that is generated on what are now non-networked collections of automated test equipment (ATE).The solution concept proposed provides for meeting information assurance (IA) and cybersecurity needs.More specifically, the proposed effort will produce (i) a met ...

    SBIR Phase I 2016 Department of DefenseAir Force
  10. Radio Frequency Range Modernization, Compatibility and Capability Study

    SBC: MI Technologies            Topic: AF161016

    ABSTRACT: The proposed study will evaluate the essential measurement requirements of the subject systems and the existing workflow peripheral to the test ranges. The study will concentrate on common system requirements and identify candidate system architecture (s) that will satisfy the common requirements with the emphasis on system modernization and sustainability.Special requirements (those tha ...

    SBIR Phase I 2016 Department of DefenseAir Force
US Flag An Official Website of the United States Government